: oT SPECTRAA TECHNOLOGY SOLUTIONS PVT LTD PROCEDURE FOR STORING OF WELDING AND NDT CONSUMABLE Procedure: Storing of welding and NDT consumable 1 20-09-2017 Issue No. | Date Description | - Storing of welding anc NDT consumables Document No: STPL/STO/WEL-NOT ————— [Prepared by [Reviewed by Reviewed by ‘Approved by Hithesh D Nambji Naveen Harsha BrahamacharyValduri . ys sn ost | [ac engineer ‘Qc engineer Store In-charge Factory Manage? SPECTRAA TECHNOLOGY SOLUTIONS PVT LTD Spectrar The. PROCEDURE FOR STORING OF WELDING AND NDT CONSUMABLE TABLE OF CONTENT | SCoPE PURPOSE "3.0 | RESPONSIBILITY | [4.0 | REFERNCE [5.0 | WELDING CONSUMABLE 6.0 | NDT CONSUMABLE 7.0 | PRECAUTIONS [so | Feeoeps, SPECTRAA TECHNOLOGY SOLUTIONS PVT LTD PROCEDURE FOR STORING OF WELDING AND NDT CONSUMABLE 4.0SCOPE: The scope of procedure is to provide guidelines for controlling of receipt, storage and issue of welding and NDT consumables. 2.0PURPOSE: The purpose of this procedure is to control welding and NDT consumables received, stored and issued in control manner and documentation to assure the usage of proper - consumables for the work. 3.0RESPONSIBILITY: Store officer/In-charge is responsible for proper unloading and keeping of material at specified location as per stores layout 4.0 REFERENCE: Welding electrode and filler materials : ASME SECTION II PART C | Non Destructive Testing ASME SECTION V | | | 5.0 WELDING CONSUMABLES A. All welding Electrodes! Filler wires, etc. shall conform to AWS class specified in the specification WPS/POR. i B. The consumables shall be checked using the MTC provided along with it and also check for any physical damage. GRN shall be prepared and documented along with MTC. All electrodes shall be stored in dry room and stored properly to avoid deterioration. The issue of electrode shall be free from rust, oil, grease and other foreign matter | which affects the quality of welding Stores will raise indent for consumable required, signed by QC engineer. The issue of electrode’ filler wire will be first in first out basis. Issue of electrodes should be recorded and monitored All filler wires shall be properly covered and kept in separate covers without keeping on floor. Electrodes which are damaged/wet shall not be used. -r@nm m 90 6.0CONTROL OF ARGON GAS A. Argon gas MTC shall be verified by QC while receiving the material B. Argon gas used in SS material for shedding and purging shall be 99.97% purity 3 and moisture 10.5ppm SPECTRAA TECHNOLOGY SOLUTIONS PVT LTD PROCEDURE FOR STORING OF WELDING AND NDT CONSUMABLE 7.0 DPT CONSUMABLES ‘A. Consumables shall be stored in room temperature as per manufacturer recommendation. B. Application of consumables shall be done as per manufacturer recommendation Batch number with test certificates shall be verified while receiving The sulphur content and halogen content shall not exceed 25PPM and flash point shall not be more than 600c, the same will be reviewed with test certificate. Expiry date of DPT consumables shall be checked After consuming the LPT consumables the empty containers shall be Y punctured and deposited to waste bin G. Lint free cloth shall be used for cleaning purpose. go mm 8.0 PRECAUTIONS A. The electrodes shall be stored in dry atmosphere area. B. Clean the left out DPT consumables after testing. 9.0 RECORDS GRN for filler wire, gas, DPT consumables shall be documented along with the Test certificate

You might also like