REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


REGIONAL OFFICE VII
CEBU 6TH DISTRICT ENGINEERING OFFICE
A.C. CORTES AVENUE, MANDAUE CITY, CEBU

C.Y. 2023 PROJECT


DETAILED ENGINEERING DESIGN PLAN FOR
CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION
STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES -
CONSTRUCTION OF FLOOD CONTROL PROJECT, BRGY. CAUBIAN OLANGO
ISLAND, LAPU-LAPU, CEBU
LOCATION: LAPU-LAPU CITY, CEBU
STA. 0+000.00 TO STA. 0+058.20

NET LENGTH : 58.2 L.M.

SUBMITTED: RECOMMENDED: APPROVED:

ALEXIS MAY M. DY WILMA B. CAMPOS DAISY B. TOLEDO, D.M., ASEAN Eng.


CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
DATE DATE DATE
LUZON

THIS SITE
REGION VII

VISAYAS

MINDANAO

BEGINNING OF PROJECT
STA. 0+000.00 PHILIPPINES
KEY MAP
THIS SITE
END OF PROJECT CEBU 6th DISTRICT MADRIDEJOS
MALAPASCUA ISLAND

STA. 0+058.20 DAANBANTAYAN

BANTAYAN

SANTA FE
MEDELLIN

SAN REMEGIO
BOGO

TABOGON

TABUELAN
BORBON PILAR

TUBURAN

SAN FRANCISCO

TUDELA
PORO
ASTURIAS
CARMEN

BALAMBAN DANAO CITY

COMPOSTELA

TOLEDO CITY CEBU CEBU CITY


LILOAN

CONSOLACION
MANDAUE CITY

LAPU-LAPU CITY
PINAMUNGAJAN
CORDOVA
TALISAY CITY
ALOGUINSAN MINGLANILLA
NAGA

BARILI SAN FERNANDO

CARCAR
DUMANJUG
SIBONGA
RONDA

N ALCANTARA
MOALBOAL

BADIAN ARGAO Bohol


DALAGUETE
ALEGRIA

N
ALCOY

E
MALABUYOC
BOLJOON

E
GINATILAN

W SAMBOAN OSLOB

SW

SE
SANTANDER

Siquijor
S
REGION VII MAP
L O C A T I O N P L A N
LOCATION MAP
NOT DRAWN TO SCALE

I N D E X O F S H E E T S THIS SITE
LAPU-LAPU CITY
SHEET NO. SHEET CONTENTS
PROJECT LENGTH DATA
1 COVER SHEET/ TITLE SHEET
SECTION STATION LENGTH KEY MAP, VICINITY MAP, LOCATION MAP, LOCATION PLAN, INDEX OF SHEETS, SANTA
MARIA
MEPZA 1
IBO

2 LOCATION DATA AND LOCATION COORDINATES PUSOK PUNTA


ENGANO

BOTH SIDES STA. 0+000.00 - STA. 0+058.20 58.2 l.m BUAYA

3 LEGEND & ABBREVIATIONS MACTAN NATIONAL AIRPORT


BANKAL MACTAN

PAJAC

4 SUMMARY OF QUANTITIES & GENERAL NOTES BASAK


MARIBAGO
BARING
TINGO

TALIMA
AGUS

TOTAL
CAW-OY

58.20 l.m 5 TECHNICAL SPECIFICATIONS MARIGONDON

TYPICAL CROSS SECTION, SCHEDULE FOR TEMPORARY ACCESS ROAD,


SANTA ROSA
TUNGAAN
SUBABASBAS

6 FACE WALL AND STONE MASONRY DETAIL SAN VICENTE

SABANG

LOCATION COORDINATES PROJECT BILLBOARD


7
SECTION START END
8 PLAN AND PROFILE PANGAN-AN ISLAND

LAT 10.276700 10.27652 9-10 DETAILED CROSS SECTIONS GILUTUNGAN ISLAND

KAOHAGAN ISLAND

1
LONG 124.170758 124.170308
NALUSUAN ISLAND RESORT

VICINITY MAP
PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES


CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS MITIGATION STRUCTURES PROTECTING PUBLIC
REGIONAL OFFICE VII INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD KEY MAP, VICINITY MAP, LOCATION MAP, LOCATION PLAN, 2
CONTROL PROJECT, BRGY. CAUBIAN, OLANGO ISLAND, INDEX OF SHEETS, LOCATION DATA AND LOCATION
CEBU 6TH DISTRICT ENGINEERING OFFICE LAPU-LAPU CITY, CEBU
RYAN JOSEPH P. SINGCULAN ESTHER VALERIE O. LONDITE ALEXIS MAY M. DY WILMA B. CAMPOS DAISY B. TOLEDO, D.M., ASEAN Eng.
A.C. CORTES AVENUE, MANDAUE CITY, CEBU COORDINATES ENGINEERING ASSISTANT ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 10

DATE: DATE: DATE: DATE: DATE:


L E G E N D
EXISTING TOPOGRAPHIC FEATURES NEW TOPOGRAPHIC FEATURES
TREES / BANANAS / BAMBOO /
CONTOUR PROJECT ROAD GRID COORDINATES
N 413000
COCONUT 5 4
3
4 5
LAMP POST / CONCRETE / STEEL / WEP GATE N

S C LP BRIDGE NORTH SIGNS W E

WOODEN ELECTRICT POST FIRE HYDRANT FH


PLAN PROFILE S

TRANSVERSE CONTROL POINT KM CONCRETE / WOODEN / CH BH MATCH LINE MATCH LINE


BOX CULVERT
BENCH MARK AND KILOMETER POST BAMBOO / NIPA HOUSE WH NH
PLAN
PROFILE NORTH ARROW
SIGNBOARD WAITING SHED / STORE / WS MS
SB
PB SINGLE RC PIPE CULVERT FINISHED GRADE ON PROFILE g = 3.0
0%
PLANT BOX RADIATOR / MACHINE SHOP ST RS
PLAN PROFILE

WS WAITING SHED CONCRETE / CYCLONE / BAMBOO


STRUCTURES DOUBLE RC PIPE CULVERT ELEVATION TARGET
WS WOODEN HOUSE BARBED WIRE / WOODEN FENCE PLAN PROFILE
LEFT
RICE FIELD / GARDEN GUARDRAIL EMBANKMENT GUADRAIL ON PROFILE BOTH
RIGHT

BOREHOLE BH ROAD EXCAVATION SECTION IN WATER

WELL,WATER TANK F FAUCET WF WELL RETAINING WALL


BRIDGE SECTION IN EARTH
WATER FAUCET W WELL WATER TANK
PLAN PROFILE
(MASONRY)
RETAINING WALL
WATER FLOW DIRECTION BOX CULVERT BORE HOLE, BH BH
PLAN
PROFILE (CONCRETE)

RIVER BANK SINGLE RC PIPE CULVERT PARAPET WALL GPS STATION GPS
PLAN PROFILE

RIVER / CREEK DOUBLE RC PIPE CULVERT GUARD RAIL ON PLAN TEST PIT TP
PLAN PROFILE

SHORE LINE ORIGINAL GROUND TRANSVERSE DIRECTION OF FLOW POINT ON TANGENT


LEFT
CANAL BENCH MARK DITCH FLOW ON PLAN DITCH FLOW ON PROFILE RIGHT
BOTH
WATER LINE BOREHOLE POINT OF INTERSECTION ON PLAN POINT OF VERTICAL INTERSECTION
KM
0000
BRIDGE POST BOREHOLE SECTION TARGET NEW KM. POST

A B B R E V I A T I O N S
AZIM. AZIMUTH DIST. DISTANCE LT LEFT SIDE PVI POINT OF VERTICAL INTERSECTION SHLDR SHOULDER

AH.Sta. AHEAD STATION E EXTERNAL DISTANCE MIN MINIMUM PVC POINT OF VERTICAL CURVE TP TEST PIT

APP APPROACH e RATE OF SUPERELEVATION MFL MAXIMUM FLOOD LEVEL PVT POINT OF VERTICAL TANGENCY T TANGENT

AC ASPHALT CONCRETE ELEV./EL. ELEVATION MAX MAXIMUM PCCP PORTLAND CEMENT CONCRETE PAVEMENT V DESIGN SPEED

AVE. AVERAGE ECC END OF CIRCULAR CURVE MO MIDDLE ORDINAT POT POINT OF TANGENT W WIDENNING

HW HEAD WALL m METER w WIDTH


BS BOTHSIDES R RADIUS

BK. Sta. BACK STATION HFL HIGH FLOOD LEVEL mm MILLIMETER RCBC REINFORCED CONCRETE BOX CULVERT

BCC BEGINNING OF CIRCULAR CURVE IE INLET ELEVATION NC NORMAL CROSSFALL RCDG REINFORCED CONCRETE DECK GIRDER

BM BENCH MARK K RATE OF VERTICAL CURVATURE NTS NOT TO SCALE RCPC REINFORCED CONCRETE PIPE CULVERT

CB CATCH BASIN KM KILOMETER OWL ORDINARY WATER LEVEL R-O-W RIGHT OF WAY

RDWY ROADWAY
CL CENTER LINE Lc LENGTH OF CURVE PI POINT OF INTERSECTION

DPWH DEPARTMENT OF PUBLIC WORKS LVC LENGTH OF VERTICAL CURVE RP REFERENCE POINT RT RIGHT SIDE
AND HIGHWAYS

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES


CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS MITIGATION STRUCTURES PROTECTING PUBLIC
REGIONAL OFFICE VII INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD 3
CONTROL PROJECT, BRGY. CAUBIAN, OLANGO ISLAND, LEGEND & ABBREVIATIONS
CEBU 6TH DISTRICT ENGINEERING OFFICE LAPU-LAPU CITY, CEBU
RYAN JOSEPH P. SINGCULAN ESTHER VALERIE O. LONDITE ALEXIS MAY M. DY WILMA B. CAMPOS DAISY B. TOLEDO, D.M., ASEAN Eng.
A.C. CORTES AVENUE, MANDAUE CITY, CEBU ENGINEERING ASSISTANT ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 10

DATE: DATE: DATE: DATE: DATE:


GENERAL NOTES
1. DESIGN CRITERIA
12. DESIGN DATA/REFERENCES
ALL WORKS SHALL COMPLY WITH THE FOLLOWING:
FIELD DATA OF THIS PROJECT IS BASED IN ACTUAL SURVEY CONDUCTED ON JANUARY 18,2023 BY THE SURVEY TEAM
- DPWH DESIGN GUIDELINES, CRITERIA AND STANDARDS (DGCS), VOLUME 3, WATER ENGINEERING, 2015 EDITION TH
- DPWH STANDARD SPECIFICATIONS FOR HIGHWAYS, BRIDGES AND AIRPORT - VOL II, 2013 Edition OF DPWH CEBU 6 DISTRICT ENGINEERING OFFICE
- DPWH STANDARD SPECIFICATIONS FOR PUBLIC WORKS STRUCTURES (BUILDINGS, PORTS AND HARBORS, FLOOD CONTROL
AND DRAINAGE STRUCTURES ANS WATER SUPPLY SYSTEM) VOL. III, 2019 Edition
BENCHMARK
2. PROJECT CONTROLS AND REFERENCES
HORIZONTAL CONTROLS FOR THE PROJECT CORRESPONDING ELEVATIONS AND DESCRIPTION ARE SHOWN ON THE PLANS. POINT NO. NORTHING EASTING ELEVATION REMARKS
VERTICAL CONTROLS FOR THE PROJECT WITH CORRESPONDING ELEVATIONS AND DESCRIPTION ARE AS SHOWN ON THE
SAME DRAWINGS. 1 1136700.38 627976.77 -8.19 BM1
3. DIMENSIONS
UNLESS OTHERWISE SPECIFIED, DIMENSIONS ARE EXPRESSED IN MILLIMETER WHILE DISTANCE AND ELEVATION ARE IN
EQUIPMENT USED: GNSS EQUIPMENT - HUACE NAV GPS CHCX91
TERMS IN METERS.
DATE OF CALIBRATION : JULY 6, 2022
4. STATIONING
STATIONING IS RECKONED FROM THE BEGINNING OF THE PROJECT.
5. ELEVATION AND GRADES
ELEVATIONS AND FINISHED GRADES AS DESCRIBED IN THE ROADS PROFILES ARE RECKONED ALONG THE CENTERLINE.
6. HORIZONTAL TRANSITIONS
HORIZONTAL TRANSITIONS FOR ROADWAY TAMPERING/WIDENING SHALL BE APPLIED AS SHOWN ON THE PLANS.
7. REMOVAL OF EXISTING STRUCTURES AND OBSTRUCTION
ROAD CONNECTING SHALL BE CONSTRUCTED BY THE CONTRACTOR AS SHOWN ON THE PLANS OR AS DIRECTED BY THE
ENGINEERS IN SUCH A MANNER AS TO INSURE PROPER CONNECTION AND RIDING QUALITY.
PORTIONS OF EXISTING UTILITIES SUCH AS POWER LINES, WATER MAINS, TELEPHONE TRUNK LINES, ETC. THAT MAY
OBSTRUCT THE CONSTRUCTION OF THIS PROJECT, SHALL BE RELOCATED BY THE ENTITY OR OWNERS CONCERNED NOT TO
SUMMARY OF QUANTITIES
DAMAGED THEREOF SHALL BE ON THE ACCOUNT OF THE CONTRACTOR. ANY DAMAGE THEREOF SHALL BE ON THE ACCOUNT
OF THE CONTRACTOR. Item No. Description Unit Quantities Remarks
RELOCATION OF ANY GROUND UTILITY STRUCTURES SHALL BE SUCH THAT IT WILL NOT CAUSE OBSTRUCTION NOR
A.1.1 (8) Provision of Field Office for the Engineer (Rental Basis) mo. 5.43
CONFLICT TO VEHICULAR AND PEDESTRIAN TRAFFIC MOVEMENT.
8. ROAD CONNECTIONS AND PRIVATE ENTRANCES Project Billboard / Signboard
B.5 each 1.00
AFFECTED OWNERS WILL BE GIVEN PRIORITY TO TAKE ACTION IN THE REMOVAL OF THEIR HOUSES, FENCES ELECTRICAL
POLES AND OTHER PUBLIC UTILITIES. B.7(2) Occupational Safety and Health Program l.s. 1.00
9. MISCELLANEOUS STRUCTURE
B.9 Mobilization / Demobilization l.s. 1.00
PROVISIONS OF BATAS PAMBANSA BILLANG 344 (ACCESSIBILITY LAW AND ITS IMPLEMENTING RULES AND REGULATIONS)
MUST BE OBSERVED WHENEVER NECESSARY. 404(1)a Reinforcing Steel, Grade 40 kg. 1,568.37 Details in page 6
10. STANDARD DRAWINGS
THE NECESSARY DRAWING CONTAINED IN THE DPWH STANDARD DRAWINGS FOR ROADS AND BRIDGES SHALL BE UTILIZED
405(1)b3 Structural Concrete, 27.58MPa, Class A, 28 days Curing cu.m. 67.98 Details in page 6
FOR THE PROJECT UNLESS OTHERWISE A MORE DETAILED DRAWING IS SPECIFIED AND OR PROVIDED AND APPROVED.
407(8) Lean Concrete, Class B (16.5 Mpa) cu.m. 56.22 Details in page 6
11. AS-STAKED DRAWINGS
AS-STAKED PLAN SHALL BE PREPARED BY THE WINING CONTRACTOR BASED ON THE PRE-CONSTRUCTION SURVEY JOINTLY
Found in Typical Cross
CONDUCTED BY THE CONTRACTOR, IMPLEMENTING OFFICE AND CONSTRUCTION SUPERVISION CONSULTANTS (CSC) IF THE
Section (page 6) and
PROJECT CALLS FOR CONSULTANCY SERVICES/CONTRACTS 1027(1) Cement Plaster Finish sq.m. 965.07
detailed Cross Section
“AS-STAKED PLAN” SHALL BE NEW SET OF PLANS DEPICTING THE ACTUAL FIELD REQUIREMENT IN ADDITION, STANDARD (pages 9-10)
DRAWINGS (EG. DESIGN PARAMETERS OF ROAD GEOMETRIC DESIGN FOR HORIZONTAL AND VERTICAL CURVES) AND OTHER
DRAWINGS OF ROAD GEOMETRIC DESIGN FOR HORIZONTAL AND VERTICAL CURVES) AND OTHER DRAWINGS WITHOUT
CHANGES NEED NOT TO BE REDRAWN IN THE PREPARATION OF AS-STAKED PLAN. A COPY OF APPROVED ORIGINAL DESIGN
Found in Detailed cross
1702(1)c Structure Excavation, Hard Rock cu.m. 513.55
PLAN SHALL BE INCLUDED IN THE SUBMISSION OF THE “AS-STAKED PLAN” TO FACILITATE REVIEW, EVALUATION AND
Section (pages 9-10)
APPROVAL OF LATTER.
Found in Detailed cross
1711(1) Stone Masonry cu.m. 1,931.66
“AS-STAKED PLAN “SHALL BE REVIEWED BY THE CHIEF OF PLANNING AND DESIGN SECTION. Section (pages 9-10)

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES


CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS MITIGATION STRUCTURES PROTECTING PUBLIC
REGIONAL OFFICE VII INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD 4
CEBU 6TH DISTRICT ENGINEERING OFFICE CONTROL PROJECT, BRGY. CAUBIAN, OLANGO ISLAND, SUMMARY OF QUANTITIES & GENERAL NOTES RYAN JOSEPH P. SINGCULAN ESTHER VALERIE O. LONDITE ALEXIS MAY M. DY WILMA B. CAMPOS DAISY B. TOLEDO, D.M., ASEAN Eng.
A.C. CORTES AVENUE, MANDAUE CITY, CEBU
LAPU-LAPU CITY, CEBU 10
ENGINEERING ASSISTANT ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER

DATE: DATE: DATE: DATE: DATE:


TECHNICAL SPECIFICATIONS
TECHNICAL SPECIFICATION AND CONSTRUCTION ITEM 506 - STONE MASONRY 506.3 CONSTRUCTION REQUIREMENT 506.3.7 WEEPHOLES
REQUIREMENTS ARE BASED ON DPWH STANDARD
THIS ITEM CONSIST OF STONE MASONRY IN MINOR STRUCTURES, IN 506.3.1 SELECTION AND PLACING IT SHALL CONFORM TO THE REQUIREMENTS OF ITEM 505, RIPRAP AND
SPECIFICATIONS FOR HIGHWAYS, BRIDGES, AND AIRPORTS,
HEADWALLS FOR CULVERTS, IN RETAINING WALLS AT THE TOES OF SLOPES, AND GROUTED RIPRAP UNDER SUBSECTION 505.3.4, WEEPHOLES
2013 EDITION WHEN THE MASONRY IS TO BE PLACED ON A PREPARED FOUNDATION BED,
AT OTHER PLACES CALLED FOR ON THE PLANS, CONSTRUCTED ON THE
THE BED SHALL BE FIRM AND NORMAL TO, OR IN STEPS NORMAL TO, THE FACE OF 505.3.4 WEEPHOLES
ITEM A.1.1(6) - PROVISION OF COMBINED FIELD OFFICE, LABORATORY PREPARED FOUNDATION BED, IN ACCORDANCE WITH THIS SPECIFICATION AND
THE WALL, AND SHALL HAVE BEEN APPROVED BY THE ENGINEER BEFORE ANY
AND LIVING QUARTERS FOR THE ENGINEER (RENTAL BASIS) IN CONFORMITY WITH THE LINES, GRADES, SECTIONS, AND DIMENSIONS ALL WALLS OF THE ABUTMENTS SHALL BE PROVIDED WEEPHOLES. UNLESS
STONE IS PLACED.
SHOWN ON THE PLANS OR AS ORDERED IN WRITING BY THE ENGINEER. OTHERWISE SHOWN ON THE PLANS OR AS DIRECTED BY THE ENGINEER, THE
THE CONTRACTOR SHALL PROVIDE AND MAINTAIN FIELD OFFICE CARE SHALL BE TAKEN TO PREVENT THE BUNCHING OF SMALL STONE OR WEEPHOLES SHALL BE PLACED HORIZONTALLY AT THE LOWEST POINTS WHERE
506.2 MATERIAL REQUIREMENTS
AND TESTING LABORATORY INCLUDING NECESSARY ELECTRICITY, STONES OF THE SAME SIZE. LARGE STONES SHALL BE USED IN THE CORNERS. FREE OUTLETS FOR WATER CAN BE OBTAINED AND SHALL BE SPACED AT NOT MORE
WATER FOR THE USE OF THE ENGINEERS AND HIS STAFF (BOTH THE 506.2.1 STONE THAN 2 M CENTER TO CENTER IN A STAGGERED MANNER. THE LENGTH OF THE
ALL STONES SHALL BE CLEANED THOROUGHLY AND WETTED IMMEDIATELY
GOVERNMENT SIDE AND THE CONTRACTOR SIDE) WEEPHOLES SHALL NOT BE LESS THAN THE THICKNESS OF THE WALLS OF THE
THE STONE SHALL BE CLEAN, HARD, AND DURABLE AND SHALL BE BEFORE BEING SET, AND THE BED WHICH IS TO RECEIVE THEM SHALL BE CLEANED
ABUTMENT AND SHALL BE AT LEAST 50 MM DIAMETER PVC OR OTHER PIPE
SUBJECT TO THE ENGINEER'S APPROVAL. ADOBE STONE SHALL NOT BE USED AND MOISTENED BEFORE THE MORTAR IS SPREAD. THEY SHALL BE LAID WITH THEIR
ITEM B.5 - PROJECT BILLBOARD MATERIALS ACCEPTED BY THE ENGINEER. WEEPHOLES MUST BE PROVIDED WITH
UNLESS OTHERWISE SPECIFIED. LONGEST FACES HORIZONTAL IN FULL BEDS OF MORTAR, AND THE JOINTS SHALL BE
FILTER BAGS AS SPECIFIED IN SPECIAL PROVISION OR AS DIRECTED BY THE
FLUSHED WITH MORTAR.
THIS ITEM IS TO COMPLY WITH THE REQUIREMENT ISSUED BY SIZES AND SHAPES - UNLESS OTHER SIZES ARE SHOWN ON THE PLANS, ENGINEER, AND SHALL BE INCIDENTAL TO PAY ITEM 506.
THE DEPARTMENT AND THE COMMISSION ON AUDIT. STONES SHALL HAVE A THICKNESS OF NOT LESS THAN 150 MM, AND WIDTHS OF 506.3.2 BED AND JOINTS
506.3.8 CLEANING EXPOSED FACES
NOT LESS THAN ONE AND ONE-HALF TIMES THEIR RESPECTIVE THICKNESS, AND
ITEM B.7(2) OCCUPATIONAL SAFETY AND HEALTH PROGRAM BEDS FOR FACE STONES MAY VARY FROM 20 MM TO 50 MM IN THICKNESS.
LENGTHS OF NOT LESS THAN ONE AND ONE HALF TIMES THEIR RESPECTIVE IMMEDIATELY AFTER BEING LAID, AND WHILE THE MORTAR IS FRESH, ALL
THEY SHALL NOT EXTEND IN AN UNBROKEN LINE THROUGH MORE THAN 5 STONES.
WIDTHS. EACH STONE SHALL BE OF GOOD SHAPE AND BE FREE OF DEPRESSIONS FACE STONES SHALL BE THOROUGHLY CLEANED OF MORTAR STAINS AND SHALL BE
THE CONTRACTOR HAS TO COMPLY WITH THE PROVISION OF JOINTS MAY VARY FROM 20 MM TO 50 MM IN THICKNESS. THEY SHALL NOT EXTEND
AND PROJECTIONS THAT MIGHT WEAKEN OR PREVENT IT FROM BEING KEPT CLEAN UNTIL THE WORK IS COMPLETED.
SAFETY AND HEALTH PROGRAM AND THE IN AN UNBROKEN LINE THROUGH MORE THAN TWO STONES. THEY MAY BE AT
PROPERLY BEDDED. 0 0
REQUIREMENT OF THE CONSTRUCTION SAFETY PROTOCOLS. ANGLES WITH THE VERTICAL FROM 0 TO 45 . FACE STONE SHALL BOND AT LEAST 506.3.9 CURING
DRESSING - THE STONE SHALL BE DRESSED TO REMOVE ANY THIN OR 150 MM LONGITUDINALLY AND 50 MM VERTICALLY. AT NO PLACE SHALL CORNERS
IN HOT OR DRY WEATHER, THE MASONRY SHALL BE SATISFACTORY
ITEM B.9 MOBILIZATION / DEMOBILIZATION WEAK PORTIONS. FACE STONES SHALL BE DRESSED TO PROVIDE BED AND JOINT OF FOUR STONES BE ADJACENT TO EACH OTHER.
PROTECTED FROM THE SUN AND SHALL BE KEPT WET FOR A PERIOD OF AT LEAST
LINES THAT DO NOT VARY MORE THAN 20 MM FROM THE TRUE LINES AND TO
CROSS BEDS FOR VERTICAL FACED WALLS SHALL BE LEVEL, AND FOR THREE DAYS AFTER COMPLETION.
THE MOBILIZATION OF THE CONTRACTORS EQUIPMENT AND ENSURE THE MEETING OF BED AND JOINT LINES WITHOUT THE ROUNDING OF
MATERIALS ARE TAKEN INTO CONSIDERATION AS PROVIDED FOR BATTERED WALLS MAY VARY FROM LEVEL TO NORMAL TO THE BATTER LINE OF THE
CORNERS OF THE STONES IN EXCESS OF 30 MM IN RADIUS. BED SURFACES OF
IN THE CONTRACT BUT NOT TO EXCEED 10% OF THE ESTIMATED FACE OF THE WALL.
THE FACE STONES FOR ABOUT 80 MM AND FROM THIS POINT MAY DEPART
DIRECT COST FOR THE CONTRACT. FROM A NORMAL PLANE NOT TO EXCEED 50 MM IN 300 MM. 506.3.3 HEADERS
FINISH FOR EXPOSED FACES - FACE STONES SHALL BE PITCHED TO THE HEADERS SHALL BE DISTRIBUTED UNIFORMLY THROUGHOUT THE WALLS OF
LINE ALONG THE BEDS AND JOINTS. THE MAXIMUM PROJECTION OF ROCK THE STRUCTURES SO AS TO FORM AT LEAST ONE-FIFTH OF THE EXPOSED FACES.
FACES BEYOND THE PITCH LINES SHALL NOT BE MORE THAN 50 MM. THEY SHALL BE OF SUCH LENGTHS AS TO EXTEND FROM THE FRONT FACE OF THE
WALL INTO THE BACKING OF AT LEAST 300 MM. WHEN A WALL IS 450 MM OR LESS
506.2.2 MORTAR
IN THICKNESS, THE HEADERS SHALL EXTEND ENTIRELY FROM FRONT TO BACK FACE.
CEMENT, FINE AGGREGATE, AND WATER SHALL CONFORM TO THE
506.3.4 BACKING
RESPECTIVE REQUIREMENTS FOR THOSE MATERIALS AS SPECIFIED UNDER ITEM
405, STRUCTURAL CONCRETE, EXCEPT AS TO THE GRADING OF FINE AGGREGATE BACKING SHALL BE BUILT MOSTLY OF LARGE STONES AS SHOWN IN THE
WHICH SHALL ALL PASS THE 2.36 MM (NO. 8) SIEVE, NOT LESS THAN 15 NOR APPROVED PLANS OR AS DIRECTED BY THE ENGINEER. THE INDIVIDUAL STONES
MORE THAN 40 PERCENT SHALL PASS THE 0.3 MM (NO. 50) SIEVE, AND NOT COMPOSING THE BACKING AND HEARTING SHALL BE WELL BONDED WITH THE
MORE THAN 10 PERCENT SHALL PASS THE 0.15 MM (NO. 100) SIEVE. STONES IN THE FACE WALL AND WITH EACH OTHER. ALL OPENINGS AND
INTERSTICES IN THE BACKING SHALL BE FILLED COMPLETELY WITH MORTAR OR
THE MORTAR FOR THE MASONRY SHALL BE COMPOSED OF ONE PART WITH SPALLS SURROUNDED COMPLETELY BY MORTAR.
OF PORTLAND CEMENT AND TWO PARTS OF FINE AGGREGATE BY VOLUME AND
SUFFICIENT WATER TO MAKE THE MORTAR OF SUCH CONSISTENCY THAT IT CAN 506.3.5 POINTING
BE HANDED EASILY AND SPREAD WITH A TROWEL. MORTAR SHALL BE MIXED BOTH BED AND VERTICAL JOINTS SHALL BE FINISHED AS SHOWN ON THE
ONLY THOSE QUANTITIES REQUIRED FOR IMMEDIATE USE. UNLESS AN PLANS OR AS DIRECTED BY THE ENGINEER. THE MORTAR IN JOINTS ON TOP OF
APPROVED MORTAR MIXING MACHINE IS USED, THE FINE AGGREGATE AND SURFACE OF MASONRY SHALL BE CROWNED SLIGHTLY AT THE CENTER OF THE HYDRAULIC DESIGN DATA
CEMENT SHALL BE MIXED DRY IN A TIGHT BOX UNTIL THE MIXTURE ASSUMES A MASONRY TO PROVIDE DRAINAGE.
UNIFORM COLOR, AFTER WHICH, WATER SHALL BE ADDED AS THE MIXING 1. THE TOTAL DELINEATED DRAINAGE AREA IS ABOUT 21.49 km².
CONTINUES UNTIL THE MORTAR ATTAINS THE PROPER CONSISTENCY. MORTAR 506.3.6 COPING
2. THE HYDRAULIC ANALYSIS IS BASED ON DESIGN RETURN PERIOD
THAT IS NOT USED WITHIN 90 MINUTES AFTER THE WATER HAS BEEN ADDED COPINGS, IF CALLED FOR, SHALL BE FINISHED AS SHOWN ON THE PLANS. OF 50 YEARS WITH SUFFICIENT FREEBOARD TO CONTAIN 100-YEAR
SHALL BE DISCARDED. RETEMPERING OF MORTAR WILL NOT BE PERMITTED. WHERE COPINGS ARE NOT CALLED FOR, THE TOP OF THE WALL SHALL BE FINISHED FLOOD.
WITH STONES WIDE ENOUGH TO COVER THE TOP OF THE WALL FROM 450 MM TO
1000 MM IN LENGTH, AND OF RANDOM HEIGHTS, WITH A MINIMUM HEIGHT OF 3. THE DESIGN DISCHARGE CONSIDERED IN THE ANALYSIS IS 27.60
m³/s BASED ON THE ABOVE DESIGN FLOOD FREQUENCY.
150 MM. STONE SHALL BE LAID IN SUCH A MANNER THAT THE TOP COURSE IS AN
INTEGRAL PART OF THE WALL. THE TOPS OF TOP COURSE OF STONE SHALL BE 4. THE ROUGHNESS COEFFICIENT VALUES ADOPTED ARE 0.03 AND
PITCHED TO LINE, IN BOTH VERTICAL AND HORIZONTAL PLANES. 0.03 FOR THE RIVERBANK AND RIVERBED, RESPECTIVELY

5. MEAN VELOCITY IS 2.36 m/s.

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES


CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS MITIGATION STRUCTURES PROTECTING PUBLIC
REGIONAL OFFICE VII INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD 5
CEBU 6TH DISTRICT ENGINEERING OFFICE CONTROL PROJECT, BRGY. CAUBIAN, OLANGO ISLAND, TECHNICAL SPECIFICATIONS RYAN JOSEPH P. SINGCULAN ESTHER VALERIE O. LONDITE ALEXIS MAY M. DY WILMA B. CAMPOS DAISY B. TOLEDO, D.M., ASEAN Eng.
A.C. CORTES AVENUE, MANDAUE CITY, CEBU
LAPU-LAPU CITY, CEBU 10
ENGINEERING ASSISTANT ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER

DATE: DATE: DATE: DATE: DATE:


16mm Ø REBARS @ 0.25m O.C.

0.15mm THK. SLAB W/ 12mm Ø


PROPOSED OF SEA WALL 12mm Ø LONGITUDINAL BARS 1.20 m @ 0.30m O.OC. , BOTHWAYS

0.30 m
0.60 m
16mm Ø 1.5m ANCHOR BAR W/ EMBEDMENT DEPTH OF 0.50m
SPACED @ 0.50 O.C TO BE DRILLED TO THE ARMOUR ROCK W/ 1.10 m
CONC. EPOXY(TO BE WELDED ON MAIN BARS) R0.65 m 0.15 m

CLASS "A" (1:2:4 MIXTURE) LEAN CONCRETE ITEM 1711: STONE MASONRY
UP TO THE TOP OF STONE MASONRY

: 2
1
3.00 m

:
1.50 m

1
EXISTING GROUND

0.50 m
0.50 m

ITEM 1702(1)c: STRUCTURE EXCAVATION, HARD ROCK

TYPICAL CROSS SECTION


SCALE 1:50

16mm Ø REBARS @ 0.25m O.C. 16mm Ø 1.5m ANCHOR BAR W/ EMBEDMENT


DEPTH OF 0.50m 0.5 m

12mm Ø LONGITUDINAL BARS SPACED @ 0.50 O.C TO BE DRILLED TO THE


ARMOUR ROCK W/
1.20 m 1.00 m CONC. EPOXY(TO BE WELDED ON MAIN 0.5 m
PROPOSED OF SEA WALL
BARS)

CLASS "A" (1:2:4


0.30 m
MIXTURE) CONCRETE
0.60 m UP TO THE TOP OF
ARMOUR ROCK
1.10 m 0.025m Ø HOLE
0.15 m
: 2
R0.65 m
1
CLASS "A" (1:2:4 MIXTURE) CONCRETE
UP TO THE TOP OF ARMOUR ROCK

: 2 DETAIL OF ANCHORAGE TO ARMOUR ROCK


1
SCALE 1:20

SECTION DETAIL OF WAVE DEFLECTOR


SCALE 1:20
PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES


CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS MITIGATION STRUCTURES PROTECTING PUBLIC
REGIONAL OFFICE VII INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD TYPICAL CROSS SECTION, SCHEDULE FOR 6
CEBU 6TH DISTRICT ENGINEERING OFFICE CONTROL PROJECT, BRGY. CAUBIAN, OLANGO ISLAND, TEMPORARY ACCESS ROAD, FACE WALL AND RYAN JOSEPH P. SINGCULAN ESTHER VALERIE O. LONDITE ALEXIS MAY M. DY WILMA B. CAMPOS DAISY B. TOLEDO, D.M., ASEAN Eng.
A.C. CORTES AVENUE, MANDAUE CITY, CEBU
LAPU-LAPU CITY, CEBU STONE MASONRY DETAIL 10
ENGINEERING ASSISTANT ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER

DATE: DATE: DATE: DATE: DATE:


For the information and guidance of the public about the on-going projects being undertaken by the Department and to
support the government's effort towards transparency by recognizing the taxpaying public's contribution towards
infrastructure development, the following changes as shown in the attached layout drawing in Annex "A" shall be onserved
by all concerned implementing offices in the preparation and installations of project billboards:
1. The billboard standard shall contain the statement "THIS IS WHERE YOUR TAXES GO" together with the logos of the
THIS IS WHERE YOUR TAXES GO Department of Public Works and Highways (DPWH), the Bureau of Internal Revenue (BIR) and the Department of Finance
(DOF) placed in the upper part of the billboard with the dimension as shown in the attached layout drawing. The said
statement shall be located on the upper part of the billboard with the font size of 60 mm.
NAME OF PROJECT
2. The name of the government agency and logos shall be printed on same white background of the billboard as shown on
LOCATION:
Annex "A".
NAME OF CONTRACTOR:
DATE STARTED: 3. The name of project and location shall be separated for clarity.
CONTRACT COMPLETION DATE: 4. The words "CONTRACTOR" and "IMPLEMENTING OFFICE/CONTRACT No" shall be changed to "NAME OF
CONTRACT COST: CONTRACTOR" and "IMPLEMENTING OFFICE", respectively.
IMPLEMENTING OFFICE: 5. The Contract No. and website of DPWH shall be placed at the lower right side.
SOURCES OF FUND: DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
Text 2920 or call (02) 165-02 for any concern on this project
www.dpwh.gov.ph

2400

DISPLAY AREA

1200
1200
2" X 2" HORIZONTAL 4"X8"X1/4" MARINE PLYWOOD
GOOD LUMBER

2" X 2" HORIZONTAL


GOOD LUMBER
2" X 3" VERTICAL 2" X 3" VERTICAL
GOOD LUMBER GOOD LUMBER
1000

1000
2" X 2" WOODEN
2" X 2" WOODEN STAKE
STAKE
GROUND LEVEL GROUND LEVEL

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES


CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS MITIGATION STRUCTURES PROTECTING PUBLIC
REGIONAL OFFICE VII INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD 7
CONTROL PROJECT, BRGY. CAUBIAN, OLANGO ISLAND, TRAFFIC CONTROL DEVICES AND PROJECT BILLBOARD
CEBU 6TH DISTRICT ENGINEERING OFFICE LAPU-LAPU CITY, CEBU
RYAN JOSEPH P. SINGCULAN ESTHER VALERIE O. LONDITE ALEXIS MAY M. DY WILMA B. CAMPOS DAISY B. TOLEDO, D.M., ASEAN Eng.
A.C. CORTES AVENUE, MANDAUE CITY, CEBU ENGINEERING ASSISTANT ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 10

DATE: DATE: DATE: DATE: DATE:


FLOOD CONTROL PLAN
S C A L E : 1 : 7 0 0

STA:0+020
STA:0+000

S
SE

NE

SW
ST
NW

W
:0
04 +
0
D = 0 km/h
BEGINNING OF PROJECT STA

SIGN SPEE
.00
STA. 0+000.00
:0+0

STA 0+000
58

DE

Y
6Y A
7 .1A W
81 0W IR
16 9.9 A-I1R TA
- T S
S
END OF PROJECT
STA. 0+229.50

NOTE:
THE QUANTITY HERE REFLECTED ARE NOT ABSOLUTE AND ARE SUBJECTED TO
INCREASE/DECREASE AS PER ACTUAL FIELD IMPLEMENTATION.

BENCHMARK
POINT NO. NORTHING EASTING ELEVATION REMARKS

1 1136700.38 627976.77 -8.19 BM1

TOP OF STRUCTURE P R O F I L E
BEGINNING OF PROJECT

P R O J E C T
SCALE HORIZONTAL 1:70
VERTICAL 1 : 7 0 0
N

-8.00
O

MFL
I

-9.00
T
A

-10.00
V

O F
E

-11.00
L

SEA FLOOR
E N D
E

-12.00

-13.00
STATION 0+000 0+020 0+040 0+058
-10.77

-11.05

-11.25

-11.25

EXISTING GROUND
ELEVATION
-8.42

-8.42

-8.42

-8.42

TOP OF STRUCTURE

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES


CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS MITIGATION STRUCTURES PROTECTING PUBLIC
REGIONAL OFFICE VII INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD 8
CONTROL PROJECT, BRGY. CAUBIAN, OLANGO ISLAND,
CEBU 6TH DISTRICT ENGINEERING OFFICE LAPU-LAPU CITY, CEBU
PLAN AND PROFILE RYAN JOSEPH P. SINGCULAN ESTHER VALERIE O. LONDITE ALEXIS MAY M. DY WILMA B. CAMPOS DAISY B. TOLEDO, D.M., ASEAN Eng.
A.C. CORTES AVENUE, MANDAUE CITY, CEBU ENGINEERING ASSISTANT ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 10

DATE: DATE: DATE: DATE: DATE:


0
DETAILED C R O S S0 SECTIONS
SCALE 1 : 1 0 0

-2 -2

ELEV: -7.17

ELEV: -7.17
-4 -4

OFF: 0.00

OFF: 0.00
ELEV: -7.52

ELEV: -7.52
OFF: -2.01

OFF: -2.01
ELEV: -9.52

ELEV: -9.52

ELEV: -9.52

ELEV: -9.52
OFF: -9.01

OFF: -9.01

OFF: -9.01

OFF: -9.01
-6 MATERIALS AT STA. 0+010.00 -6 MATERIALS AT STA. 0+030.00

Material Name Quantity Material Name Quantity

1027(1) 18.14 m 1027(1) 18.14 m

ELEV: -11.02

ELEV: -11.02
OFF: -10.51

OFF: -10.51
-8 1702(1)c -8 1702(1)c

1711(1) 1711(1)

OFF:0.00m
ELEV:-10.86
ELEV:-11.11
OFF:-6.32m L

OFF:0.00m
ELEV:-11.20
OFF:-15.00m L
ELEV:-11.44

-10 -10

OFF:-15.00m L
ELEV:-11.73
-12 -12

O.G.E = -10.86 m O.G.E = -11.20 m


-14 F.G.E = -10.86 m -14 F.G.E = -11.20 m

STA.0+010.00 STA.0+030.00
-16 -15 -10 -5 0 -16 -15 -10 -5 0

0 0

-2 -2
ELEV: -6.42

ELEV: -6.42
OFF: -2.20

OFF: -1.00

ELEV: -7.02

ELEV: -7.17
-4 -4
OFF: 0.00

OFF: 0.00
ELEV: -7.52
OFF: -2.01
ELEV: -9.52

ELEV: -9.52
OFF: -9.01

OFF: -9.01
-6 MATERIALS AT STA. 0+000.00 -6 MATERIALS AT STA. 0+020.00
ELEV: -9.52

ELEV: -9.52
OFF: -9.01

OFF: -6.01

Material Name Quantity Material Name Quantity

1027(1) 18.14 m 1027(1) 18.14 m

ELEV: -11.02

ELEV: -11.02
OFF: -10.51
-8 1702(1)c -8 1702(1)c

OFF: 0.00
1711(1) 1711(1)
OFF:0.00m
ELEV:-10.77

OFF:0.00m
ELEV:-11.05
OFF:-15.00m L
ELEV:-11.33

OFF:-15.00m L
ELEV:-11.59
-10 -10

-12 -12

O.G.E = -10.77 m O.G.E = -11.05 m


-14 F.G.E = -10.77 m -14 F.G.E = -11.05 m
BEGINNING OF PROJECT STA.0+000.00 STA.0+020.00
-16 -15 -10 -5 0 -16 -15 -10 -5 0

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES


CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS MITIGATION STRUCTURES PROTECTING PUBLIC
REGIONAL OFFICE VII INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD 9
CONTROL PROJECT, BRGY. CAUBIAN, OLANGO ISLAND, DETAILED CROSS SECTION
CEBU 6TH DISTRICT ENGINEERING OFFICE LAPU-LAPU CITY, CEBU
RYAN JOSEPH P. SINGCULAN ESTHER VALERIE O. LONDITE ALEXIS MAY M. DY WILMA B. CAMPOS DAISY B. TOLEDO, D.M., ASEAN Eng.
A.C. CORTES AVENUE, MANDAUE CITY, CEBU ENGINEERING ASSISTANT ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 10

DATE: DATE: DATE: DATE: DATE:


0
DETAILED CROSS SECTIONS
SCALE 1 : 1 0 0

-2

ELEV: -6.42

ELEV: -6.42
OFF: -2.20

OFF: -1.00

ELEV: -7.02
-4

OFF: 0.00
-6 MATERIALS AT STA. 0+050.00

ELEV: -9.52

ELEV: -9.52
OFF: -9.01

OFF: -6.01
Material Name Quantity

1027(1) 18.14 m

-8 1702(1)c

OFF:-9.77m L
ELEV:-10.97
1711(1)

OFF:0.00m
ELEV:-11.28
ELEV:-11.54
OFF:-15.00m L

-10

-12

O.G.E = -11.28 m
-14 F.G.E = -11.28 m

STA.0+050.00
-16 -15 -10 -5 0

0 0

-2 -2

ELEV: -6.42

ELEV: -6.42
OFF: -2.20

OFF: -1.00

ELEV: -7.02
ELEV: -7.17

-4 -4

OFF: 0.00
OFF: 0.00
ELEV: -7.52
OFF: -2.01
ELEV: -9.52

ELEV: -9.52
OFF: -9.01

OFF: -9.01

-6 MATERIALS AT STA. 0+040.00 -6 MATERIALS AT STA. 0+058.20

ELEV: -9.52

ELEV: -9.52
OFF: -9.01

OFF: -6.01
Material Name Quantity Material Name Quantity

OFF:-4.69m L
ELEV:-8.89
1027(1) 18.14 m 1027(1) 18.14 m
ELEV: -11.02

ELEV: -11.02
OFF: -10.51

-8 1702(1)c -8 1702(1)c
OFF: 0.00

OFF:-11.23m L
ELEV:-10.09
ELEV:-10.21
OFF:-15.00m L
1711(1) 1711(1)
ELEV:-11.12
OFF:3.93m R
OFF:0.00m

OFF:0.00m
ELEV:-11.25

ELEV:-11.25
OFF:-4.78m L
ELEV:-11.33
ELEV:-11.71
OFF:-15.00m L

-10 -10

-12 -12

O.G.E = -11.25 m O.G.E = -11.25 m


-14 F.G.E = -11.25 m -14 F.G.E = -11.25 m

STA.0+040.00 END OF PROJECT STA.0+058.20


-16 -15 -10 -5 0 -16 -15 -10 -5 0

PROJECT NAME AND LOCATION: SHEET CONTENTS: PREPARED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.

REPUBLIC OF THE PHILIPPINES


CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS MITIGATION STRUCTURES PROTECTING PUBLIC
REGIONAL OFFICE VII INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD 10
CONTROL PROJECT, BRGY. CAUBIAN, OLANGO ISLAND, DETAILED CROSS SECTION
CEBU 6TH DISTRICT ENGINEERING OFFICE LAPU-LAPU CITY, CEBU
RYAN JOSEPH P. SINGCULAN ESTHER VALERIE O. LONDITE ALEXIS MAY M. DY WILMA B. CAMPOS DAISY B. TOLEDO, D.M., ASEAN Eng.
A.C. CORTES AVENUE, MANDAUE CITY, CEBU ENGINEERING ASSISTANT ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER 10

DATE: DATE: DATE: DATE: DATE:

You might also like