Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 1

RCC REMARKS

1 RED LAMP PROTECTION S-1 IS RED.


2 NO LIGHT PROTECTION S-1 IS LIT.
3 CALLING ON  CLEARS AFTER 1 MIN ON OCCUPATION OF 1AT
 CLEARS AFTER OCCUPATION OF L1T1
4 RELEASED BY RELEASED BY S-48
5 REQUIRED ROUTE SET & LOCKED S-18 OR C-18 ROUTE SET & LOCKED
6 AUTOMATIC ROUTE RELEASE AUTOMATIC ROUTE RELEASE AFTER 2 MIN OF CLEARANCE OF 40BT
7 GATE SLOT  CONT. BY 49GS
 CONT. BY GATE SLOT GS2 OF LC NO-CT45.
8 TLBI  CONTROLLED BY TGT CONTROL OF (SQQ-KIS) SECTION TLBI &
BLOCK SECTION AXLE COUNTER
 CONTROLLED BY TGT CONTROL OF (CROSSING STN - VEDANTA
INPLANT-L1) SECTION S/L BPAC BLOCK PANEL.
9 DLBI  REQUIRES LINE CLEAR OF DLBI FOR SEC:(SQQ-NRG) & BLOCK
SECTION AXLE COUNTER
 REQUIRES LINE CLEAR OF D/L SSBPAC (D) FOR SEC:(SQQ-NRG)
10 POINT IN CATCH/SLIP SIDING POINT 31 CAN BE OPERATED IN TGT OR TCF CONDITION OF TLBI OF
(KVLS-BGHU) SECTION.
11 LONGHAUL →S/H STARTER (S7) DURING OCCUPATION OF 18BT, TO START OVERLAP RELEASE TIME
DELAY, S7 SIGNAL CANCELLATION IS REQUIRED.
12 ADV. STR. IN IB SECTION (IB-7) S7 IS LIT OR LVV-UDXT IS CLEAR.
13 SUBROUTE SECTIONAL ROUTE RELEASE PROVIDED WITH 40_TLSR.
14 5 SEC STR  5 SEC. TIME DELAY (STR) TO BE PROVIDED
 SIGNAL FLY BACK AFTER 5 SEC ON OCCUPATION OF
REPLACEMENT TRACK.
15 SLOT WORKING  IN SLOT-50 TSR, S16 RED IS PROVED.
 SLOT-199 OF UTCL NOT RECEIVED.
 SLOT EXTENDED TO UTCL YARD FOR DN TRAINS.

You might also like