COEFFICIENT METHOD

4.70 3.00 6.05 3.75 3.75


2.00

CASE 3 CASE 3 CASE 6

RAMP
Case 3
TOTAL UNIFORM DEAD LOAD
COEFFICIENT FOR NEGATIVE MOMENTS IN SLABS
Ca (-) = 0.000 (-) Ma = 0.000 ft-lbs.
Cb (-) = 0.035 (-) Mb = 5397.119 ft-lbs.
COEFFICIENT FOR DEAD LOAD POSITIVE MOMENTS IN SLABS
Ca (+dl) = 0.062 (+dl) Ma = 331.171 ft-lbs.
Cb (+dl) = 0.011 (+dl) Mb = 537.655 ft-lbs.
COEFFICIENT FOR LIVE LOAD POSITIVE MOMENTS IN SLABS
Ca (+ll) = 0.071 (+ll) Ma = 817.226 ft-lbs.
Cb (+ll) = 0.011 (+ll) Mb = 1158.583 ft-lbs.
RATIO OF LOAD DIRECTIONS FOR SHEAR IN SLAB AND LOAD ON SUPPORTS
0.33 Wa = 0.610
0.33 Wb = 0.310

NEGATIVE MOMENTS @ CONTINUOUS EDGES


Ma (-) = 0.000 ft-lbs. 0.00 kN-m
Mb (-) = 5397.119 ft-lbs. 7.32 kN-m
POSITIVE MOMENTS TOTAL
Ma (+dl) = 331.171 ft-lbs.
1148.396 ft-lbs. 1.56
Ma (+ll) = 817.226 ft-lbs.
Mb (+dl) = 537.655 ft-lbs.
1696.237 ft-lbs. 2.30
Mb (+ll) = 1158.583 ft-lbs.
NEGATIVE MOMENTS @ DISCONTINUOUS EDGES
Ma (+) = 382.799 ft-lbs. 0.52 kN-m
Mb (+) = 565.412 ft-lbs. 0.77 kN-m
(CASE 3) NOTE : M = S/L Roof Deck
M= 0.33 DL = 103.3829
Ca = 2.00 m 6.56 ft LL = 167.08347
Cb = 6.05 m 19.85 ft
FACTORED LOADS
(CASE 8) NOTE : M = S/L ROOF DECK : 391.39304
M= 0.43
Ca = 2.00 m 6.56 ft
Cb = 4.70 m 15.42 ft

FLOORING
Case 8
TOTAL UNIFORM DEAD LOAD
COEFFICIENT FOR NEGATIVE MOMENTS IN SLABS
Ca (-) = 0.061 (-) Ma = 1027.952 ft-lbs.
Cb (-) = 0.036 (-) Mb = 3350.282 ft-lbs.
COEFFICIENT FOR DEAD LOAD POSITIVE MOMENTS IN SLABS
Ca (+dl) = 0.036 (+dl) Ma = 192.293 ft-lbs.
Cb (+dl) = 0.013 (+dl) Mb = 383.477 ft-lbs.
COEFFICIENT FOR LIVE LOAD POSITIVE MOMENTS IN SLABS
Ca (+ll) = 0.049 (+ll) Ma = 564.001 ft-lbs.
Cb (+ll) = 0.016 (+ll) Mb = 1017.043 ft-lbs.
RATIO OF LOAD DIRECTIONS FOR SHEAR IN SLAB AND LOAD ON SUPPORTS
0.43 Wa = 0.610
0.43 Wb = 0.390

NEGATIVE MOMENTS @ CONTINUOUS EDGES


Ma (-) = 1027.952 ft-lbs.
Mb (-) = 3350.282 ft-lbs.
POSITIVE MOMENTS
Ma (+dl) = 192.293 ft-lbs.
1.56 kN-m
Ma (+ll) = 564.001 ft-lbs.
Mb (+dl) = 383.477 ft-lbs.
2.30 kN-m
Mb (+ll) = 1017.043 ft-lbs.
NEGATIVE MOMENTS @ DISCONTINUOUS EDGES
Ma (+) = 252.098 KN-m.
Mb (+) = 466.840 KN-m.
Roof Deck
psf 4.95 Kpa
psf 8 KPa

FACTORED LOADS
psf 39.6 KPa

OAD
TS IN SLABS

MENTS IN SLABS

MENTS IN SLABS

ND LOAD ON SUPPORTS

1.39 kN-m
4.54 kN-m
TOTAL

756.293 ft-lbs. 1.03 kN-m

1400.520 ft-lbs. 1.90 kN-m

0.34 kN-m
0.63 kN-m
DESIGN OF SLA
ACI-318
ROOF DECK
Design Data
Fc' : 3,000 psi (20.7 Mpa)
Fy : 40,000 psi (275 MPa)
ρb : 0.037120570866142
ρbmax : 0.027840428149606
ρmin : 0.00500
DESIGN MOMENT ( (-) Short Direction) : 5,397.12 ft-lbs
ASSUME ρ : 0.0067
SLAB WIDTH : 12 " 304.8
REQUIRED DEPTH "D" : 4.87 123.7975
ASSUME BAR DIAMETER : 0.47244094488189 "
NO. OF BAR LAYERS : 1
MINIMUM REQD SLAB DEPTH : 6.33
SUPPLIED DEPTH : 10 254
EFFECTIVE DEPTH : 8.54133858267717
REQUIRED STEEL AREA : 0.682623779527559
REQD SPACING : 3.08
say USE!!! : 6 " o.c. 152.4
ACTUAL STEEL RATIO : 0.003420643009209
MOMENT CAPACITY : 8742.09573697654 ft-lbs SAFE!
DESIGN MOMENT ( (+) Short Direction) : 1,148.40 ft-lbs
ASSUME ρ : 0.0133
SLAB WIDTH : 12 "
REQUIRED DEPTH "D" : 1.64
ASSUME BAR DIAMETER : 0.393700787401575 "
NO. OF BAR LAYERS : 1
MINIMUM REQD SLAB DEPTH : 2.98
SUPPLIED DEPTH : 10
EFFECTIVE DEPTH : 8.65944881889764
REQUIRED STEEL AREA : 1.38204803149606
REQD SPACING : 1.06 12
say USE!!! : 4 " o.c. 101.6
ACTUAL STEEL RATIO : 0.00351457007676
MOMENT CAPACITY : 9225.26267456974 ft-lbs SAFE!
DESIGN MOMENT ( (-) Long Direction) : 5,397.12 ft-lbs
ASSUME ρ : 0.0120
SLAB WIDTH : 12 "
REQUIRED DEPTH "D" : 3.71
ASSUME BAR DIAMETER : 0.47244094488189 "
NO. OF BAR LAYERS : 1
MINIMUM REQD SLAB DEPTH : 4.70
SUPPLIED DEPTH : 10
EFFECTIVE DEPTH : 9.01377952755906
REQUIRED STEEL AREA : 1.2979842519685
REQD SPACING : 1.62
say USE!!! : 5.94 " o.c. 150.876
ACTUAL STEEL RATIO : 0.003274097166679
MOMENT CAPACITY : 9329.86939060776 ft-lbs SAFE!
DESIGN MOMENT ( (+) Long Direction) : 1,696.24 ft-lbs
ASSUME ρ : 0.0060
SLAB WIDTH : 12 "
REQUIRED DEPTH "D" : 2.87
ASSUME BAR DIAMETER : 0.47244094488189 "
NO. OF BAR LAYERS : 1
MINIMUM REQD SLAB DEPTH : 3.86
SUPPLIED DEPTH : 10
EFFECTIVE DEPTH : 9.01377952755906
REQUIRED STEEL AREA : 0.648234968503937
REQD SPACING : 3.25 8.91
say USE!!! : 5.94 " o.c. 150.876
ACTUAL STEEL RATIO : 0.003274097166679
MOMENT CAPACITY : 9329.86939060776 ft-lbs SAFE!

SAFE!
NOT SAFE
DESIGN OF SLAB
ACI-318
ROOF DECK
Design Data
(20.7 Mpa) Fc' : 3,000 psi
(275 MPa) Fy : 40,000 psi
ρb : 0.037120570866142
ρbmax : 0.027840428149606
ρmin : 0.00500
DESIGN MOMENT ( (-) Short Direction) : 1,027.95 ft-lbs
ASSUME ρ : 0.0067
SLAB WIDTH : 12 "
REQUIRED DEPTH "D" : 2.13
ASSUME BAR DIAMETER : 0.393700787401575 "
NO. OF BAR LAYERS : 1
MINIMUM REQD SLAB DEPTH : 3.47
SUPPLIED DEPTH : 8
EFFECTIVE DEPTH : 6.65944881889764
REQUIRED STEEL AREA : 0.532223149606299
REQD SPACING : 2.74
say USE!!! : 6.00 " o.c.
ACTUAL STEEL RATIO : 0.003046722586987
MOMENT CAPACITY : 4747.6231668497 ft-lbs
DESIGN MOMENT ( (+) Short Direction) : 756.29 ft-lbs
ASSUME ρ : 0.0133
SLAB WIDTH : 12 "
REQUIRED DEPTH "D" : 1.33
ASSUME BAR DIAMETER : 0.393700787401575 "
NO. OF BAR LAYERS : 1
MINIMUM REQD SLAB DEPTH : 2.67
SUPPLIED DEPTH : 8
EFFECTIVE DEPTH : 6.65944881889764
REQUIRED STEEL AREA : 1.06284803149606
REQD SPACING : 1.37
say USE!!! : 4 " o.c.
ACTUAL STEEL RATIO : 0.004570083880481
MOMENT CAPACITY : 7033.99741616034 ft-lbs
DESIGN MOMENT ( (-) Long Direction) : 3,350.28 ft-lbs
ASSUME ρ : 0.0120
SLAB WIDTH : 12 "
REQUIRED DEPTH "D" : 2.93
ASSUME BAR DIAMETER : 0.47244094488189 "
NO. OF BAR LAYERS : 1
MINIMUM REQD SLAB DEPTH : 3.91
SUPPLIED DEPTH : 8
EFFECTIVE DEPTH : 7.01377952755906
REQUIRED STEEL AREA : 1.0099842519685
REQD SPACING : 2.08
say USE!!! : 5.94 " o.c.
ACTUAL STEEL RATIO : 0.004207715668319
MOMENT CAPACITY : 7205.00610972592 ft-lbs
DESIGN MOMENT ( (+) Long Direction) : 1,400.52 ft-lbs
ASSUME ρ : 0.0060
SLAB WIDTH : 12 "
REQUIRED DEPTH "D" : 2.61
ASSUME BAR DIAMETER : 0.47244094488189 "
NO. OF BAR LAYERS : 1
MINIMUM REQD SLAB DEPTH : 3.60
SUPPLIED DEPTH : 8
EFFECTIVE DEPTH : 7.01377952755906
REQUIRED STEEL AREA : 0.504402968503937
REQD SPACING : 4.17
say USE!!! : 5.94 " o.c.
ACTUAL STEEL RATIO : 0.004207715668319
MOMENT CAPACITY : 7205.00610972592 ft-lbs

SAFE!
NOT SAFE
(28 Mpa)
(275 MPa)

88.08
203.2

69.7178
152.4

SAFE!

203.2

9
101.6

SAFE!
150.876

SAFE!

8.91
150.876

SAFE!
DESIGN OF FOOTING 1 (GL-A) OPENING:

Max. DL = 100.295 KN MDL = 0.291 KN-m


Max. LL = 78.463 KN MLL = 0.052 KN-m
qa = 266 kPa qe = 241.8 kPa

Assumed Dimension of Footing


L /W 0.860 m
Area of Footing : 0.7392804 m2
say 1.500 m

FOR d TRY: 20 mm Ø Eccentricity of Loadings :


d: 0.2 m e= 0.002 m
200 mm 1.92 mm

Max. P
(AXIAL LOAD) = 245.8948 qa(ACTUAL) = 61.798 KPA

Max. M 0.4324
(MOMENT) =
B= 2.00
H= 2.00
AREA = 4.00
I= 1.3333333333

Check for Punching Shear :

L= 2.000 m 𝑽𝒑= 𝑽𝒖/(∅𝒃𝒐𝒅)


W= 2.000 m Vp =
c= 0.500 m
d/2 = 0.1 m Allowable Punching Stress :
bo= 0.700 m 𝑽𝒂= √(𝒇𝒄^′ )/𝟑
Va =
Pu = 245.8948 kN
qu = 61.474 kPa ∴
Vu = 215.773 kN

Check for One Way Shear :

L= 2.000 m 𝑽𝒑= 𝑽𝒖/(∅𝒃𝒅)


W= 2.000 m Vp =
c= 0.500 m
A= 0.750 m Allowable Punching Stress :
B= 0.550 m 𝑽𝒂= √(𝒇𝒄^′ )/𝟔
Va =
Vu = 67.621 kN

Design Bending :

L= 2.000 m 𝑴𝒖= ∅ 𝑹𝒖 𝒃 𝒅𝟐
W= 2.000 m
A= 0.750 m Ru = 0.482796875
qu = 61.798 kPa
Mu = 34.761 kN.m ρ = 0.00117870742959171
34761375 N.mm
ρmin = 0.0033816425120773

∴ use : ρ = 0.003381642512077

for Reinforcement :
As = 1352.6570048 m2
try 20mm Ø Spacing of Rebars:
N= 4.300976168 bars s= 350
say N = 5 bars = 6 say s = 350

Design Bending :

L= 2.000 m 𝑴𝒖= ∅ 𝑹𝒖 𝒃 𝒅𝟐
W= 2.000 m
A= 0.750 m Ru = 0.482796875
qu = 61.798 kPa
Mu = 34.761 kN.m ρ = 0.00117870742959171
34761375 N.mm
ρmin = 0.0033816425120773

∴ use : ρ = 0.003381642512077

for Reinforcement :
As = 1352.6570048 m2 Spacing of Rebars:
try 20mm Ø s= 150
N= 4.300976168 bars say s = 150
say N = 5 bars = 6

Check for Development Length :

Required Ld : 𝑨𝒃 𝒇𝒚)/√(𝒇𝒄^′
𝑳𝒅=(𝟎.𝟎𝟐 𝑨𝒃=𝑨𝒃𝒂𝒓) ; Required Ld (min)
𝑳𝒅 : =𝟎.𝟎𝟔𝒅𝒃𝒂𝒓 𝒇𝒚
𝒎𝒊𝒏

Ab = 314.159 m2 Required Ld (min) = 496.80 mm


Required Ld = 500.61 mm

A= 0.750 m
750 mm

Required Ld (furnished) = 680 mm

∴ safe!
γconcrete : 24 kN/m3

γsoil : 17 kN/m3

1.00
try 1 to 2 times width of column:
Column Dimension : 0.5 m
H: 0.3 mm
H

fc' = 27 Mpa
fy = 414 Mpa

Check for Footing Bearin

0.453304 Mpa 𝐹𝑏=∅ 0.85 𝑓𝑐^′ 𝐴1 √(𝐴2/𝐴1

∅=0.70 (𝑓𝑜𝑟 𝐵𝑒𝑎𝑟𝑖𝑛𝑔)

1.732051 Mpa
c=
safe! d=
A1 =
A2 =

√(𝐴2/
𝐴1)=
0.143695 Mpa
∴ use
√(𝐴2/
𝐴1)=

√(𝐴2/
𝐴1)=
0.866025 Mpa

safe!

1−(2
; 𝑅𝑢)/(0.85𝑓𝑐^′ 0.9579261982571
)=
0742959171

0.003381642512077

ρactual = 0.0125663706144 ωactual= 0.1926843494


mm Mu = 124.49809 kN.m
mm ∴ safe!

1−(2
; 𝑅𝑢)/(0.85𝑓𝑐^′ 0.9579261982571
)=
0742959171

0.003381642512077

ρactual = 0.0125663706144 ωactual= 0.1926843494


mm Mu = 124.49809 kN.m
mm ∴ safe!

gth :

𝒇𝒚
safe!
unsafe!

Check for Footing Bearing Strength :

Fbactual = 245.8948 kN
=∅ 0.85 𝑓𝑐^′ 𝐴1 √(𝐴2/𝐴1)
𝑏

Fb = 8032.5 kN
=0.70 (𝑓𝑜𝑟 𝐵𝑒𝑎𝑟𝑖𝑛𝑔)

∴ safe!

0.500 m
0.2 m
0.25 m2
1.69 m2

√(𝐴2/
𝐴1)= 2.60 > 2.00

√(𝐴2/
𝐴1)=
√(𝐴2/
𝐴1)= 2.00
DESIGN OF FOOTING 1 (GL-A) OPENING:

Max. DL = 174.923 KN MDL = 3.005 KN-m


Max. LL = 170.923 KN MLL = 3.021 KN-m
qa = 252.7 kPa qe = 228.5 kPa

Assumed Dimension of Footing


L /W 1.230 m
Area of Footing : 1.5135492 m2
say 1.500 m

FOR d TRY: 20 mm Ø Eccentricity of Loadings :


d: 0.2 m e= 0.017 m
200 mm 17.42 mm

Max. P
(AXIAL LOAD) = 483.3844 qa(ACTUAL) = 127.1758 KPA

Max. M 8.4396
(MOMENT) =
B= 2.00
H= 2.00
AREA = 4.00
I= 1.3333333333

Check for Punching Shear :

L= 2.000 m 𝑽𝒑= 𝑽𝒖/(∅𝒃𝒐𝒅)


W= 2.000 m Vp =
c= 0.500 m
d/2 = 0.1 m Allowable Punching Stress :
bo= 0.700 m 𝑽𝒂= √(𝒇𝒄^′ )/𝟑
Va =
Pu = 483.3844 kN
qu = 120.846 kPa ∴
Vu = 424.170 kN

Check for One Way Shear :

L= 2.000 m 𝑽𝒑= 𝑽𝒖/(∅𝒃𝒅)


W= 2.000 m Vp =
c= 0.500 m
A= 0.750 m Allowable Punching Stress :
B= 0.550 m 𝑽𝒂= √(𝒇𝒄^′ )/𝟔
Va =
Vu = 132.931 kN

Design Bending :

L= 2.000 m 𝑴𝒖= ∅ 𝑹𝒖 𝒃 𝒅𝟐
W= 2.000 m
A= 0.750 m Ru = 0.993560938
qu = 127.176 kPa
Mu = 71.536 kN.m ρ = 0.00245423308980555
71536387.5 N.mm
ρmin = 0.0033816425120773

∴ use : ρ = 0.003381642512077

for Reinforcement :
As = 1352.6570048 m2
try 20mm Ø Spacing of Rebars:
N= 4.300976168 bars s= 350
say N = 5 bars = 6 say s = 350

Design Bending :

L= 2.000 m 𝑴𝒖= ∅ 𝑹𝒖 𝒃 𝒅𝟐
W= 2.000 m
A= 0.750 m Ru = 0.993560938
qu = 127.176 kPa
Mu = 71.536 kN.m ρ = 0.00245423308980555
71536388 N.mm
ρmin = 0.0033816425120773

∴ use : ρ = 0.003381642512077

for Reinforcement :
As = 1352.6570048 m2 Spacing of Rebars:
try 20mm Ø s= 150
N= 4.300976168 bars say s = 150
say N = 5 bars = 6

Check for Development Length :

Required Ld : 𝑨𝒃 𝒇𝒚)/√(𝒇𝒄^′
𝑳𝒅=(𝟎.𝟎𝟐 𝑨𝒃=𝑨𝒃𝒂𝒓) ; Required Ld (min)
𝑳𝒅 : =𝟎.𝟎𝟔𝒅𝒃𝒂𝒓 𝒇𝒚
𝒎𝒊𝒏

Ab = 314.159 m2 Required Ld (min) = 496.80 mm


Required Ld = 500.61 mm

A= 0.750 m
750 mm

Required Ld (furnished) = 680 mm

∴ safe!
γconcrete : 24 kN/m3

γsoil : 17 kN/m3

1.00
try 1 to 2 times width of column:
Column Dimension : 0.5 m
H: 0.3 mm
H

fc' = 27 Mpa
fy = 414 Mpa

Check for Footing Bearin

0.891113 Mpa 𝐹𝑏=∅ 0.85 𝑓𝑐^′ 𝐴1 √(𝐴2/𝐴1

∅=0.70 (𝑓𝑜𝑟 𝐵𝑒𝑎𝑟𝑖𝑛𝑔)

1.732051 Mpa
c=
safe! d=
A1 =
A2 =

√(𝐴2/
𝐴1)=
0.282478 Mpa
∴ use
√(𝐴2/
𝐴1)=

√(𝐴2/
𝐴1)=
0.866025 Mpa

safe!

1−(2
; 𝑅𝑢)/(0.85𝑓𝑐^′ 0.9134151688453
)=
3308980555

0.003381642512077

ρactual = 0.0125663706144 ωactual= 0.1926843494


mm Mu = 124.49809 kN.m
mm ∴ safe!

1−(2
; 𝑅𝑢)/(0.85𝑓𝑐^′ 0.9134151688453
)=
3308980555

0.003381642512077

ρactual = 0.0125663706144 ωactual= 0.1926843494


mm Mu = 124.49809 kN.m
mm ∴ safe!

gth :

𝒇𝒚
safe!
unsafe!

Check for Footing Bearing Strength :

Fbactual = 483.3844 kN
=∅ 0.85 𝑓𝑐^′ 𝐴1 √(𝐴2/𝐴1)
𝑏

Fb = 8032.5 kN
=0.70 (𝑓𝑜𝑟 𝐵𝑒𝑎𝑟𝑖𝑛𝑔)

∴ safe!

0.500 m
0.2 m
0.25 m2
1.69 m2

√(𝐴2/
𝐴1)= 2.60 > 2.00

√(𝐴2/
𝐴1)=
√(𝐴2/
𝐴1)= 2.00
DESIGN OF FOOTING 1 (GL-A) OPENING:

Max. DL = 158.81 KN MDL = 1.972 KN-m


Max. LL = 152.952 KN MLL = 2.532 KN-m
qa = 266 kPa qe = 241.8 kPa

Assumed Dimension of Footing


L /W 1.135 m
Area of Footing : 1.2893383 m2
say 1.500 m

FOR d TRY: 20 mm Ø Eccentricity of Loadings :


d: 0.2 m e= 0.014 m
200 mm 14.45 mm

Max. P
(AXIAL LOAD) = 435.2952 qa(ACTUAL) = 113.637 KPA

Max. M 6.4176
(MOMENT) =
B= 2.00
H= 2.00
AREA = 4.00
I= 1.3333333333

Check for Punching Shear :

L= 2.000 m 𝑽𝒑= 𝑽𝒖/(∅𝒃𝒐𝒅)


W= 2.000 m Vp =
c= 0.500 m
d/2 = 0.1 m Allowable Punching Stress :
bo= 0.700 m 𝑽𝒂= √(𝒇𝒄^′ )/𝟑
Va =
Pu = 435.2952 kN
qu = 108.824 kPa ∴
Vu = 381.972 kN

Check for One Way Shear :

L= 2.000 m 𝑽𝒑= 𝑽𝒖/(∅𝒃𝒅)


W= 2.000 m Vp =
c= 0.500 m
A= 0.750 m Allowable Punching Stress :
B= 0.550 m 𝑽𝒂= √(𝒇𝒄^′ )/𝟔
Va =
Vu = 119.706 kN

Design Bending :

L= 2.000 m 𝑴𝒖= ∅ 𝑹𝒖 𝒃 𝒅𝟐
W= 2.000 m
A= 0.750 m Ru = 0.887789063
qu = 113.637 kPa
Mu = 63.921 kN.m ρ = 0.00218758147326423
63920812.5 N.mm
ρmin = 0.0033816425120773

∴ use : ρ = 0.003381642512077

for Reinforcement :
As = 1352.6570048 m2
try 20mm Ø Spacing of Rebars:
N= 4.300976168 bars s= 350
say N = 5 bars = 6 say s = 350

Design Bending :

L= 2.000 m 𝑴𝒖= ∅ 𝑹𝒖 𝒃 𝒅𝟐
W= 2.000 m
A= 0.750 m Ru = 0.887789063
qu = 113.637 kPa
Mu = 63.921 kN.m ρ = 0.00218758147326423
63920813 N.mm
ρmin = 0.0033816425120773

∴ use : ρ = 0.003381642512077

for Reinforcement :
As = 1352.6570048 m2 Spacing of Rebars:
try 20mm Ø s= 150
N= 4.300976168 bars say s = 150
say N = 5 bars = 6

Check for Development Length :

Required Ld : 𝑨𝒃 𝒇𝒚)/√(𝒇𝒄^′
𝑳𝒅=(𝟎.𝟎𝟐 𝑨𝒃=𝑨𝒃𝒂𝒓) ; Required Ld (min)
𝑳𝒅 : =𝟎.𝟎𝟔𝒅𝒃𝒂𝒓 𝒇𝒚
𝒎𝒊𝒏

Ab = 314.159 m2 Required Ld (min) = 496.80 mm


Required Ld = 500.61 mm

A= 0.750 m
750 mm

Required Ld (furnished) = 680 mm

∴ safe!
γconcrete : 24 kN/m3

γsoil : 17 kN/m3

1.00
try 1 to 2 times width of column:
Column Dimension : 0.5 m
H: 0.3 mm
H

fc' = 27 Mpa
fy = 414 Mpa

Check for Footing Bearin

0.802461 Mpa 𝐹𝑏=∅ 0.85 𝑓𝑐^′ 𝐴1 √(𝐴2/𝐴1

∅=0.70 (𝑓𝑜𝑟 𝐵𝑒𝑎𝑟𝑖𝑛𝑔)

1.732051 Mpa
c=
safe! d=
A1 =
A2 =

√(𝐴2/
𝐴1)=
0.254376 Mpa
∴ use
√(𝐴2/
𝐴1)=

√(𝐴2/
𝐴1)=
0.866025 Mpa

safe!

1−(2
; 𝑅𝑢)/(0.85𝑓𝑐^′ 0.9226327614379
)=
8147326423

0.003381642512077

ρactual = 0.0125663706144 ωactual= 0.1926843494


mm Mu = 124.49809 kN.m
mm ∴ safe!

1−(2
; 𝑅𝑢)/(0.85𝑓𝑐^′ 0.9226327614379
)=
8147326423

0.003381642512077

ρactual = 0.0125663706144 ωactual= 0.1926843494


mm Mu = 124.49809 kN.m
mm ∴ safe!

gth :

𝒇𝒚
safe!
unsafe!

Check for Footing Bearing Strength :

Fbactual = 435.2952 kN
=∅ 0.85 𝑓𝑐^′ 𝐴1 √(𝐴2/𝐴1)
𝑏

Fb = 8032.5 kN
=0.70 (𝑓𝑜𝑟 𝐵𝑒𝑎𝑟𝑖𝑛𝑔)

∴ safe!

0.500 m
0.2 m
0.25 m2
1.69 m2

√(𝐴2/
𝐴1)= 2.60 > 2.00

√(𝐴2/
𝐴1)=
√(𝐴2/
𝐴1)= 2.00
DESIGN OF FOOTING 1 (GL-A) OPENING:

Max. DL = 190.801 KN MDL = 5.535 KN-m


Max. LL = 191.461 KN MLL = 5.879 KN-m
qa = 266 kPa qe = 241.8 kPa

Assumed Dimension of Footing


L /W 1.257 m
Area of Footing : 1.5809016 m2
say 1.500 m

FOR d TRY: 20 mm Ø Eccentricity of Loadings :


d: 0.2 m e= 0.030 m
200 mm 29.86 mm

Max. P
(AXIAL LOAD) = 535.2988 qa(ACTUAL) = 119.641976 KPA

Max. M 16.0484
(MOMENT) =
B= 2.20
H= 2.20
AREA = 4.84
I= 1.9521333333

Check for Punching Shear :

L= 2.200 m 𝑽𝒑= 𝑽𝒖/(∅𝒃𝒐𝒅)


W= 2.200 m Vp =
c= 0.500 m
d/2 = 0.1 m Allowable Punching Stress :
bo= 0.700 m 𝑽𝒂= √(𝒇𝒄^′ )/𝟑
Va =
Pu = 535.2988 kN
qu = 110.599 kPa ∴
Vu = 481.105 kN

Check for One Way Shear :

L= 2.200 m 𝑽𝒑= 𝑽𝒖/(∅𝒃𝒅)


W= 2.200 m Vp =
c= 0.500 m
A= 0.850 m Allowable Punching Stress :
B= 0.650 m 𝑽𝒂= √(𝒇𝒄^′ )/𝟔
Va =
Vu = 158.156 kN

Design Bending :

L= 2.200 m 𝑴𝒖= ∅ 𝑹𝒖 𝒃 𝒅𝟐
W= 2.200 m
A= 0.850 m Ru = 1.200573995
qu = 119.642 kPa
Mu = 95.085 kN.m ρ = 0.00298003689447522
95085460.393 N.mm
ρmin = 0.0033816425120773

∴ use : ρ = 0.003381642512077

for Reinforcement :
As = 1487.9227053 m2
try 20mm Ø Spacing of Rebars:
N = 4.7310737848 bars s= 390
say N = 5 bars = 6 say s = 390

Design Bending :

L= 2.200 m 𝑴𝒖= ∅ 𝑹𝒖 𝒃 𝒅𝟐
W= 2.200 m
A= 0.850 m Ru = 1.200573995
qu = 119.642 kPa
Mu = 95.085 kN.m ρ = 0.00298003689447522
95085460 N.mm
ρmin = 0.0033816425120773

∴ use : ρ = 0.003381642512077

for Reinforcement :
As = 1487.9227053 m2 Spacing of Rebars:
try 20mm Ø s= 150
N = 4.7310737848 bars say s = 150
say N = 5 bars = 6

Check for Development Length :

Required Ld : 𝑨𝒃 𝒇𝒚)/√(𝒇𝒄^′
𝑳𝒅=(𝟎.𝟎𝟐 𝑨𝒃=𝑨𝒃𝒂𝒓) ; Required Ld (min)
𝑳𝒅 : =𝟎.𝟎𝟔𝒅𝒃𝒂𝒓 𝒇𝒚
𝒎𝒊𝒏

Ab = 314.159 m2 Required Ld (min) = 496.80 mm


Required Ld = 500.61 mm

A= 0.850 m
850 mm

Required Ld (furnished) = 780 mm

∴ safe!
γconcrete : 24 kN/m3

γsoil : 17 kN/m3

1.00
try 1 to 2 times width of column:
Column Dimension : 0.5 m
H: 0.3 mm
H

fc' = 27 Mpa
fy = 414 Mpa

Check for Footing Bearin

1.010725 Mpa 𝐹𝑏=∅ 0.85 𝑓𝑐^′ 𝐴1 √(𝐴2/𝐴1

∅=0.70 (𝑓𝑜𝑟 𝐵𝑒𝑎𝑟𝑖𝑛𝑔)

1.732051 Mpa
c=
safe! d=
A1 =
A2 =

√(𝐴2/
𝐴1)=
0.30553 Mpa
∴ use
√(𝐴2/
𝐴1)=

√(𝐴2/
𝐴1)=
0.866025 Mpa

safe!

1−(2
; 𝑅𝑢)/(0.85𝑓𝑐^′ 0.8953748152631
)=
3689447522

0.003381642512077

ρactual = 0.0110879740715 ωactual= 0.1700156024


mm Mu = 126.37677 kN.m
mm ∴ safe!

1−(2
; 𝑅𝑢)/(0.85𝑓𝑐^′ 0.8953748152631
)=
3689447522

0.003381642512077

ρactual = 0.0110879740715 ωactual= 0.1700156024


mm Mu = 126.37677 kN.m
mm ∴ safe!

gth :

𝒇𝒚
safe!
unsafe!

Check for Footing Bearing Strength :

Fbactual = 535.2988 kN
=∅ 0.85 𝑓𝑐^′ 𝐴1 √(𝐴2/𝐴1)
𝑏

Fb = 8032.5 kN
=0.70 (𝑓𝑜𝑟 𝐵𝑒𝑎𝑟𝑖𝑛𝑔)

∴ safe!

0.500 m
0.2 m
0.25 m2
1.69 m2

√(𝐴2/
𝐴1)= 2.60 > 2.00

√(𝐴2/
𝐴1)=
√(𝐴2/
𝐴1)= 2.00
DESIGN OF FOOTING 1 (GL-A) OPENING:

Max. DL = 49.291 KN MDL = 5.951 KN-m


Max. LL = 40.417 KN MLL = 6.671 KN-m
qa = 199.5 kPa qe = 182.1 kPa

Assumed Dimension of Footing


L /W 0.702 m
Area of Footing : 0.4926304 m2
say 1.500 m

FOR d TRY: 20 mm Ø Eccentricity of Loadings :


d: 0.2 m e= 0.141 m
200 mm 140.70 mm

Max. P
(AXIAL LOAD) = 123.8164 qa(ACTUAL) = 147.840556 KPA

Max. M 17.8148
(MOMENT) =
B= 1.20
H= 1.20
AREA = 1.44
I= 0.1728

Check for Punching Shear :

L= 1.200 m 𝑽𝒑= 𝑽𝒖/(∅𝒃𝒐𝒅)


W= 1.200 m Vp =
c= 0.500 m
d/2 = 0.1 m Allowable Punching Stress :
bo= 0.700 m 𝑽𝒂= √(𝒇𝒄^′ )/𝟑
Va =
Pu = 123.8164 kN
qu = 85.984 kPa ∴
Vu = 81.684 kN

Check for One Way Shear :

L= 1.200 m 𝑽𝒑= 𝑽𝒖/(∅𝒃𝒅)


W= 1.200 m Vp =
c= 0.500 m
A= 0.350 m Allowable Punching Stress :
B= 0.150 m 𝑽𝒂= √(𝒇𝒄^′ )/𝟔
Va =
Vu = 15.477 kN

Design Bending :

L= 1.200 m 𝑴𝒖= ∅ 𝑹𝒖 𝒃 𝒅𝟐
W= 1.200 m
A= 0.350 m Ru = 0.251534279
qu = 147.841 kPa
Mu = 10.866 kN.m ρ = 0.000610937238433385
10866280.833 N.mm
ρmin = 0.0033816425120773

∴ use : ρ = 0.003381642512077

for Reinforcement :
As = 811.5942029 m2
try 20mm Ø Spacing of Rebars:
N = 2.5805857008 bars s= 330
say N = 3 bars = 4 say s = 330

Design Bending :

L= 1.200 m 𝑴𝒖= ∅ 𝑹𝒖 𝒃 𝒅𝟐
W= 1.200 m
A= 0.350 m Ru = 0.251534279
qu = 147.841 kPa
Mu = 10.866 kN.m ρ = 0.000610937238433385
10866281 N.mm
ρmin = 0.0033816425120773

∴ use : ρ = 0.003381642512077

for Reinforcement :
As = 811.5942029 m2 Spacing of Rebars:
try 20mm Ø s= 150
N = 2.5805857008 bars say s = 150
say N = 3 bars = 4

Check for Development Length :

Required Ld : 𝑨𝒃 𝒇𝒚)/√(𝒇𝒄^′
𝑳𝒅=(𝟎.𝟎𝟐 𝑨𝒃=𝑨𝒃𝒂𝒓) ; Required Ld (min)
𝑳𝒅 : =𝟎.𝟎𝟔𝒅𝒃𝒂𝒓 𝒇𝒚
𝒎𝒊𝒏

Ab = 314.159 m2 Required Ld (min) = 496.80 mm


Required Ld = 500.61 mm

A= 0.350 m
350 mm

Required Ld (furnished) = 280 mm

∴ safe!
γconcrete : 24 kN/m3

γsoil : 17 kN/m3

0.60
try 1 to 2 times width of column:
Column Dimension : 0.5 m
H: 0.3 mm
H

fc' = 27 Mpa
fy = 414 Mpa

Check for Footing Bearin

0.171606 Mpa 𝐹𝑏=∅ 0.85 𝑓𝑐^′ 𝐴1 √(𝐴2/𝐴1

∅=0.70 (𝑓𝑜𝑟 𝐵𝑒𝑎𝑟𝑖𝑛𝑔)

1.732051 Mpa
c=
safe! d=
A1 =
A2 =

√(𝐴2/
𝐴1)=
0.054815 Mpa
∴ use
√(𝐴2/
𝐴1)=

√(𝐴2/
𝐴1)=
0.866025 Mpa

safe!

1−(2
; 𝑅𝑢)/(0.85𝑓𝑐^′ 0.9780798014336
)=
37238433385

0.003381642512077

ρactual = 0.0179519580205 ωactual= 0.2752633563


mm Mu = 78.43621 kN.m
mm ∴ safe!

1−(2
; 𝑅𝑢)/(0.85𝑓𝑐^′ 0.9780798014336
)=
37238433385

0.003381642512077

ρactual = 0.0179519580205 ωactual= 0.2752633563


mm Mu = 78.43621 kN.m
mm ∴ safe!

gth :

𝒇𝒚
safe!
unsafe!

Check for Footing Bearing Strength :

Fbactual = 123.8164 kN
=∅ 0.85 𝑓𝑐^′ 𝐴1 √(𝐴2/𝐴1)
𝑏

Fb = 8032.5 kN
=0.70 (𝑓𝑜𝑟 𝐵𝑒𝑎𝑟𝑖𝑛𝑔)

∴ safe!

0.500 m
0.2 m
0.25 m2
1.69 m2

√(𝐴2/
𝐴1)= 2.60 > 2.00

√(𝐴2/
𝐴1)=
√(𝐴2/
𝐴1)= 2.00
STRUCTURAL CALCULATIONS AND ANALYSIS

Project Name: PROPOSED 2-STOREY RESIDENTIAL HOUSE


Location: 1 San Gabriel St. Brgy. Bagumbayan, Quezon City

DESIGN OF COMBINED FOOTING (CF-1) :


DL = 60.058 MDL= 3.733 DL = 40.957 MDL= 0.639 γconcrete : 24 kN/m
3
fc' = 27
LL = 9.722 MLL= 0.816 LL = 2.412 MLL= 0.061 fy = 414
FL = 87.6248 FM = 5.7852 FL = 53.008 FM = 0.8644 γsoil : 18 kN/m
3

R= 140.632 qa = 252.7 Kpa

2.34 m
2
H = 1.2 m I = 0.632 AFOOTING =

qa(ACTUAL) = 69.57 Kpa ∴ safe! 223.9

h = 0.3 m for d:
300 mm try = 20 Ø

X= 0.91462 0.88538 d= 0.2 m


200 mm
Allowable Shear: Allowable Stress:
𝑽𝒂= √(𝒇𝒄^′ )/𝟔 𝑽𝒖= √(𝒇𝒄^′ )/𝟑
W= 1.3

0.2

0.2
Va = 0.866025 Mpa Vu = 1.7320508 Mpa
866.0254 Gpa

0.3 0.4 0.7 0.4 0


1.80 Check for Punching Shear :
PU1= 87.6248 PU2= 53.008
L= 1.80 m
W= 1.30 m
c1 = 0.40 mm c2 = 0.40 mm
qu = 78.12911 kn/m d/2 = 0.10 mm d/2 = 0.10 mm
60.09932 kpa bo1= 0.60 mm bo2= 0.60 mm
39.0646 37.38
for req'd d : (base on loading) Pu1= 87.6248 kn Pu1= 53.0076 kn
X= 0.622 Ps1= 21.64 kn Ps1= 21.6358 kn
0 d= 46.914 V1= 65.989 kn V1= 31.3718 kn
0 h= 146.9141588024
∴ safe! 𝑽𝒑= 𝑽𝒖/(∅𝒃𝒐𝒅) Vp1= 0.16174 Mpa Vp1= 0.07689 Mpa
∴ safe! ∴ safe!
-48.56 -15.63
Check for One Way Shear :
9.766139
L= 1.80 m
0 W= 1.30 m
c= 0.40 mm
A= 0.45 mm
3.61798 B= 0.25 mm

V = 27.0447 kn
Design Bending : 𝑽𝒑= 𝑽𝒖/(∅𝒃𝒅)
at LONG DIRECTION:
Mu= 3.617982222 Kn.m L= 1.80 m Vp= 8.84E-05 Mpa
3617982.222 N.mm W= 1.30 m ∴ safe!

𝑴𝒖= ∅ 𝑹𝒖 𝒃 𝒅𝟐
; 1−(2 𝑅𝑢)/(0.85𝑓𝑐^
Ru = 0.0773073124406455
′ )= 0.993262979 Check for Development Length :

ρ = 0.000187048 Required Ld𝑳𝒅:=(𝟎.𝟎𝟐 𝑨𝒃𝑨 𝒃=𝑨𝒃𝒂𝒓


𝒇𝒚)/√(𝒇𝒄^
′)
ρmin = 0.003381643 Ab = 314.159 mm2
∴ use : Ld = 500.609 mm
ρ = 0.003381643
for Reinforcement : Required Ld 𝑳
(min)
𝒅
: =𝟎.𝟎𝟔𝒅𝒃𝒂𝒓 𝒇𝒚
𝒎𝒊𝒏
As = 879.2270531 ρactual = 0.004833219
ωactual= 0.074109365 Ld(min)
try 20 Ø = 496.80 mm
N = 2.79563 bars Mu = 89.55002839
say N = 4 bars ∴ safe! Required Ld (furnished) : A= 550 mm

at SHORT DIRECTION: Ld (furnished) = 480 mm


L = 1.80 m ∴ safe!
W = 1.30 m
L1 = 0.80 m B1 = 0.55 m
L2 = 0.80 m B2 = 0.55 m
L'= 0.20 m

qe1 = 67.096 KPA


qe2 = 41.701 KPA

M1 = 10.148293269231 Kn.m M2 = 6.3072704 Kn.m


10148293.269231 N.mm 6307270.43269 N.mm
𝑴𝒖= ∅ 𝑹𝒖 𝒃 𝒅𝟐 𝑴𝒖= ∅ 𝑹𝒖 𝒃 𝒅𝟐
Ru = 0.3523712940705 Ru = 0.21900244558
; 1−(2 𝑅𝑢)/(0.85𝑓𝑐^ ; 1−(2 𝑅𝑢)/(0.85𝑓𝑐^
′ )= 0.969292 ′ )= = 0.980914819557

ρ = 0.000857774817220682 ρ = 0.00053153977
use : use :
using ρmin = 0.00338164251207729 ρ = 0.0033816425121 ρ = 0.00338164251
for Shrinkage Reinforcement : for Reinforcement : for Reinforcement :
As = 135.265700 As = 541.06280193237 As = 541.062801932
try 20 Ø try 20 Ø try 20 Ø
N = 0.4301 bars N = 1.7203905 bars N = 1.72039 bars
say N = 2 bars say N = 3 bars say N = 3 bars

ρactual = 0.0058904862255 ρactual = 0.00589048623


ωactual= 0.0903207887907 ωactual= 0.09032078879
Mu = 66.49075665466 Mu = 66.4907566547
∴ safe! ∴ safe!
DESIGN OF COLUMN

DIMENSIONS (C1) Fc' 28 PDL : 10.541 KN


LENGTH : 0.500 m Fy 414 PLL : 3.86 KN
WIDTH : 0.500 m M1 : 63.760 KN-m
AREA : 0.250 sq.m M2 : 30.430 KN-m
HEIGHT : 4m Pu : 18.83 KN
M1/M2 : 2.0953007

Ag = Pu/(0.7(0.8)(0.85Fc'(1-ρg)+Fy(ρg)) USE!
T^2 = Ag ρg :
FORMULA :
ρ = As / Ag Bar Dia.
N = As(4)/PI()(Dia.Bar)^2
Ag : 1213.50
T: 34.835354 say 500 mm
As : 2500 sq.mm
N: 5.0929582 say 8 pcs

SPACING OF DIAMETER TIES 10 mm


a.) S: 480 mm o.c.
SPACING OF BAR DIAMETER 16 mm
b.) S: 400 mm o.c.
LEAST DIMENSION
c.) S: 500 mm

USE!!! 400 mm
RADIUS OF GYRATION
R: 150 mm
Lu : 4000 mm
k: 0.7 2133.333 200000000426666600000
EI: 34.00 MN-m^2 426666.6

USE!
0.01
25
Design Data:

B1 at Discontinuous Support

Length of Beam : 2.00 m ASSUME


fc' : 27.00 MPa ρ: 0.0104555
fy : 414.00 MPa Design Moment
ρb : 0.02788140 M: 231,750,000.00
ρmax : 0.02091105 Beam width : 300.00
ρmin : 0.00338164 Req'd Depth : 467.98
ω: 0.16031805 Assume Rebar size : 20.00
B (ASSUME) : 300.00000000 Effective depth : 440.00
Required Steel Area : 1,380.13
dia. Bar 20.00 mm Qty of rebars : 4.39
Actual As : 1,570.80
ACTUAL
ρ: 0.01189997 Moment Capacity
ρmin : 0.00338164 M: 296,744,593.15
ρmax : 0.02091105 Moment Capacity > Design Moment
ω: 0.18246624
CHECK SHEAR @ DISTANCE "d"
bw : 210.00 mm Vu : 123,511.00
12 mm Vc : 80,020.747
NOTE : Vu > ØVc STIRRUPS IS NECESSARY!
Vs : 57,213.697
FORMULA : Vs = (2/3)SQRT(Fc')(bwd) = 320,082.99
NOTE : Vs > (2/3)SQRT(Fc')(bwd) GET THE SPACING!
FORMULA : Vs = (1/3)SQRT(Fc')(bwd) = 160,041.49
Av : 226.19
s: 720.17
MAXIMUM SPACING,"s"
NOTE : Vs > (1/3)SQRT(Fc')(bwd) D/2 OR 600 WILL USE!
D/2 OR 600
D/2 : 220.00
say 200.00

USE!!! 200

WILL GOVERN!
ACTUAL DEFLECTION < ALLOWABLE DEFLECTION
CHECK DEFLECTION @ +Mmax (see STAAD) 13.7 L/360 :
DESIGN OF BEAM
ACI-318

SUME Length of Beam :


fc' :
n Moment fy :
N-mm ρb :
300 300 mm ρmax :
500 500 mm ρmin :
mm ω:
440.00 B (ASSUME) :
mm 2

5 pcs. dia. Bar


mm 2

nt Capacity ρ:
N-mm ρmin :
SINGLY! ρmax :
esign Moment SINGLY!
DOUBLY! ω:

N bw :
N
STIRRUPS
S NECESSARY! IS NO NOTE : Vu > ØVc
N NECESSA STIRRUPS
RY!
N FORMULA :
E SPACING! ADJUST NOTE : Vs > (2/3)SQRT(Fc')(bwd)
GET THE
SIZE OF SPACING!
N BEAM FORMULA :
mm2
mm
M SPACING,"s"
00 WILL USE! D/4 OR D/2 OR NOTE : Vs > (1/3)SQRT(Fc')(bwd)
300 WILL 600 WILL
D/4 OR 300 USE! USE!
D/4 : 110.00
say 100.00

USE!!! 100

200.00 WILL GOVERN


N ACTU
L/360 : 5.556 mm CHECK DEFLECTION @ +Mmax (see STA
B1 at MIDSPAN

3.00 m ASSUME
27.00 MPa ρ: 0.0069634
414.00 MPa Design Moment
0.02788140 M: 11,875,000.00 N-mm
0.02091105 Beam width : 200.00 200 300 mm
0.00338164 Req'd Depth : 156.28 350 500 mm
0.10677182 Assume Rebar size : 20.00 mm
200.00000000 Effective depth : 440.00 290.00
Required Steel Area : 403.88 mm
2

16.00 mm Qty of rebars : 2.01 3 pcs.


Actual As : 603.19 mm
2

ACTUAL
0.00456959 Moment Capacity
0.00338164 M: 122,418,229.53 N-mm
0.02091105 Moment Capacity > Design Moment SINGLY!
0.07006704
CHECK SHEAR @ DISTANCE "d"
210.00 mm Vu : 60,805.00 N
Vc : 80,020.747 N
NOTE : Vu > ØVc NO STIRRUPS
Vs : (12,459.636) N
Vs = (2/3)SQRT(Fc')(bwd) = 320,082.99 N
: Vs > (2/3)SQRT(Fc')(bwd) GET THE SPACING!
Vs = (1/3)SQRT(Fc')(bwd) = 160,041.49 N

MAXIMUM SPACING,"s"
: Vs > (1/3)SQRT(Fc')(bwd) D/2 OR 600 WILL USE!
D/2 OR 600 D/4 OR 300
D/2 : 220.00 D/4 : 110.00
say 200.00 say 100.00

USE!!! 200 USE!!! 100

WILL GOVERN! 200.00


ACTUAL DEFLECTION < ALLOWABLE DEFLECTION
ECTION @ +Mmax (see STAAD) 13.7 L/360 : 8.333 mm
SINGLY!
DOUBLY!

STIRRUPS
IS NO
NECESSA STIRRUPS
RY!
ADJUST
GET THE
SIZE OF SPACING!
BEAM

D/4 OR D/2 OR
300 WILL 600 WILL
USE! USE!
Design Data:

B1 at Discontinuous Support

Length of Beam : 2.00 m ASSUME


fc' : 27.00 MPa ρ: 0.0146377
fy : 414.00 MPa Design Moment
ρb : 0.02788140 M: 178,510,000.00
ρmax : 0.02091105 Beam width : 300.00
ρmin : 0.00338164 Req'd Depth : 354.62
ω: 0.22444527 Assume Rebar size : 20.00
B (ASSUME) : 300.00000000 Effective depth : 340.00
Required Steel Area : 1,493.05
dia. Bar 20.00 mm Qty of rebars : 4.75
Actual As : 1,570.80
ACTUAL
ρ: 0.01539996 Moment Capacity
ρmin : 0.00338164 M: 237,053,483.46
ρmax : 0.02091105 Moment Capacity > Design Moment
ω: 0.23613278
CHECK SHEAR @ DISTANCE "d"
bw : 210.00 mm Vu : 123,511.00
12 mm Vc : 61,834.214
NOTE : Vu > ØVc STIRRUPS IS NECESSARY!
Vs : 75,400.231
FORMULA : Vs = (2/3)SQRT(Fc')(bwd) = 247,336.86
NOTE : Vs > (2/3)SQRT(Fc')(bwd) GET THE SPACING!
FORMULA : Vs = (1/3)SQRT(Fc')(bwd) = 123,668.43
Av : 226.19
s: 422.27
MAXIMUM SPACING,"s"
NOTE : Vs > (1/3)SQRT(Fc')(bwd) D/2 OR 600 WILL USE!
D/2 OR 600
D/2 : 170.00
say 200.00

USE!!! 200

WILL GOVERN!
ACTUAL DEFLECTION < ALLOWABLE DEFLECTION
CHECK DEFLECTION @ +Mmax (see STAAD) 13.7 L/360 :
DESIGN OF BEAM
ACI-318

SUME Length of Beam :


fc' :
n Moment fy :
N-mm ρb :
300 300 mm ρmax :
400 400 mm ρmin :
mm ω:
340.00 B (ASSUME) :
mm 2

5 pcs. dia. Bar


mm 2

nt Capacity ρ:
N-mm ρmin :
SINGLY! ρmax :
esign Moment SINGLY!
DOUBLY! ω:

N bw :
N
STIRRUPS
S NECESSARY! IS NO NOTE : Vu > ØVc
N NECESSA STIRRUPS
RY!
N FORMULA :
E SPACING! ADJUST NOTE : Vs > (2/3)SQRT(Fc')(bwd)
GET THE
SIZE OF SPACING!
N BEAM FORMULA :
mm2
mm
M SPACING,"s"
00 WILL USE! D/4 OR D/2 OR NOTE : Vs > (1/3)SQRT(Fc')(bwd)
300 WILL 600 WILL
D/4 OR 300 USE! USE!
D/4 : 85.00
say 100.00

USE!!! 100

200.00 WILL GOVERN


N ACTU
L/360 : 5.556 mm CHECK DEFLECTION @ +Mmax (see STA
B1 at MIDSPAN

3.00 m ASSUME
27.00 MPa ρ: 0.0069634
414.00 MPa Design Moment
0.02788140 M: 24,300,000.00 N-mm
0.02091105 Beam width : 200.00 200 300 mm
0.00338164 Req'd Depth : 223.56 350 400 mm
0.10677182 Assume Rebar size : 20.00 mm
200.00000000 Effective depth : 340.00 290.00
Required Steel Area : 403.88 mm
2

16.00 mm Qty of rebars : 2.01 3 pcs.


Actual As : 603.19 mm
2

ACTUAL
0.00591359 Moment Capacity
0.00338164 M: 100,105,154.93 N-mm
0.02091105 Moment Capacity > Design Moment SINGLY!
0.09067499
CHECK SHEAR @ DISTANCE "d"
210.00 mm Vu : 60,805.00 N
Vc : 61,834.214 N
NOTE : Vu > ØVc STIRRUPS IS NECESSARY!
Vs : 5,726.897 N
Vs = (2/3)SQRT(Fc')(bwd) = 247,336.86 N
: Vs > (2/3)SQRT(Fc')(bwd) GET THE SPACING!
Vs = (1/3)SQRT(Fc')(bwd) = 123,668.43 N

MAXIMUM SPACING,"s"
: Vs > (1/3)SQRT(Fc')(bwd) D/2 OR 600 WILL USE!
D/2 OR 600 D/4 OR 300
D/2 : 170.00 D/4 : 85.00
say 200.00 say 100.00

USE!!! 200 USE!!! 100

WILL GOVERN! 200.00


ACTUAL DEFLECTION < ALLOWABLE DEFLECTION
ECTION @ +Mmax (see STAAD) 13.7 L/360 : 8.333 mm
SINGLY!
DOUBLY!

STIRRUPS
IS NO
NECESSA STIRRUPS
RY!
ADJUST
GET THE
SIZE OF SPACING!
BEAM

D/4 OR D/2 OR
300 WILL 600 WILL
USE! USE!
Design Data:

B1 at Discontinuous Support

Length of Beam : 4.60 m ASSUME


fc' : 27.00 MPa ρ: 0.0069634
fy : 414.00 MPa Design Moment
ρb : 0.02788140 M: 46,550,000.00
ρmax : 0.02091105 Beam width : 300.00
ρmin : 0.00338164 Req'd Depth : 252.64
ω: 0.10677182 Assume Rebar size : 20.00
B (ASSUME) : 300.00000000 Effective depth : 340.00
Required Steel Area : 710.26
dia. Bar 20.00 mm Qty of rebars : 2.26
Actual As : 942.48
ACTUAL
ρ: 0.01385997 Moment Capacity
ρmin : 0.00338164 M: 144,534,397.62
ρmax : 0.02091105 Moment Capacity > Design Moment
ω: 0.21251950
CHECK SHEAR @ DISTANCE "d"
bw : 110.00 mm Vu : 123,511.00
12 mm Vc : 32,389.350
NOTE : Vu > ØVc STIRRUPS IS NECESSARY!
Vs : 104,845.094
FORMULA : Vs = (2/3)SQRT(Fc')(bwd) = 129,557.40
NOTE : Vs > (2/3)SQRT(Fc')(bwd) GET THE SPACING!
FORMULA : Vs = (1/3)SQRT(Fc')(bwd) = 64,778.70
Av : 226.19
s: 303.68
MAXIMUM SPACING,"s"
NOTE : Vs > (1/3)SQRT(Fc')(bwd) D/4 OR 300 WILL USE!
D/2 OR 600
D/2 : 170.00
say 200.00

USE!!! 200

WILL GOVERN!
ACTUAL DEFLECTION < ALLOWABLE DEFLECTION
CHECK DEFLECTION @ +Mmax (see STAAD) 13.7 L/360 :
DESIGN OF BEAM
ACI-318

SUME Length of Beam :


fc' :
n Moment fy :
N-mm ρb :
300 200 mm ρmax :
400 400 mm ρmin :
mm ω:
340.00 B (ASSUME) :
mm 2

3 pcs. dia. Bar


mm 2

nt Capacity ρ:
N-mm ρmin :
SINGLY! ρmax :
esign Moment SINGLY!
DOUBLY! ω:

N bw :
N
STIRRUPS
S NECESSARY! IS NO NOTE : Vu > ØVc
N NECESSA STIRRUPS
RY!
N FORMULA :
E SPACING! ADJUST NOTE : Vs > (2/3)SQRT(Fc')(bwd)
GET THE
SIZE OF SPACING!
N BEAM FORMULA :
mm2
mm
M SPACING,"s"
00 WILL USE! D/4 OR D/2 OR NOTE : Vs > (1/3)SQRT(Fc')(bwd)
300 WILL 600 WILL
D/4 OR 300 USE! USE!
D/4 : 85.00
say 100.00

USE!!! 100

100.00 WILL GOVERN


N ACTU
L/360 : 12.778 mm CHECK DEFLECTION @ +Mmax (see STA
B1 at MIDSPAN

3.00 m ASSUME
27.00 MPa ρ: 0.0069634
414.00 MPa Design Moment
0.02788140 M: 3,973,000.00 N-mm
0.02091105 Beam width : 200.00 200 200 mm
0.00338164 Req'd Depth : 90.39 400 400 mm
0.10677182 Assume Rebar size : 20.00 mm
200.00000000 Effective depth : 340.00 340.00
Required Steel Area : 473.51 mm
2

20.00 mm Qty of rebars : 1.51 2 pcs.


Actual As : 628.32 mm
2

ACTUAL
0.00923998 Moment Capacity
0.00338164 M: 100,960,880.18 N-mm
0.02091105 Moment Capacity > Design Moment SINGLY!
0.14167967
CHECK SHEAR @ DISTANCE "d"
110.00 mm Vu : 60,805.00 N
Vc : 32,389.350 N
NOTE : Vu > ØVc STIRRUPS IS NECESSARY!
Vs : 35,171.761 N
Vs = (2/3)SQRT(Fc')(bwd) = 129,557.40 N
: Vs > (2/3)SQRT(Fc')(bwd) GET THE SPACING!
Vs = (1/3)SQRT(Fc')(bwd) = 64,778.70 N

MAXIMUM SPACING,"s"
: Vs > (1/3)SQRT(Fc')(bwd) D/2 OR 600 WILL USE!
D/2 OR 600 D/4 OR 300
D/2 : 170.00 D/4 : 85.00
say 200.00 say 100.00

USE!!! 200 USE!!! 100

WILL GOVERN! 200.00


ACTUAL DEFLECTION < ALLOWABLE DEFLECTION
ECTION @ +Mmax (see STAAD) 13.7 L/360 : 8.333 mm
SINGLY!
DOUBLY!

STIRRUPS
IS NO
NECESSA STIRRUPS
RY!
ADJUST
GET THE
SIZE OF SPACING!
BEAM

D/4 OR D/2 OR
300 WILL 600 WILL
USE! USE!
Design Data:

B1 at Discontinuous Support

Length of Beam : 4.00 m ASSUME


fc' : 27.00 MPa ρ: 0.0069634
fy : 414.00 MPa Design Moment
ρb : 0.02788140 M: 58,570,000.00
ρmax : 0.02091105 Beam width : 300.00
ρmin : 0.00338164 Req'd Depth : 283.38
ω: 0.10677182 Assume Rebar size : 20.00
B (ASSUME) : 300.00000000 Effective depth : 440.00
Required Steel Area : 919.17
dia. Bar 20.00 mm Qty of rebars : 2.93
Actual As : 942.48
ACTUAL
ρ: 0.00713998 Moment Capacity
ρmin : 0.00338164 M: 186,638,786.90
ρmax : 0.02091105 Moment Capacity > Design Moment
ω: 0.10947974
CHECK SHEAR @ DISTANCE "d"
bw : 210.00 mm Vu : 123,511.00
12 mm Vc : 80,020.747
NOTE : Vu > ØVc STIRRUPS IS NECESSARY!
Vs : 57,213.697
FORMULA : Vs = (2/3)SQRT(Fc')(bwd) = 320,082.99
NOTE : Vs > (2/3)SQRT(Fc')(bwd) GET THE SPACING!
FORMULA : Vs = (1/3)SQRT(Fc')(bwd) = 160,041.49
Av : 226.19
s: 720.17
MAXIMUM SPACING,"s"
NOTE : Vs > (1/3)SQRT(Fc')(bwd) D/2 OR 600 WILL USE!
D/2 OR 600
D/2 : 220.00
say 200.00

USE!!! 200

WILL GOVERN!
ACTUAL DEFLECTION < ALLOWABLE DEFLECTION
CHECK DEFLECTION @ +Mmax (see STAAD) 13.7 L/360 :
DESIGN OF BEAM
ACI-318

SUME Length of Beam :


fc' :
n Moment fy :
N-mm ρb :
300 300 mm ρmax :
500 500 mm ρmin :
mm ω:
440.00 B (ASSUME) :
mm 2

3 pcs. dia. Bar


mm 2

nt Capacity ρ:
N-mm ρmin :
SINGLY! ρmax :
esign Moment SINGLY!
DOUBLY! ω:

N bw :
N
STIRRUPS
S NECESSARY! IS NO NOTE : Vu > ØVc
N NECESSA STIRRUPS
RY!
N FORMULA :
E SPACING! ADJUST NOTE : Vs > (2/3)SQRT(Fc')(bwd)
GET THE
SIZE OF SPACING!
N BEAM FORMULA :
mm2
mm
M SPACING,"s"
00 WILL USE! D/4 OR D/2 OR NOTE : Vs > (1/3)SQRT(Fc')(bwd)
300 WILL 600 WILL
D/4 OR 300 USE! USE!
D/4 : 110.00
say 100.00

USE!!! 100

200.00 WILL GOVERN


N ACTU
L/360 : 11.111 mm CHECK DEFLECTION @ +Mmax (see STA
B1 at MIDSPAN

4.00 m ASSUME
27.00 MPa ρ: 0.0069634
414.00 MPa Design Moment
0.02788140 M: 93,960,000.00 N-mm
0.02091105 Beam width : 300.00 400 400 mm
0.00338164 Req'd Depth : 358.93 500 500 mm
0.10677182 Assume Rebar size : 20.00 mm
300.00000000 Effective depth : 440.00 440.00
Required Steel Area : 1,225.55 mm
2

20.00 mm Qty of rebars : 3.90 4 pcs.


Actual As : 1,256.64 mm
2

ACTUAL
0.00713998 Moment Capacity
0.00338164 M: 248,851,715.87 N-mm
0.02091105 Moment Capacity > Design Moment SINGLY!
0.10947974
CHECK SHEAR @ DISTANCE "d"
310.00 mm Vu : 60,805.00 N
Vc : 118,125.865 N
NOTE : Vu > ØVc NO STIRRUPS
Vs : (50,564.754) N
Vs = (2/3)SQRT(Fc')(bwd) = 472,503.46 N
: Vs > (2/3)SQRT(Fc')(bwd) GET THE SPACING!
Vs = (1/3)SQRT(Fc')(bwd) = 236,251.73 N

MAXIMUM SPACING,"s"
: Vs > (1/3)SQRT(Fc')(bwd) D/2 OR 600 WILL USE!
D/2 OR 600 D/4 OR 300
D/2 : 220.00 D/4 : 110.00
say 200.00 say 100.00

USE!!! 200 USE!!! 100

WILL GOVERN! 200.00


ACTUAL DEFLECTION < ALLOWABLE DEFLECTION
ECTION @ +Mmax (see STAAD) 13.7 L/360 : 11.111 mm
SINGLY!
DOUBLY!

STIRRUPS
IS NO
NECESSA STIRRUPS
RY!
ADJUST
GET THE
SIZE OF SPACING!
BEAM

D/4 OR D/2 OR
300 WILL 600 WILL
USE! USE!
Design Data:

B1 at Discontinuous Support

Length of Beam : 6.00 m ASSUME


fc' : 27.00 MPa ρ: 0.0069634
fy : 414.00 MPa Design Moment
ρb : 0.02788140 M: 150,820,000.00
ρmax : 0.02091105 Beam width : 300.00
ρmin : 0.00338164 Req'd Depth : 454.74
ω: 0.10677182 Assume Rebar size : 20.00
B (ASSUME) : 300.00000000 Effective depth : 440.00
Required Steel Area : 919.17
dia. Bar 20.00 mm Qty of rebars : 2.93
Actual As : 1,256.64
ACTUAL
ρ: 0.00713998 Moment Capacity
ρmin : 0.00338164 M: 248,851,715.87
ρmax : 0.02091105 Moment Capacity > Design Moment
ω: 0.10947974
CHECK SHEAR @ DISTANCE "d"
bw : 310.00 mm Vu : 123,511.00
12 mm Vc : 118,125.865
NOTE : Vu > ØVc STIRRUPS IS NECESSARY!
Vs : 19,108.579
FORMULA : Vs = (2/3)SQRT(Fc')(bwd) = 472,503.46
NOTE : Vs > (2/3)SQRT(Fc')(bwd) GET THE SPACING!
FORMULA : Vs = (1/3)SQRT(Fc')(bwd) = 236,251.73
Av : 226.19
s: 2,156.29
MAXIMUM SPACING,"s"
NOTE : Vs > (1/3)SQRT(Fc')(bwd) D/2 OR 600 WILL USE!
D/2 OR 600
D/2 : 220.00
say 200.00

USE!!! 200

WILL GOVERN!
ACTUAL DEFLECTION < ALLOWABLE DEFLECTION
CHECK DEFLECTION @ +Mmax (see STAAD) 13.7 L/360 :
DESIGN OF BEAM
ACI-318

SUME Length of Beam :


fc' :
n Moment fy :
N-mm ρb :
300 400 mm ρmax :
500 500 mm ρmin :
mm ω:
440.00 B (ASSUME) :
mm 2

4 pcs. dia. Bar


mm 2

nt Capacity ρ:
N-mm ρmin :
SINGLY! ρmax :
esign Moment SINGLY!
DOUBLY! ω:

N bw :
N
STIRRUPS
S NECESSARY! IS NO NOTE : Vu > ØVc
N NECESSA STIRRUPS
RY!
N FORMULA :
E SPACING! ADJUST NOTE : Vs > (2/3)SQRT(Fc')(bwd)
GET THE
SIZE OF SPACING!
N BEAM FORMULA :
mm2
mm
M SPACING,"s"
00 WILL USE! D/4 OR D/2 OR NOTE : Vs > (1/3)SQRT(Fc')(bwd)
300 WILL 600 WILL
D/4 OR 300 USE! USE!
D/4 : 110.00
say 100.00

USE!!! 100

200.00 WILL GOVERN


N ACTU
L/360 : 16.667 mm CHECK DEFLECTION @ +Mmax (see STA
B1 at MIDSPAN

6.00 m ASSUME
27.00 MPa ρ: 0.0069634
414.00 MPa Design Moment
0.02788140 M: 124,240,000.00 N-mm
0.02091105 Beam width : 300.00 300 300 mm
0.00338164 Req'd Depth : 412.73 500 500 mm
0.10677182 Assume Rebar size : 20.00 mm
300.00000000 Effective depth : 440.00 440.00
Required Steel Area : 919.17 mm
2

20.00 mm Qty of rebars : 2.93 4 pcs.


Actual As : 1,256.64 mm
2

ACTUAL
0.00951998 Moment Capacity
0.00338164 M: 243,123,695.19 N-mm
0.02091105 Moment Capacity > Design Moment SINGLY!
0.14597299
CHECK SHEAR @ DISTANCE "d"
210.00 mm Vu : 60,805.00 N
Vc : 80,020.747 N
NOTE : Vu > ØVc NO STIRRUPS
Vs : (12,459.636) N
Vs = (2/3)SQRT(Fc')(bwd) = 320,082.99 N
: Vs > (2/3)SQRT(Fc')(bwd) GET THE SPACING!
Vs = (1/3)SQRT(Fc')(bwd) = 160,041.49 N

MAXIMUM SPACING,"s"
: Vs > (1/3)SQRT(Fc')(bwd) D/2 OR 600 WILL USE!
D/2 OR 600 D/4 OR 300
D/2 : 220.00 D/4 : 110.00
say 200.00 say 100.00

USE!!! 200 USE!!! 100

WILL GOVERN! 200.00


ACTUAL DEFLECTION < ALLOWABLE DEFLECTION
ECTION @ +Mmax (see STAAD) 13.7 L/360 : 16.667 mm
SINGLY!
DOUBLY!

STIRRUPS
IS NO
NECESSA STIRRUPS
RY!
ADJUST
GET THE
SIZE OF SPACING!
BEAM

D/4 OR D/2 OR
300 WILL 600 WILL
USE! USE!
Design Data:

B1 at Discontinuous Support

Length of Beam : 3.00 m ASSUME


fc' : 27.00 MPa ρ: 0.0104555
fy : 414.00 MPa Design Moment
ρb : 0.02788140 M: 70,800,000.00
ρmax : 0.02091105 Beam width : 250.00
ρmin : 0.00338164 Req'd Depth : 283.35
ω: 0.16031805 Assume Rebar size : 16.00
B (ASSUME) : 250.00 Effective depth : 292.00
Required Steel Area : 763.25
dia. Bar 16.00 mm Qty of rebars : 3.80
Actual As : 603.19
ACTUAL
ρ: 0.00826282 Moment Capacity
ρmin : 0.00338164 M: 87,238,025.60
ρmax : 0.02091105 Moment Capacity > Design Moment
ω: 0.12669656
CHECK SHEAR @ DISTANCE "d"
bw : 160.00 mm Vu : 123,511.00
12 mm Vc : 40,460.707
NOTE : Vu > ØVc STIRRUPS IS NECESSARY!
Vs : 96,773.738
FORMULA : Vs = (2/3)SQRT(Fc')(bwd) = 161,842.83
NOTE : Vs > (2/3)SQRT(Fc')(bwd) GET THE SPACING!
FORMULA : Vs = (1/3)SQRT(Fc')(bwd) = 80,921.41
Av : 226.19
s: 282.56
MAXIMUM SPACING,"s"
NOTE : Vs > (1/3)SQRT(Fc')(bwd) D/4 OR 300 WILL USE!
D/2 OR 600
D/2 : 146.00
say 200.00

USE!!! 200

WILL GOVERN!
ACTUAL DEFLECTION < ALLOWABLE DEFLECTION
CHECK DEFLECTION @ +Mmax (see STAAD) 13.7 L/360 :
DESIGN OF BEAM
ACI-318

SUME Length of Beam :


fc' :
n Moment fy :
N-mm ρb :
250 250 mm ρmax :
350 350 mm ρmin :
mm ω:
292.00 B (ASSUME) :
mm 2

3 pcs. dia. Bar


mm 2

nt Capacity ρ:
N-mm ρmin :
SINGLY! ρmax :
esign Moment SINGLY!
DOUBLY! ω:

N bw :
N
STIRRUPS
S NECESSARY! IS NO NOTE : Vu > ØVc
N NECESSA STIRRUPS
RY!
N FORMULA :
E SPACING! ADJUST NOTE : Vs > (2/3)SQRT(Fc')(bwd)
GET THE
SIZE OF SPACING!
N BEAM FORMULA :
mm2
mm
M SPACING,"s"
00 WILL USE! D/4 OR D/2 OR NOTE : Vs > (1/3)SQRT(Fc')(bwd)
300 WILL 600 WILL
D/4 OR 300 USE! USE!
D/4 : 73.00
say 100.00

USE!!! 100

100.00 WILL GOVERN


N ACTU
L/360 : 8.333 mm CHECK DEFLECTION @ +Mmax (see STA
B1 at MIDSPAN

8.00 m ASSUME
27.00 MPa ρ: 0.0154742
414.00 MPa Design Moment
0.02788140 M: 55,170,000.00 N-mm
0.02091105 Beam width : 250.00 250 250 mm
0.00338164 Req'd Depth : 210.96 350 350 mm
0.23727071 Assume Rebar size : 16.00 mm
250.00 Effective depth : 292.00 292.00
Required Steel Area : 1,129.61 mm
2

16.00 mm Qty of rebars : 5.62 5 pcs.


Actual As : 1,005.31 mm
2

ACTUAL
0.01377137 Moment Capacity
0.00338164 M: 137,565,632.05 N-mm
0.02091105 Moment Capacity > Design Moment SINGLY!
0.21116093
CHECK SHEAR @ DISTANCE "d"
160.00 mm Vu : 60,805.00 N
Vc : 40,460.707 N
NOTE : Vu > ØVc STIRRUPS IS NECESSARY!
Vs : 27,100.404 N
Vs = (2/3)SQRT(Fc')(bwd) = 161,842.83 N
: Vs > (2/3)SQRT(Fc')(bwd) GET THE SPACING!
Vs = (1/3)SQRT(Fc')(bwd) = 80,921.41 N

MAXIMUM SPACING,"s"
: Vs > (1/3)SQRT(Fc')(bwd) D/2 OR 600 WILL USE!
D/2 OR 600 D/4 OR 300
D/2 : 146.00 D/4 : 73.00
say 200.00 say 100.00

USE!!! 200 USE!!! 100

WILL GOVERN! 200.00


ACTUAL DEFLECTION < ALLOWABLE DEFLECTION
ECTION @ +Mmax (see STAAD) 13.7 L/360 : 22.222 mm
SINGLY!
DOUBLY!

STIRRUPS
IS NO
NECESSA STIRRUPS
RY!
ADJUST
GET THE
SIZE OF SPACING!
BEAM

D/4 OR D/2 OR
300 WILL 600 WILL
USE! USE!
Design Data:

B1 at Discontinuous Support

Length of Beam : 6.00 m ASSUME


fc' : 27.00 MPa ρ: 0.0146377
fy : 414.00 MPa Design Moment
ρb : 0.02788140 M: 143,870,000.00
ρmax : 0.02091105 Beam width : 250.00
ρmin : 0.00338164 Req'd Depth : 348.74
ω: 0.22444527 Assume Rebar size : 20.00
B (ASSUME) : 250.00 Effective depth : 340.00
Required Steel Area : 1,244.21
dia. Bar 20.00 mm Qty of rebars : 3.96
Actual As : 1,570.80
ACTUAL
ρ: 0.01847996 Moment Capacity
ρmin : 0.00338164 M: 229,379,124.96
ρmax : 0.02091105 Moment Capacity > Design Moment
ω: 0.28335934
CHECK SHEAR @ DISTANCE "d"
bw : 160.00 mm Vu : 123,511.00
12 mm Vc : 47,111.782
NOTE : Vu > ØVc STIRRUPS IS NECESSARY!
Vs : 90,122.662
FORMULA : Vs = (2/3)SQRT(Fc')(bwd) = 188,447.13
NOTE : Vs > (2/3)SQRT(Fc')(bwd) GET THE SPACING!
FORMULA : Vs = (1/3)SQRT(Fc')(bwd) = 94,223.56
Av : 226.19
s: 353.29
MAXIMUM SPACING,"s"
NOTE : Vs > (1/3)SQRT(Fc')(bwd) D/2 OR 600 WILL USE!
D/2 OR 600
D/2 : 170.00
say 200.00

USE!!! 200

WILL GOVERN!
ACTUAL DEFLECTION < ALLOWABLE DEFLECTION
CHECK DEFLECTION @ +Mmax (see STAAD) 13.7 L/360 :
DESIGN OF BEAM
ACI-318

SUME Length of Beam :


fc' :
n Moment fy :
N-mm ρb :
250 250 mm ρmax :
400 400 mm ρmin :
mm ω:
340.00 B (ASSUME) :
mm 2

5 pcs. dia. Bar


mm 2

nt Capacity ρ:
N-mm ρmin :
SINGLY! ρmax :
esign Moment SINGLY!
DOUBLY! ω:

N bw :
N
STIRRUPS
S NECESSARY! IS NO NOTE : Vu > ØVc
N NECESSA STIRRUPS
RY!
N FORMULA :
E SPACING! ADJUST NOTE : Vs > (2/3)SQRT(Fc')(bwd)
GET THE
SIZE OF SPACING!
N BEAM FORMULA :
mm2
mm
M SPACING,"s"
00 WILL USE! D/4 OR D/2 OR NOTE : Vs > (1/3)SQRT(Fc')(bwd)
300 WILL 600 WILL
D/4 OR 300 USE! USE!
D/4 : 85.00
say 100.00

USE!!! 100

200.00 WILL GOVERN


N ACTU
L/360 : 16.667 mm CHECK DEFLECTION @ +Mmax (see STA
B1 at MIDSPAN

6.00 m ASSUME
27.00 MPa ρ: 0.0156833
414.00 MPa Design Moment
0.02788140 M: 153,970,000.00 N-mm
0.02091105 Beam width : 250.00 250 250 mm
0.00338164 Req'd Depth : 350.46 400 400 mm
0.24047707 Assume Rebar size : 20.00 mm
250.00 Effective depth : 340.00 340.00
Required Steel Area : 1,333.08 mm
2

20.00 mm Qty of rebars : 4.24 5 pcs.


Actual As : 1,570.80 mm
2

ACTUAL
0.01847996 Moment Capacity
0.00338164 M: 229,379,124.96 N-mm
0.02091105 Moment Capacity > Design Moment SINGLY!
0.28335934
CHECK SHEAR @ DISTANCE "d"
160.00 mm Vu : 60,805.00 N
Vc : 47,111.782 N
NOTE : Vu > ØVc STIRRUPS IS NECESSARY!
Vs : 20,449.329 N
Vs = (2/3)SQRT(Fc')(bwd) = 188,447.13 N
: Vs > (2/3)SQRT(Fc')(bwd) GET THE SPACING!
Vs = (1/3)SQRT(Fc')(bwd) = 94,223.56 N

MAXIMUM SPACING,"s"
: Vs > (1/3)SQRT(Fc')(bwd) D/2 OR 600 WILL USE!
D/2 OR 600 D/4 OR 300
D/2 : 170.00 D/4 : 85.00
say 200.00 say 100.00

USE!!! 200 USE!!! 100

WILL GOVERN! 200.00


ACTUAL DEFLECTION < ALLOWABLE DEFLECTION
ECTION @ +Mmax (see STAAD) 13.7 L/360 : 16.667 mm
SINGLY!
DOUBLY!

STIRRUPS
IS NO
NECESSA STIRRUPS
RY!
ADJUST
GET THE
SIZE OF SPACING!
BEAM

D/4 OR D/2 OR
300 WILL 600 WILL
USE! USE!
Design Data:

B1 at Discontinuous Support

Length of Beam : 6.00 m ASSUME


fc' : 27.00 MPa ρ: 0.0146377
fy : 414.00 MPa Design Moment
ρb : 0.02788140 M: 100,040,000.00
ρmax : 0.02091105 Beam width : 250.00
ρmin : 0.00338164 Req'd Depth : 290.81
ω: 0.22444527 Assume Rebar size : 20.00
B (ASSUME) : 250.00 Effective depth : 340.00
Required Steel Area : 1,244.21
dia. Bar 20.00 mm Qty of rebars : 3.96
Actual As : 1,256.64
ACTUAL
ρ: 0.01478397 Moment Capacity
ρmin : 0.00338164 M: 190,870,684.12
ρmax : 0.02091105 Moment Capacity > Design Moment
ω: 0.22668747
CHECK SHEAR @ DISTANCE "d"
bw : 160.00 mm Vu : 123,511.00
12 mm Vc : 47,111.782
NOTE : Vu > ØVc STIRRUPS IS NECESSARY!
Vs : 90,122.662
FORMULA : Vs = (2/3)SQRT(Fc')(bwd) = 188,447.13
NOTE : Vs > (2/3)SQRT(Fc')(bwd) GET THE SPACING!
FORMULA : Vs = (1/3)SQRT(Fc')(bwd) = 94,223.56
Av : 226.19
s: 353.29
MAXIMUM SPACING,"s"
NOTE : Vs > (1/3)SQRT(Fc')(bwd) D/2 OR 600 WILL USE!
D/2 OR 600
D/2 : 170.00
say 200.00

USE!!! 200

WILL GOVERN!
ACTUAL DEFLECTION < ALLOWABLE DEFLECTION
CHECK DEFLECTION @ +Mmax (see STAAD) 13.7 L/360 :
DESIGN OF BEAM
ACI-318

SUME Length of Beam :


fc' :
n Moment fy :
N-mm ρb :
250 250 mm ρmax :
400 400 mm ρmin :
mm ω:
340.00 B (ASSUME) :
mm 2

4 pcs. dia. Bar


mm 2

nt Capacity ρ:
N-mm ρmin :
SINGLY! ρmax :
esign Moment SINGLY!
DOUBLY! ω:

N bw :
N
STIRRUPS
S NECESSARY! IS NO NOTE : Vu > ØVc
N NECESSA STIRRUPS
RY!
N FORMULA :
E SPACING! ADJUST NOTE : Vs > (2/3)SQRT(Fc')(bwd)
GET THE
SIZE OF SPACING!
N BEAM FORMULA :
mm2
mm
M SPACING,"s"
00 WILL USE! D/4 OR D/2 OR NOTE : Vs > (1/3)SQRT(Fc')(bwd)
300 WILL 600 WILL
D/4 OR 300 USE! USE!
D/4 : 85.00
say 100.00

USE!!! 100

200.00 WILL GOVERN


N ACTU
L/360 : 16.667 mm CHECK DEFLECTION @ +Mmax (see STA
B1 at MIDSPAN

6.00 m ASSUME
27.00 MPa ρ: 0.0156833
414.00 MPa Design Moment
0.02788140 M: 93,090,000.00 N-mm
0.02091105 Beam width : 250.00 250 250 mm
0.00338164 Req'd Depth : 272.50 400 400 mm
0.24047707 Assume Rebar size : 20.00 mm
250.00 Effective depth : 340.00 340.00
Required Steel Area : 1,333.08 mm
2

20.00 mm Qty of rebars : 4.24 4 pcs.


Actual As : 1,256.64 mm
2

ACTUAL
0.01478397 Moment Capacity
0.00338164 M: 190,870,684.12 N-mm
0.02091105 Moment Capacity > Design Moment SINGLY!
0.22668747
CHECK SHEAR @ DISTANCE "d"
160.00 mm Vu : 60,805.00 N
Vc : 47,111.782 N
NOTE : Vu > ØVc STIRRUPS IS NECESSARY!
Vs : 20,449.329 N
Vs = (2/3)SQRT(Fc')(bwd) = 188,447.13 N
: Vs > (2/3)SQRT(Fc')(bwd) GET THE SPACING!
Vs = (1/3)SQRT(Fc')(bwd) = 94,223.56 N

MAXIMUM SPACING,"s"
: Vs > (1/3)SQRT(Fc')(bwd) D/2 OR 600 WILL USE!
D/2 OR 600 D/4 OR 300
D/2 : 170.00 D/4 : 85.00
say 200.00 say 100.00

USE!!! 200 USE!!! 100

WILL GOVERN! 200.00


ACTUAL DEFLECTION < ALLOWABLE DEFLECTION
ECTION @ +Mmax (see STAAD) 13.7 L/360 : 16.667 mm
SINGLY!
DOUBLY!

STIRRUPS
IS NO
NECESSA STIRRUPS
RY!
ADJUST
GET THE
SIZE OF SPACING!
BEAM

D/4 OR D/2 OR
300 WILL 600 WILL
USE! USE!
Design Data:

B1 at Discontinuous Support

Length of Beam : 6.00 m ASSUME


fc' : 27.00 MPa ρ: 0.0146377
fy : 414.00 MPa Design Moment
ρb : 0.02788140 M: 56,010,000.00
ρmax : 0.02091105 Beam width : 300.00
ρmin : 0.00338164 Req'd Depth : 198.64
ω: 0.22444527 Assume Rebar size : 20.00
B (ASSUME) : 300.00 Effective depth : 340.00
Required Steel Area : 1,493.05
dia. Bar 20.00 mm Qty of rebars : 4.75
Actual As : 942.48
ACTUAL
ρ: 0.00923998 Moment Capacity
ρmin : 0.00338164 M: 151,441,320.27
ρmax : 0.02091105 Moment Capacity > Design Moment
ω: 0.14167967
CHECK SHEAR @ DISTANCE "d"
bw : 210.00 mm Vu : 123,511.00
12 mm Vc : 61,834.214
NOTE : Vu > ØVc STIRRUPS IS NECESSARY!
Vs : 75,400.231
FORMULA : Vs = (2/3)SQRT(Fc')(bwd) = 247,336.86
NOTE : Vs > (2/3)SQRT(Fc')(bwd) GET THE SPACING!
FORMULA : Vs = (1/3)SQRT(Fc')(bwd) = 123,668.43
Av : 226.19
s: 422.27
MAXIMUM SPACING,"s"
NOTE : Vs > (1/3)SQRT(Fc')(bwd) D/2 OR 600 WILL USE!
D/2 OR 600
D/2 : 170.00
say 200.00

USE!!! 200

WILL GOVERN!
ACTUAL DEFLECTION < ALLOWABLE DEFLECTION
CHECK DEFLECTION @ +Mmax (see STAAD) 13.7 L/360 :
DESIGN OF BEAM
ACI-318

SUME Length of Beam :


fc' :
n Moment fy :
N-mm ρb :
300 300 mm ρmax :
400 400 mm ρmin :
mm ω:
340.00 B (ASSUME) :
mm 2

3 pcs. dia. Bar


mm 2

nt Capacity ρ:
N-mm ρmin :
SINGLY! ρmax :
esign Moment SINGLY!
DOUBLY! ω:

N bw :
N
STIRRUPS
S NECESSARY! IS NO NOTE : Vu > ØVc
N NECESSA STIRRUPS
RY!
N FORMULA :
E SPACING! ADJUST NOTE : Vs > (2/3)SQRT(Fc')(bwd)
GET THE
SIZE OF SPACING!
N BEAM FORMULA :
mm2
mm
M SPACING,"s"
00 WILL USE! D/4 OR D/2 OR NOTE : Vs > (1/3)SQRT(Fc')(bwd)
300 WILL 600 WILL
D/4 OR 300 USE! USE!
D/4 : 85.00
say 100.00

USE!!! 100

200.00 WILL GOVERN


N ACTU
L/360 : 16.667 mm CHECK DEFLECTION @ +Mmax (see STA
B1 at MIDSPAN

6.00 m ASSUME
27.00 MPa ρ: 0.0156833
414.00 MPa Design Moment
0.02788140 M: 82,360,000.00 N-mm
0.02091105 Beam width : 300.00 300 300 mm
0.00338164 Req'd Depth : 233.98 400 400 mm
0.24047707 Assume Rebar size : 20.00 mm
300.00 Effective depth : 340.00 340.00
Required Steel Area : 1,599.70 mm
2

20.00 mm Qty of rebars : 5.09 5 pcs.


Actual As : 1,570.80 mm
2

ACTUAL
0.01539996 Moment Capacity
0.00338164 M: 237,053,483.46 N-mm
0.02091105 Moment Capacity > Design Moment SINGLY!
0.23613278
CHECK SHEAR @ DISTANCE "d"
210.00 mm Vu : 60,805.00 N
Vc : 61,834.214 N
NOTE : Vu > ØVc STIRRUPS IS NECESSARY!
Vs : 5,726.897 N
Vs = (2/3)SQRT(Fc')(bwd) = 247,336.86 N
: Vs > (2/3)SQRT(Fc')(bwd) GET THE SPACING!
Vs = (1/3)SQRT(Fc')(bwd) = 123,668.43 N

MAXIMUM SPACING,"s"
: Vs > (1/3)SQRT(Fc')(bwd) D/2 OR 600 WILL USE!
D/2 OR 600 D/4 OR 300
D/2 : 170.00 D/4 : 85.00
say 200.00 say 100.00

USE!!! 200 USE!!! 100

WILL GOVERN! 200.00


ACTUAL DEFLECTION < ALLOWABLE DEFLECTION
ECTION @ +Mmax (see STAAD) 13.7 L/360 : 16.667 mm
SINGLY!
DOUBLY!

STIRRUPS
IS NO
NECESSA STIRRUPS
RY!
ADJUST
GET THE
SIZE OF SPACING!
BEAM

D/4 OR D/2 OR
300 WILL 600 WILL
USE! USE!
Design Data:

B1 at Discontinuous Support

Length of Beam : 4.30 m ASSUME


fc' : 27.00 MPa ρ: 0.0104555
fy : 414.00 MPa Design Moment
ρb : 0.02788140 M: 48,330,000.00
ρmax : 0.02091105 Beam width : 300.00
ρmin : 0.00338164 Req'd Depth : 213.71
ω: 0.16031805 Assume Rebar size : 20.00
B (ASSUME) : 300.00 Effective depth : 340.00
Required Steel Area : 1,066.46
dia. Bar 20.00 mm Qty of rebars : 3.39
Actual As : 942.48
ACTUAL
ρ: 0.00923998 Moment Capacity
ρmin : 0.00338164 M: 151,441,320.27
ρmax : 0.02091105 Moment Capacity > Design Moment
ω: 0.14167967
CHECK SHEAR @ DISTANCE "d"
bw : 210.00 mm Vu : 123,511.00
12 mm Vc : 61,834.214
NOTE : Vu > ØVc STIRRUPS IS NECESSARY!
Vs : 75,400.231
FORMULA : Vs = (2/3)SQRT(Fc')(bwd) = 247,336.86
NOTE : Vs > (2/3)SQRT(Fc')(bwd) GET THE SPACING!
FORMULA : Vs = (1/3)SQRT(Fc')(bwd) = 123,668.43
Av : 226.19
s: 422.27
MAXIMUM SPACING,"s"
NOTE : Vs > (1/3)SQRT(Fc')(bwd) D/2 OR 600 WILL USE!
D/2 OR 600
D/2 : 170.00
say 200.00

USE!!! 200

WILL GOVERN!
ACTUAL DEFLECTION < ALLOWABLE DEFLECTION
CHECK DEFLECTION @ +Mmax (see STAAD) 13.7 L/360 :
DESIGN OF BEAM
ACI-318

SUME Length of Beam :


fc' :
n Moment fy :
N-mm ρb :
300 300 mm ρmax :
400 400 mm ρmin :
mm ω:
340.00 B (ASSUME) :
mm 2

3 pcs. dia. Bar


mm 2

nt Capacity ρ:
N-mm ρmin :
SINGLY! ρmax :
esign Moment SINGLY!
DOUBLY! ω:

N bw :
N
STIRRUPS
S NECESSARY! IS NO NOTE : Vu > ØVc
N NECESSA STIRRUPS
RY!
N FORMULA :
E SPACING! ADJUST NOTE : Vs > (2/3)SQRT(Fc')(bwd)
GET THE
SIZE OF SPACING!
N BEAM FORMULA :
mm2
mm
M SPACING,"s"
00 WILL USE! D/4 OR D/2 OR NOTE : Vs > (1/3)SQRT(Fc')(bwd)
300 WILL 600 WILL
D/4 OR 300 USE! USE!
D/4 : 85.00
say 100.00

USE!!! 100

200.00 WILL GOVERN


N ACTU
L/360 : 11.944 mm CHECK DEFLECTION @ +Mmax (see STA
B1 at MIDSPAN

6.00 m ASSUME
27.00 MPa ρ: 0.0156833
414.00 MPa Design Moment
0.02788140 M: 82,360,000.00 N-mm
0.02091105 Beam width : 300.00 300 300 mm
0.00338164 Req'd Depth : 233.98 400 400 mm
0.24047707 Assume Rebar size : 20.00 mm
300.00 Effective depth : 340.00 340.00
Required Steel Area : 1,599.70 mm
2

20.00 mm Qty of rebars : 5.09 5 pcs.


Actual As : 1,570.80 mm
2

ACTUAL
0.01539996 Moment Capacity
0.00338164 M: 237,053,483.46 N-mm
0.02091105 Moment Capacity > Design Moment SINGLY!
0.23613278
CHECK SHEAR @ DISTANCE "d"
210.00 mm Vu : 60,805.00 N
Vc : 61,834.214 N
NOTE : Vu > ØVc STIRRUPS IS NECESSARY!
Vs : 5,726.897 N
Vs = (2/3)SQRT(Fc')(bwd) = 247,336.86 N
: Vs > (2/3)SQRT(Fc')(bwd) GET THE SPACING!
Vs = (1/3)SQRT(Fc')(bwd) = 123,668.43 N

MAXIMUM SPACING,"s"
: Vs > (1/3)SQRT(Fc')(bwd) D/2 OR 600 WILL USE!
D/2 OR 600 D/4 OR 300
D/2 : 170.00 D/4 : 85.00
say 200.00 say 100.00

USE!!! 200 USE!!! 100

WILL GOVERN! 200.00


ACTUAL DEFLECTION < ALLOWABLE DEFLECTION
ECTION @ +Mmax (see STAAD) 13.7 L/360 : 16.667 mm
SINGLY!
DOUBLY!

STIRRUPS
IS NO
NECESSA STIRRUPS
RY!
ADJUST
GET THE
SIZE OF SPACING!
BEAM

D/4 OR D/2 OR
300 WILL 600 WILL
USE! USE!
Design Data:

B1 at Discontinuous Support

Length of Beam : 2.00 m ASSUME


fc' : 27.00 MPa ρ: 0.0104555
fy : 414.00 MPa Design Moment
ρb : 0.02788140 M: 60,000,000.00
ρmax : 0.02091105 Beam width : 250.00
ρmin : 0.00338164 Req'd Depth : 260.85
ω: 0.16031805 Assume Rebar size : 16.00
B (ASSUME) : 250.00 Effective depth : 292.00
Required Steel Area : 763.25
dia. Bar 16.00 mm Qty of rebars : 3.80
Actual As : 1,005.31
ACTUAL
ρ: 0.01377137 Moment Capacity
ρmin : 0.00338164 M: 137,565,632.05
ρmax : 0.02091105 Moment Capacity > Design Moment
ω: 0.21116093
CHECK SHEAR @ DISTANCE "d"
bw : 160.00 mm Vu : 123,511.00
12 mm Vc : 40,460.707
NOTE : Vu > ØVc STIRRUPS IS NECESSARY!
Vs : 96,773.738
FORMULA : Vs = (2/3)SQRT(Fc')(bwd) = 161,842.83
NOTE : Vs > (2/3)SQRT(Fc')(bwd) GET THE SPACING!
FORMULA : Vs = (1/3)SQRT(Fc')(bwd) = 80,921.41
Av : 226.19
s: 282.56
MAXIMUM SPACING,"s"
NOTE : Vs > (1/3)SQRT(Fc')(bwd) D/4 OR 300 WILL USE!
D/2 OR 600
D/2 : 146.00
say 200.00

USE!!! 200

WILL GOVERN!
ACTUAL DEFLECTION < ALLOWABLE DEFLECTION
CHECK DEFLECTION @ +Mmax (see STAAD) 13.7 L/360 :
DESIGN OF BEAM
ACI-318

SUME Length of Beam :


fc' :
n Moment fy :
N-mm ρb :
250 250 mm ρmax :
350 350 mm ρmin :
mm ω:
292.00 B (ASSUME) :
mm 2

5 pcs. dia. Bar


mm 2

nt Capacity ρ:
N-mm ρmin :
SINGLY! ρmax :
esign Moment SINGLY!
DOUBLY! ω:

N bw :
N
STIRRUPS
S NECESSARY! IS NO NOTE : Vu > ØVc
N NECESSA STIRRUPS
RY!
N FORMULA :
E SPACING! ADJUST NOTE : Vs > (2/3)SQRT(Fc')(bwd)
GET THE
SIZE OF SPACING!
N BEAM FORMULA :
mm2
mm
M SPACING,"s"
00 WILL USE! D/4 OR D/2 OR NOTE : Vs > (1/3)SQRT(Fc')(bwd)
300 WILL 600 WILL
D/4 OR 300 USE! USE!
D/4 : 73.00
say 100.00

USE!!! 100

100.00 WILL GOVERN


N ACTU
L/360 : 5.556 mm CHECK DEFLECTION @ +Mmax (see STA
B1 at MIDSPAN

6.00 m ASSUME
27.00 MPa ρ: 0.0104555
414.00 MPa Design Moment
0.02788140 M: 81,300,000.00 N-mm
0.02091105 Beam width : 250.00 250 250 mm
0.00338164 Req'd Depth : 303.64 350 350 mm
0.16031805 Assume Rebar size : 16.00 mm
250.00 Effective depth : 292.00 292.00
Required Steel Area : 763.25 mm
2

20.00 mm Qty of rebars : 2.43 4 pcs.


Actual As : 1,256.64 mm
2

ACTUAL
0.01721421 Moment Capacity
0.00338164 M: 165,839,010.94 N-mm
0.02091105 Moment Capacity > Design Moment SINGLY!
0.26395116
CHECK SHEAR @ DISTANCE "d"
160.00 mm Vu : 60,805.00 N
Vc : 40,460.707 N
NOTE : Vu > ØVc STIRRUPS IS NECESSARY!
Vs : 27,100.404 N
Vs = (2/3)SQRT(Fc')(bwd) = 161,842.83 N
: Vs > (2/3)SQRT(Fc')(bwd) GET THE SPACING!
Vs = (1/3)SQRT(Fc')(bwd) = 80,921.41 N

MAXIMUM SPACING,"s"
: Vs > (1/3)SQRT(Fc')(bwd) D/2 OR 600 WILL USE!
D/2 OR 600 D/4 OR 300
D/2 : 146.00 D/4 : 73.00
say 200.00 say 100.00

USE!!! 200 USE!!! 100

WILL GOVERN! 200.00


ACTUAL DEFLECTION < ALLOWABLE DEFLECTION
ECTION @ +Mmax (see STAAD) 13.7 L/360 : 16.667 mm
SINGLY!
DOUBLY!

STIRRUPS
IS NO
NECESSA STIRRUPS
RY!
ADJUST
GET THE
SIZE OF SPACING!
BEAM

D/4 OR D/2 OR
300 WILL 600 WILL
USE! USE!