RUWAD AL ATHAIBA( Muehlhan)

MATERIAL RECEIPT INSPECTION REPORT MIR No : 02

PROJECT : Al Noor Production Station

Client : PDO

Main contractor : Arabian Industries


Subcontractor
: RUWAD AL ATHAIBA INTERNATIONAL LLC (MUEHLHAN GROUP)
(Fireproofing )

1. Interthane 990 (RAL7035) Part A - 02 Drum


2. Interthane 990 Part B - 02 Drum
ITEM
DETAILS

Discipline Fireproofing

Reference Drawing: Rev.

Result
INSPECTION / CHECK POINT Remark No
(OK/RJ/NA)

1 Material Conformity with Contract Documents


2 Material Batch Certificate
3 Expiry date with in acceptable duration
4 Damage presence during arrival inspection
5 Material stacked on Pallets and free from running water

Legend: OK: Accepted RJ: Rejected with remarks NA: Not applicable

REMARKS:

1. Non conformity report NCR#:

Inspector RUWAD AIP PDO

Name Sinaj Siyad

Results countersigned
by: Signature

Date 8/3/2022

Doc control No : Ruwad/FP/002


RUWAD AL ATHAIBA( Muehlhan)
WEATHER REPORT -FIREPROOFING
No Date Time Ts (°C) Ta (°C) Dp (°C) RH (%) Remarks
1 3/2/2023 8:30 AM 23.9 23.9 10.9 41.9
10:30 AM 33 34.8 8.9 19.5
2:00 PM 37.6 37.6 8.1 17.8
4:00 PM 39.4 39.4 9.9 16.7
2 3/3/2023 8:30 AM 24.1 24.4 15.2 53.8
10:30 AM 29.4 29.9 15.3 40.2
3 3/4/2023 8:30 AM 25.9 26.9 17.2 52.1
10:30 AM 29.8 29.7 14.9 39.3
2:00 PM 35.5 35.6 10.9 22.6
4:00 PM 36.8 36.5 10.5 20.1
4 3/5/2023 8:30 AM 23.5 24.9 10.9 43.6
10:30 AM 29.2 29.2 11.1 31.3
2:00 PM 35.2 35.1 12.8 23.8
4:00 PM 35.3 35.4 10.5 20.2
5 3/6/2023 8:30 AM 24.1 24.2 10.6 45.6
10:30 AM 32.9 32.9 10.9 25.9
2:00 PM 35.9 36.1 9.1 16.1
4:00 PM 36.5 36.5 9 17.1
6 3/7/2023 8:30 AM 25.5 25.4 9.9 38.5
10:30 AM 33.1 33.2 10.9 20.9
2:00 PM 37.4 37.8 10.1 17.4
4:00 PM 39.7 39.9 8.9 12.6
7 3/8/2023 8:30 AM 25.8 25.9 10.1 39.1
10:30 PM 33.2 33.5 10.8 21.1
2:00 PM 36.5 36.6 11.5 18.1

Inspector RUWAD AIP PDO

Name

Results countersigned
by:
Signature

Date

Doc control No : Ruwad/FP/004