Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

Part Submission

Jabil Production Part Approval Process (JPPAP)

Submission Date: 11-Nov-2021 Part Description: VA,COMP_PREPPING (LA1000-003Y)

Part Number: LA1000-003Y Revision / ECN: B Project Name: JABIL-LAM


Part Weight Runner Weight PPAP
Drawing No /Rev 07-ME40-LAMGEN2-001/B Drawing Pages 1-4 (grms): (grms): Level

Details of Submission 1st Submission Refer Invoice Refer Invoice 3


Supplier Information and Declaration
I affirm that the samples represented by this warrant are representative of our parts, which were made by a process with controls indicative of good manufacturing practices. I also certify
that documented evidence of such compliance is on file and available for review. Advanced notification for any change to the part/process or manufacturing location will be provided via
the PCN process and obtain the approval from Jabil in advance of the change implementation.

Supplier Name: Winchester Interconnect (M) Sdn. Bhd. Submitted By: YH Ong
Address: No.1651, Lorong Perusahaan Maju 8, Title: NPI ENGINEER
Manufacturing Location: Prai Industrial Estate 4, 13600 Prai, Penang. Signature:

Need for this Submission


Submission Reason Submission Documentation
(If Yes, tick the box) ?

✘ Initial Submission Design Record

Engineering Change(s) to design records Authorized Engineering Change Documents, if any

Tooling:Transfer, Replacement, Refurbishment Customer Engineering Approval, if required

Correction of Discrepancy Design FMEA

Change to Optional Construction or Material Process Flow Diagrams ✘

Change in Part Processing Process FMEA ✘

Sub-Supplier, Manufacturing or Material Source Change Control Plan ✘

Tooling inactive > 12 Months Gage Repeatability and Reproducibility Report


Parts Produced at Additional Location Dimensional Results - FAIR


Material, Performance Test Results ✘

Dimensional FAI Submission Results Initial Process Studies - Cpk

Qualified Laboratory Documentation


Parts / Samples meet all drawing
specifications requirements? Appearance Approval Report (AAR), if applicable ✘

Yes ✘ Sample Product ✘

No Jabil Specific Requirements


If No, Deviation- Action sheet to be completed. (if any, list below)

Parts are cosmetically acceptable


Yes ✘ No
Is each Customer Tool properly tagged and numbered ? Yes No N/A ✘ If no customer tool available, tick "N/A".
If Yes, fill the Tool No. here: If No, explain the reason here: N/A
Supplier Comments (leave it blank if no comments)
1, FA Quantity not enough to compute Cpk. Reference IPC/WHMA-A-620 for unstate dimension tolerance.
2, For Process FMEA, we only follow the IPC/WHMA-A-620B standard only

Print Name: SY Cheah Title: QA Engineer Phone: 04-5083535 Fax: 04-5080810

Supplier Authorized Signature: S Y Cheah Email: sy.cheah@winconn.com Date: 11-Nov-2021

Submission Sign Off ( Jabil / Customer)


Approval Status
Approved ✘ Jabil Representative (Signature) Date 23rd Feb 2022
Rejected Printed Name Kian Meng Mui

Customer Representative (Signature). "Not Mandatory"


Approved / Agreed Run Rate
Printed Name Date

Comments:
Form 00-MT80-1000-00801-G

You might also like