Check List: Checklist For Column Formwork
Check List: Checklist For Column Formwork
6 Have the cover block of required size been placed at require interval?
7 Has the shuttering board been cleaned neat & oiled properly?
15 Work permit
* Observations can be written in the above space given or else behind the checklist.
Contractor: PMC : LBC Client
Revision No.: 00
Date: 17.01.2012