SL Tasks Service Codes Description of Scope
SL Tasks Service Codes Description of Scope
TOTAL 81 Tasks
TASK CODES C. Mechanical, Electrical, Plumbing & Fire - MEP - (15% - Weightage)
AEC-MEP-01 26 Preparing Preliminary Electrical Drawings and Design Basis Report - (Pre-EPC)
AEC-MEP-02 27 Preparing Preliminary Water Supply & Plumbing Drawings - (Pre-EPC)
AEC-MEP-03 28 Preparing Preliminary Fire Service Drawings - (Pre-EPC)
AEC-MEP-04 29 Preparing Preliminary HVAC/ Mechanical Drawings - (Pre-EPC)
AEC-MEP-05 30 Preparing Final Electrical Drawings for Tenders - (Pre-EPC)
AEC-MEP-06 31 Preparing Final Water Supply & Plumbing Drawings for Tenders - (Pre-EPC)
AEC-MEP-07 32 Preparing Final Fire Service Drawings for Tenders - (Pre-EPC)
AEC-MEP-08 33 Preparing Final HVAC/ Mechanical Drawings for Tenders - (Pre-EPC)
AEC-MEP-09 34 Vetting the Electrical (MEP-BRD) Drawings furnished by EPC Contractor
AEC-MEP-10 35 Vetting the Water Supply & Plumbing (MEP-BRD) Drawings furnished by EPC Contractor
AEC-MEP-11 36 Vetting the Fire Services (MEP-BRD) Drawings furnished by EPC Contractor
AEC-MEP-12 37 Vetting the HVAC/ Mechanical (MEP-BRD) Drawings furnished by EPC Contractor
AEC-MEP-13 38 Approving and communicating as per drawing approval matrix of all the Electrical drawings, load
particulars, etc furnished by EPC contractor (GFC)
AEC-MEP-14 39 Approving and communicating as per drawing approval matrix of all the Water Supply & Plumbing
drawings, load particulars, STP, WTP etc furnished by EPC contractor (GFC)
AEC-MEP-15 40 Approving and communicating as per drawing approval matrix of all the Fire drawings, details etc
furnished by EPC contractor (GFC)
AEC-MEP-16 41 Approving and communicating as per drawing approval matrix of all the HVAC/ Mechanical plans,
working drawings, sectional details furnished by EPC contractor (GFC)
AEC-MEP-17 42 Preparation of MEP BoQs based on MEP-BRD Drawings furnished by EPC Contractor
AEC-MEP-18 43 Preparation of Final MEP DPR based on MEP-BRD Drawings furnished by EPC Contractor
AEC-MEP-19 44 Fortnightly visit and submission of Field Report (MEP-Mechanical) duly evaluating the work
AEC-MEP-20 45 Fortnightly visit and submission of Field Report (MEP-Electrical) duly evaluating the work
AEC-MEP-21 46 Fortnightly visit and submission of Field Report (MEP-Plumbing) duly evaluating the work
AEC-MEP-22 47 Fortnightly visit and submission of Field Report (MEP-Fire) duly evaluating the work
AEC-MEP-23 48 Coordinating with EPC contractors in preparing As-Built Electrical Drawings
AEC-MEP-24 49 Coordinating with EPC contractors in preparing As-Built after Supply & Plumbing Drawings
AEC-MEP-25 50 Coordinating with EPC contractors in preparing As-Built Fire Services Drawings
AEC-MEP-26 51 Coordinating with EPC contractors in preparing As-Built HVAC/ Mechanical Drawings