CL/PE7 CHECK LIST

CHECKLIST FOR COLUMN FORMWORK


SITE: LOCATION: DATE :
Sl # Description Yes No NA

1 Is the method statement available and checked ?


Has the starter been covered by thermofoam strip to avoid the
2
slurry leakage?
3 Has the column reinforcement checklist approved?

6 Have the cover block of required size been placed at require interval?

7 Has the shuttering board been cleaned neat & oiled properly?

8 Check if any damage on the film face of plywood?

9 Are the tied rod holes closed/sealed properly?

10 Check if the column plumb/verticality maintained?


Have the sufficient side supports given to withstand the pressure of
11
concreting without any deflection?
12 Check whether safe stagging been erected for second lift of concreting?

13 Incidence of injury to hand

14 Use of gloves, masks and safety shoe

15 Work permit

16 Any injury reported

* Observations can be written in the above space given or else behind the checklist.
Contractor: PMC : LBC Client

Revision No.: 00
Date: 17.01.2012