2x600 MW Singareni Thermal Power Plant (STPP) Post Project Environment Monitoring Analysis as per MoEF&CC/CPCB and concern

SPCB guidel

No. of
Sl.No Environmental Monitoring parameters Samples/stations/ Frequency
Locations

Micro Meteorological Stations (MMS) (Temp., Relative


1 Humidity,Wind speed, Wind direction, Rainfall & Atmospheric 1 Daily
Pressure, Solar Radiation etc.

2
Ambient Air Quality
9
1.Pegadapalli
2.Jaipur
3.Tekumatla
4. Civil Office
5.Labour Camp
6.Dubbapalli
PM10, PM2.5, SO2, NOx, Pb, Ni, As, CO, Hg, 7.Weigh bridge
i) Monthly Once
O3, NH4, C6H6, & Benzo(a)pyrene- 13 parameters. 8.Stack reclaimer
9.Rasulpalli

9 1.Pegadapalli
2.Jaipur
3.Tekumatla
4. Civil Office
ii) PM10, PM2.5, SO2, NOx, Hg 5.Labour Camp Twice a Week
6.Dubbapalli
7.Weigh bridge
8.Stack reclaimer
9.Rasulpalli

iii) Heavy Metal in Particulate Matter Quarterly


5 1.Pegadapalli
2.Jaipur
3.Tekumatla
4. Dubbapalli
5. .Rasulpalli
3
Stack Monitoring (Offline)
SPM, SOx, NOx,Hg, CO, CO2, O2. 2 Weekly Once
4
Water Quality Monitoring

4 1. Tekumatla
upstream 2.Tekumatla Down stream
i Surface Water Quality Quarterly
3. Elkanti tank (Cheruvu) 4. Indaram
tank
13 1.Near
Check post corner (Mc Nally Bharat office lane)
2. Plant back side, for dust supression water filling point
3. Cement bricks manufacturing area
4. Labour colony area-worker staying place
5. Coal yard (STPP)
6. Coal yard (STPP)
ii Ground Water Quality 7.Coal yard (STPP)
8. Sunil Hi-tech site office
9. Pegadapalli Village SC colony Hand pump
10. Gangipalli Village (Hand pump)
11. Elakanti Village (Hand pump)
12. SW corner of Plant in Tekumatlavagu
13. In between Western Edge of the plant& Railway bridge in
Tekumatla vagu.

iii

7 1.Pw-1
Opp.Mc Nally Bharat
Site Office Nwn Direction To
Ash Dyke
2. Pw-2 North Direction To Ash
Dyke
3. Pw-3 North-East Direction To
Ash Dyke
Piezmteric Wells (Quality & Levels) 4. Pw-4 South-East Direction To
Ash Dyke
5. Pw-5 North-West Directon To
Ash Dyke
6. Pw-5 North-West Directon To
Ash Dyke
7. Pw-5 North-West Directon To
Ash Dyke

3
Lamella Clarifier/Central Monitoring Basin (CMB)/ETP - (Total 32 1.ETP O/L water
iv Monthly once
Parameters including Biological Parameter and Heavy Metals) 2.Sludge water 3.CSSP (CHP) O/L
water
Sewage Treatment Plant (11 Parameters) – pH, TDS, TSS, COD,
2 STP :
v BOD, O&G, Sulphates, MLSS(inlet sample), MLVSS(inlet sample), Monthly once
Inlet & Outlet
Total Nitrogen, Total Phosphates & Colifarms

Surface runoff water (Total 32 1 STPP Surface runoff


vi Quarterly
Parameters including Biological Parameter and Heavy Metals) water near Hydrogen plant

8 (Core Zone)
1. STPP Site office/ CISF office
2. Weigh Bridge near Main Gate
3. Labour Camp
4. Near Staker reclaimer
5 Noise Levels (Day/Night) (***Include TG area & Air Compressor house) Monthly once
(Buffer Zone)
5. Tekumatla Village
6. Jaipur Village
7. Rasulaplli Village
8. Pegadapalli Village

6
Coal Analysis
Heavy Metals, Sulphur Content & Ash Content
4 Monthly once

7 Fly Ash, Bottom Ash &Heavy metals (As, Hg, Cr, Pb),
Moisture content & loss on Ignition

8 Heavy metals in Ash Pond Effluents (As, Hg,


Cr, Pb along with pH, TSS & O&G (Monthly once) Quarterly
2

9 3
DG set Emissions
10
2
Sulphur Content and Calorific Value in LDO & HFO

Note : Auto renewal of CFO for 5 years of 2 x 600 MW, STPP- obtain from TSPCB authorities.