Application For Witness Inspection: Ly Hong Huan Hong River Surface Water Treatment Plant Project
Application For Witness Inspection: Ly Hong Huan Hong River Surface Water Treatment Plant Project
CATEGORY OF EQUIPMENT
□ STEEL FAB. □ MACHINERY □ ELECTRICAL / INSTRUMENT
□ SPARE PARTS □ OTHERS( )
WEIGHT Remark
No DESCRIPTION MATERIAL UNIT QUANTITY UNIT/Kg
1 Pipe Nipple DN25A 304 Pcs 32
Page 1 of 2
13 Pipe ASTM A312 TP304 Sch10S DN40 304 M 6
34
35
Total
INSPECTION PHASE
□ INTERMEDIATE □ FINAL □ PACKING
INSPECTOIN / TEST ITEM
□ MATERIAL INSPECTION □ MECHANICAL RUNNING TEST □ RUST PREVENTION
CHECK
□ VISUAL INSPECTION □ PERFORMANCE TEST □ PAINTING INSPECTION
□ DIMENSIONAL INSPECTION □ QUANTITY INSPECTION □ NON-DESTRUCTIVE
INSPECTION
□ PACKING & MARKING INSPECTION
□ WELDING INSPECTION □ INSULATION RESISTANCE TEST
□ PRESSURE TEST □ WITHSTAND VOLTAGE TEST
□ LEAK TEST □ SEQUENCE TEST
□ MECHANICAL OPERATION TEST □ OTHERS ( )
COLUMN FOR KESV: □ WITNESS
( INSPECTOR : )
□ WAIVE ( DOCUMENT CHECK : )