Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

See discussions, stats, and author profiles for this publication at: https://www.researchgate.

net/publication/355771550

Building Information Modeling for Timber Buildings-A Review

Conference Paper · November 2021

CITATIONS READS
0 340

2 authors:

Yun-Tsui Chang Shang-Hsien (Patrick) Hsieh


National Taiwan University National Taiwan University
23 PUBLICATIONS   145 CITATIONS    225 PUBLICATIONS   1,875 CITATIONS   

SEE PROFILE SEE PROFILE

Some of the authors of this publication are also working on these related projects:

BIM Applications View project

Contracting for Integrated Project Delivery (IPD) in projects in Taiwan View project

All content following this page was uploaded by Yun-Tsui Chang on 30 October 2021.

The user has requested enhancement of the downloaded file.


38th International Symposium on Automation and Robotics in Construction (ISARC 2021)

Building Information Modeling for Timber Buildings- A


Review
Y.T. Chang1a, T.Y. Li2a, S.H. Hsieh3a

a
Department of Civil Engineering, National Taiwan University, Taiwan
E-mail: ytchang@caece.net, r09521625@ntu.edu.tw, shhsieh@ntu.edu.tw

Abstract on a project [3]. The building industry has studied the


Timber has long been used in the human building benefits of BIM for the past decade [4]. Yet, how this
industry. With recent groundbreaking technologies and technology has benefited the timber building industry is
urgent calls for a lower carbon built environment, timber rarely reviewed and discussed.
construction has become more industrial and popular
globally. Nevertheless, it still faces many design-related
difficulties and project management challenges. Building 2 Literature review and analysis
Information Modeling (BIM), regarded as a renovative Relevant literature is collected by using keywords
technology and paradigm that enables better decision- including “building information modeling (BIM)” and
making and project delivery process, seems ideal for “timber/ wood buildings” for article titles, abstracts, and
resolving current challenges in the timber building keywords via Scopus in mid-May 2021. 57 papers fitted
industry. However, how BIM is adopted in the industry the searching criteria, and 19 of them were excluded due
is limited explored and discussed. This study aims to find to their languages (non-English), types (book chapter), or
the critical research focuses, BIM uses, current scope (not related to BIM or building) or repeating.
limitations, and future potentials of BIM for timber
building via a series of literature reviews and analyses. 2.1 General profile
The results can provide readers with state-of-the-art
knowledge of the current BIM application and Based on the collected literature, BIM has drawn
development for the timber building industry and attention from the timber building industry since this
directions for future research. technology has emerged around 2010. Yet this topic has
Keywords started to gain more attention only after 2016 and has
Building Information Modeling, Timber Buildings, grown steadily in recent years. European affiliations have
Industrial Construction, Lean Concept contributed to this research topic the most, accounting for
84% of the total collected publications, while the Asian
and American ones for 8%, respectively. Therefore, how
1 Introduction BIM can benefit the timber construction industry in
Timber is a common building material that has been different regions should be investigated and compared in
used for different building components and layers across the future.
the globe since ancient human history. With some latest
technologies, timber buildings have overcome their well- 2.2 Research Focus
known defects and gained much popularity [1]. However,
although the timber building industry has been developed
for centuries, many challenges occur, including design-
related difficulties, poor coordination among the project
parties, lack of experience, etc. [2]. These are even more
critical as industrialization becomes an unstoppable trend.
Today’s advancing information and communication
industry has driven the building industry to transform to
be more effective and efficient. One of the most powerful
information technologies adopted in the industry is
building information modeling (BIM), which encourages Figure 1. The main focus of the reviewed literature
significant changes in the workflow and project delivery
processes and integration of the roles of all stakeholders

1
38th International Symposium on Automation and Robotics in Construction (ISARC 2021)

Three main research focuses are identified: using Echoing the research focuses identified in the
BIM for optimal design, innovative process, and previous section, design-related BIM uses are mentioned
reservation & retrofit (as shown in Figure 1). The first the most in the papers, notably the power of reviewing
focus has been studied the most (accounting for 42% of design models, authoring design, and analyzing
total literature collection), which refers to BIM for structural, engineering, and energy performance of
parametric [5][6] and structural design [7][8][9] of timber buildings. Nevertheless, how the created BIM
timber buildings along with their acoustic [10][11] and design models can be used in later stages remains
sustainable [12][13] performance simulation, cost challenging [26]. And how BIM can store essential
estimation [13], and LCA [14][15]. In addition, code information for multiple building performance analyses
checking and compliance [16][17][18][19] is also a key of timber buildings is to be studied more [24][25][29][34].
strength of BIM for better timber building design. This The timber building industry also knows the strength
focus indicates that timber building design is challenged of production and construction-related BIM uses, e.g.,
with various aspects, including modularity, sustainability, authoring construction site logistics models and
and higher building standards. fabricating timber products. These uses are critical for
The second focus is BIM for the innovative process industrial timber construction, which should be studied
of timber building projects (about 37% of total papers), more for training and educational purposes [34].
i.e., using BIM to integrate the lean concept into the Capturing existing conditions is a BIM use related to
project delivery process [20][21][22][23] to create the whole project lifecycle, which is also highlighted in
collaboration platform [24][25] and to assist industrial the collected literature. Combined with rapidly
and prefabricate construction process [26][27]. Also, as developing scanning technology, the potency of this BIM
industrial timber construction is becoming the primary use is expected to enhance continually.
trend, how BIM can promote a more integrated and
leaner process is a critical research topic.
The third focus is BIM for reservation and retrofit of 3 Limitations and potentials of BIM for
existing timber buildings (accounting for 21% in total), timber buildings
referring to using scanning and BIM technology to create
Based upon literature review and analysis previously,
a data repository of historical timber buildings for future
three key challenges of BIM for timber buildings and
work and reference [28][29][30][31] and using BIM and
potential research directions are identified and presented
CNC technology to retrofit existing timber buildings with
as follows.
prefabricated elements [32][33]. The latter topic is
expected to gain more attention since the need to retrofit
existing buildings for higher energy efficiency is (1) A calling for integrated analyses
excellent, and prefabricated timber elements are seen as It is hard to make optimal design decisions when the
an environmentally friendly material and time-saving simulation results in different systems are scattered.
construction technique to be adopted. Therefore, the need for integrated design analysis for
timber building is highlighted [8][18][35]. Nevertheless,
2.3 BIM uses only a few articles currently tried to address this matter
via establishing BIM platforms to evaluate numerous
The BIM use framework proposed by Pennsylvania
design factors at once [24][25]. How BIM can assist in
State University [4] is used to label the collected papers
achieving integrated analysis, including construction
and is shown in Figure 4.
hazard, project lifecycle, etc., for better decision making
for timber buildings still require much investigation [36].

(2) Building up more timber building-related


BIM data/ database
BIM is powerful in storing information from multiple
systems throughout the project lifecycle. However,
valuable data are usually recollected from scratch for new
projects, which often leads to the loss of empirical inputs
and considerable rework. For instance, Buhamdan et al.
state that HAVS (Hand-arm Vibration Syndrome) or other
Figure 4. BIM uses mentioned in collected papers hazard variables could be attached to BIM objects [19]. This
concept can apply to other domains, e.g., acoustic
simulation and structural performance, to fasten the
evaluation process. Additionally, a BIM data bank

2
38th International Symposium on Automation and Robotics in Construction (ISARC 2021)

containing reference profiles of past projects can [3] Azhar, S. (2011). Building information modeling
contribute to cost security [17] and is essential for cost (BIM): Trends, benefits, risks, and challenges for
estimates. Once these databases are established, design the AEC industry. Leadership and Management in
standards or BIM guidelines for timber buildings can Engineering, 11(3), 241–252.
emerge, which is a critical move toward an industrialized [4] Kreider, R. G., & Messner, J. I. (2013). The uses of
construction industry. BIM. Classifying and Selecting BIM, Pennsylvania
State University (9th version).
(3) Higher efficiency in data transformation and [5] Kim, J., &Jeon, B. H. (2012). Design integrated
transfer parametric modeling methodology for Han-ok.
Journal of Asian Architecture and Building
How to transform information in a BIM database into Engineering, 11(2), 239–243.
other applications is an important issue. For example, Mol [6] Haiyan, D., Hong, Z., & Bin, M. (2020).
et al. pointed out exploration of the geometry variation Manufacture and assembly mechanism of dougong.
and conservation state directly without assessing the IOP Conference Series: Materials Science and
associated cloud of points in the database [30]. Another Engineering, 960(2).
suggestion is to identify materials and construction [7] Livingstone, A., Menendez, J., Leitch, K.,
techniques in a point cloud model [28]. Building & Hairstans, R. (2015). The Case for Mass
middleware to facilitate information transferring between Customisation of Structural Timber
software is also needed. [26] Efficient data transfer from Design. Structures Congress 2015, 2804–2814.
design to manufacture stage is key to fabricated [8] Umar, U. A., Shafiq, N., Malakahmad, A.,
construction. BIM can be seen as a workflow to manage Nuruddin, M. F., Farhan, S. A., & Salihi, I. U.
data during the whole process rather than just software. (2016). Application of structural building
information modeling (S-BIM) for sustainable
buildings design and waste reduction: A review.
4 Conclusion International Journal of Applied Engineering
This study presents an overview of past research on Research, 11(2), 1523–1532.
BIM for timber buildings through a series of literature [9] Livingstone, A., Patlakas, P., Milne, M., Smith, S.,
reviews and analyses, including its research focuses, & Hairstans, R. (2016). Multi-dimensional data
BIM uses, current limitations, and future potentials. The fitting for the structural design of a simple timber
three main research focuses are (1) BIM for optimal connection. WCTE 2016 - World Conference on
design, (2) innovative process, and (3) reservation and Timber Engineering, August.
retrofit of timber buildings. Moreover, three critical [10] Frischmann, F., Kollmannsberger, S., Rabold, A., &
potentials of BIM application for timber building are Rank, E. (2014). High order Finite Elements for
identified: (1) the need of establishing platforms for mid-frequency vibro-acoustics. Proceedings of the
integrated design analysis, (2) the need for databases for International Conference on Structural Dynamic,
more efficient timber building design and evaluation EURODYN, 2014-Janua, 3341–3348.
process, and (3) higher efficiency in data transformation [11] Mastino, C. C., Concu, G., Baccoli, R., Frattolillo,
and transfer across project phases to establish a leaner A., & DiBella, A. (2019). Methods for acoustic
timber construction industry. The outcomes of this paper classification in buildings: An example of
can provide readers start-of-the-art knowledge on current application of BIM procedures on wooden
BIM application and development for timber buildings buildings. INTER-NOISE 2019 MADRID - 48th
and directions for future research. International Congress and Exhibition on Noise
Control Engineering.
[12] Yarramsetty, S., Sivakumar, M., & Anand Raj, P.
References (2021). Reduction of Annual Energy Consumption
[1] Ruuska, A., & Häkkinen, T. (2016). Efficiency in of Multifamily Dwellings Using BIM and
the Delivery of Multi-story Timber Buildings. Simulation Tools. In RILEM Bookseries (Vol. 29).
Energy Procedia, 96 (October), 190–201. Springer International Publishing.
[2] Ahmed, S., & Arocho, I. (2020). Mass timber [13] Sajjadian, S. M., Tupenaite, L., & Barlow, C.
building material in the U.S. construction industry: (2021). Four Angles of Using Timber in Tall
Determining the existing awareness level, Buildings. In Smart Innovation, Systems and
construction-related challenges, and Technologies (Vol. 203). Springer Singapore.
recommendations to increase its current acceptance [14] Ajayi, S., Oyedele, L., Ceranic, B., Gallanagh, M.,
level. Cleaner Engineering and Technology, 1 & Kadiri, K. O. (2015). Life cycle environmental
(October), 100007. performance of material specification: a BIM-

3
View publication stats

38th International Symposium on Automation and Robotics in Construction (ISARC 2021)

enhanced comparative assessment. International catalog for timber structures. Automation in


Journal of Sustainable Building Technology and Construction, 103, 13–25.
Urban Development, 6(1), 14–24. [26] Lennartsson, M., Yitmen, I., Movaffaghi, H., &
[15] Soust-Verdaguer, B., Llatas, C., & Moya, L. (2020). Linderoth, H. (2020). Framework for Digital
Comparative BIM-based Life Cycle Assessment of Development in Industrialized Housebuilding.
Uruguayan timber and concrete-masonry single- Advances in Transdisciplinary Engineering, 13,
family houses in design stage. Journal of Cleaner 335–345.
Production, 277. [27] Staub-French, S., Pilon, A., Poirier, E., Fallahi, A.,
[16] Patlakas, P., Livingstone, A., Hairstans, R., & Kasbar, M., Calderon, F., Teshnizi, Z., & Froese, T.
Neighbour, G. (2018). Automatic code compliance (2021). Construction process innovation on Brock
with multi-dimensional data fitting in a BIM Commons Tallwood House.
context. Advanced Engineering Informatics, [28] Andrews, D. P., Bedford, J., & Bryan, P. G. (2013).
38(June), 216–231. A Comparison of Laser Scanning and Structure
[17] Geier, S., & Schwehr, P. (2019). Criteria catalogue From Motion As Applied To the Great Barn At
and analysis model to manage complexity in Harmondsworth, Uk. The International Archives of
prefabricated timber construction. IOP Conference the Photogrammetry, Remote Sensing and Spatial
Series: Earth and Environmental Science, 323 (1). Information Sciences, XL-5/W2(November), 31–36.
[18] Kincelova, K., Boton, C., Blanchet, P., & Dagenais, [29] Bassier, M., Hadjidemetriou, G., Vergauwen, M.,
C. (2020). Fire safety in tall timber building: A VanRoy, N., & Verstrynge, E. (2016).
BIM-based automated code-checking approach. Implementation of scan-to-BIM and FEM for the
Buildings, 10(10). documentation and analysis of heritage timber roof
[19] Buhamdan, S., Duncheva, T., & Alwisy, A. (2021). structures. Lecture Notes in Computer Science
Developing a BIM and Simulation-Based Hazard (Including Subseries Lecture Notes in Artificial
Assessment and Visualization Framework for CLT Intelligence and Lecture Notes in Bioinformatics),
Construction Design. Journal of Construction 10058 LNCS(October), 79–90.
Engineering and Management, 147(3). [30] Mol, A., Cabaleiro, M., Sousa, H., & Branco, J.
[20] Breit, M., Häubi, F., & Arnold, N. (2010). Digital (2020). HBIM for storing lifecycle data regarding
simulation in lean project development. decay and damage in existing timber structures.
Challenging Lean Construction Thinking: What Do Automation in Construction, 117(May), 103262.
We Think and What Do We Know? - 18th Annual [31] Heesom, D., Boden, P., Hatfield, A., DeLos Santos
Conference of the International Group for Lean Melo, A., & Czarska-Chukwurah, F. (2020).
Construction, IGLC 18, 622–632. Implementing a HBIM approach to manage the
[21] LeRoux, S., Bannier, F., Bossanne, E., & translocation of heritage buildings. Engineering,
Stieglmeier, M. (2016). Investigating the Construction and Architectural Management.
interaction of building information modelling and [32] Larsen, K. E., Lattke, F., Ott, S., & Winter, S.
lean construction in the timber industry. WCTE (2011). Surveying and digital workflow in energy
2016 - World Conference on Timber Engineering. performance retrofit projects using prefabricated
[22] Lattke, F., & Hernandez-Maetschl, S. (2016). elements. Automation in Construction, 20(8), 999–
LeanWOOD - Advancing performance of design 1011.
teams in timber construction. WCTE 2016 - World [33] Iturralde, K. (2012). Refurbishing homes for elderly
Conference on Timber Engineering, August. using BIM and CNC technology. 2012 Proceedings
[23] Geier, S. (2019). LeanWOOD - Towards resilient of the 29th International Symposium of Automation
design and building processes. IOP Conference and Robotics in Construction, ISARC 2012, March.
Series: Earth and Environmental Science, 323(1). [34] Lamartina, L., & Sa, J. (2019). Structural pre-
[24] Mediavilla, A., Arenaza, X., Sánchez, V., Sebesi, analysis through implementing revit structures and
Y., & Philipps, P. (2018). Renobim: Collaboration robot to develop and compare engineered timber
platform based on open bim workflows for energy structural families. WIT Transactions on the Built
renovation of buildings using timber prefabricated Environment, 192 (January), 229–243.
products. EWork and EBusiness in Architecture, [35] Yang, X., Koehl, M., & Grussenmeyer, P. (2017).
Engineering and Construction - Proceedings of the Parametric modelling of as-built beam framed
12th European Conference on Product and Process structure in BIM environment. International
Modelling, ECPPM 2018, 281–288. Archives of the Photogrammetry, Remote Sensing
[25] Bianconi, F., Filippucci, M., & Buffi, A. (2019). and Spatial Information Sciences - ISPRS Archives,
Automated design and modeling for mass- 42(2W3), 651–657.
customized housing. A web-based design space

You might also like