Download as pdf or txt
Download as pdf or txt
You are on page 1of 48

Projeto Lumire

Sala Lumire
Date:
Customer:

02-06-2002
Revista Lumire

Designer:

Wilson Teixeira

Description:

Projeto para avaliao/demonstrao do


software CALCULUX INDOOR 4.5b

The nominal values shown in this report are the result of precision calculations, based upon precisely positioned luminaires in a fixed
relationship to each other and to the area under examination. In practice the values may vary due to tolerances on luminaires, luminaire
positioning, reflection properties and electrical supply.

W. Teixeira

Caixa Postal 24165


20522-970
Rio de Janeiro
BRAZIL
Telephone: (21) 2565-7847
Fax: (21) 2565-7847
E-Mail: wteixeira@globo.com

CalcuLuX Indoor 4.5b

Projeto Lumire
Sala Lumire

W. Teixeira
Date: 02-06-2002

Table of Contents

1.

Project Description

1.1
1.2
1.3
1.4
1.5
1.6

3-D Project Overview


Top Project Overview
Left Project Overview
Right Project Overview
Front Project Overview
Back Project Overview

4
5
6
7
8
9

2.

Summary

10

2.1
2.2
2.3

Room Summary
Project Luminaires
Calculation Results

10
10
10

3.

Calculation Results

11

3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
3.11
3.12
3.13
3.14
3.15
3.16
3.17
3.18
3.19
3.20
3.21
3.22
3.23
3.24
3.25
3.26
3.27
3.28
3.29
3.30
3.31
3.32
3.33
3.34
3.35

Grid: Textual Table


Grid: Graphical Table
Grid: Iso Contour
Grid: Filled Iso Contour
Grid: Mountain Plot
Mesa3: Textual Table
Mesa3: Graphical Table
Mesa3: Iso Contour
Mesa3: Filled Iso Contour
Mesa3: Mountain Plot
Mesa2: Textual Table
Mesa2: Graphical Table
Mesa2: Iso Contour
Mesa2: Filled Iso Contour
Mesa2: Mountain Plot
Mesa1: Textual Table
Mesa1: Graphical Table
Mesa1: Iso Contour
Mesa1: Filled Iso Contour
Mesa1: Mountain Plot
Mesa1a: Textual Table
Mesa1a: Graphical Table
Mesa1a: Iso Contour
Mesa1a: Filled Iso Contour
Mesa1a: Mountain Plot
Mesa1a1: Textual Table
Mesa1a1: Graphical Table
Mesa1a1: Iso Contour
Mesa1a1: Filled Iso Contour
Mesa1a1: Mountain Plot
Mesa1a2: Textual Table
Mesa1a2: Graphical Table
Mesa1a2: Iso Contour
Mesa1a2: Filled Iso Contour
Mesa1a2: Mountain Plot

11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45

4.

Luminaire Details

46

4.1

Project Luminaires

46

5.

Installation Data

47

5.1
5.2

Legends
Luminaire Positioning and Orientation

47
47

6.

Financial Information

48

CalcuLuX Indoor 4.5b

Philips Lighting B.V.

Page:

2/48

Projeto Lumire
Sala Lumire

6.1
6.2
6.3

CalcuLuX Indoor 4.5b

Installation Data
Luminaire Information
Total cost

W. Teixeira
Date: 02-06-2002

48
48
48

Philips Lighting B.V.

Page:

3/48

Projeto Lumire

W. Teixeira
Date: 02-06-2002

Sala Lumire

1. Project Description
1.1 3-D Project Overview

A
A

Z
Y
X

Fluorescente de embutir Refletor


branco

Width
6.00 m

Length
4.00 m

CalcuLuX Indoor 4.5b

Height
2.80 m

Working Plane Height


0.80 m
Philips Lighting B.V.

Page:

4/48

Projeto Lumire

W. Teixeira
Date: 02-06-2002

Sala Lumire

-2

-1

Y(m)

1.2 Top Project Overview

-0.5

0.5

1.5

2.5

3.5

4.5

5.5

X(m)

Fluorescente de embutir Refletor


branco

Width
6.00 m

Length
4.00 m

CalcuLuX Indoor 4.5b

Height
2.80 m

Scale
1:40

Working Plane Height


0.80 m
Philips Lighting B.V.

Page:

5/48

Projeto Lumire

W. Teixeira
Date: 02-06-2002

Sala Lumire

3.5

1.3 Left Project Overview

-1

-0.5

0.5

Z(m)

1.5

2.5

4.2

3.7

3.2

2.7

2.2

1.7

1.2

0.7

0.2

Y(m)

Fluorescente de embutir Refletor


branco

Width
6.00 m

Length
4.00 m

CalcuLuX Indoor 4.5b

Height
2.80 m

Scale
1:25

Working Plane Height


0.80 m
Philips Lighting B.V.

Page:

6/48

Projeto Lumire

W. Teixeira
Date: 02-06-2002

Sala Lumire

3.5

1.4 Right Project Overview

-1

-0.5

0.5

Z(m)

1.5

2.5

-0.2

0.3

0.8

1.3

1.8

2.3

2.8

3.3

3.8

Y(m)

Fluorescente de embutir Refletor


branco

Width
6.00 m

Length
4.00 m

CalcuLuX Indoor 4.5b

Height
2.80 m

Scale
1:25

Working Plane Height


0.80 m
Philips Lighting B.V.

Page:

7/48

Projeto Lumire

W. Teixeira
Date: 02-06-2002

Sala Lumire

3.5

4.5

1.5 Front Project Overview

1.5
-2.5

-1.5

-0.5

0.5

Z(m)

2.5

-0.5

0.5

1.5

2.5

3.5

4.5

5.5

X(m)

Fluorescente de embutir Refletor


branco

Width
6.00 m

Length
4.00 m

CalcuLuX Indoor 4.5b

Height
2.80 m

Scale
1:40

Working Plane Height


0.80 m
Philips Lighting B.V.

Page:

8/48

Projeto Lumire

W. Teixeira
Date: 02-06-2002

Sala Lumire

3.5

4.5

1.6 Back Project Overview

1.5
-2.5

-1.5

-0.5

0.5

Z(m)

2.5

6.5

5.5

4.5

3.5

2.5

1.5

0.5

X(m)

Fluorescente de embutir Refletor


branco

Width
6.00 m

Length
4.00 m

CalcuLuX Indoor 4.5b

Height
2.80 m

Scale
1:40

Working Plane Height


0.80 m
Philips Lighting B.V.

Page:

9/48

Projeto Lumire

W. Teixeira
Date: 02-06-2002

Sala Lumire

2. Summary
2.1 Room Summary
Room Dimensions
Width
Length
Height
Working Plane Height

6.00
4.00
2.80
0.80

m
m
m
m

Room Position (Front Bottom Left)


X
0.00
Y
0.00

m
m

Surface
Ceiling
Left Wall
Right Wall
Front Wall
Back Wall
Floor

Total Average Room Surface Luminance (cd/m2):


Ceiling
Left
Right
Front
30.7
52.8
52.8
51.3

Back
51.3

Reflectance
0.70
0.50
0.50
0.50
0.50
0.20

Floor
26.6

Unified Glare Rating (CIE): 21


The overall maintenance factor used for this project is 1.00.

2.2 Project Luminaires


Code
A

Qty Luminaire Type


Fluorescente de embutir Refletor
4
branco

Lamp Type
2 * Fluorescente 36W

Power (W)

Flux (lm)

64.0

2 * 2700

The total installed power: 0.26 (kWatt)


Number of Luminaires Per Arrangement:
Luminaire
Code
Arrangement
A
Room Block
4

Power (kWatt)
0.26

2.3 Calculation Results


(Il)luminance Calculations:
Type
Calculation
Surface Illuminance
Grid
Surface Illuminance
Mesa3
Surface Illuminance
Mesa2
Surface Illuminance
Mesa1
Surface Illuminance
Mesa1a
Surface Illuminance
Mesa1a1
Surface Illuminance
Mesa1a2

CalcuLuX Indoor 4.5b

Unit
lux
lux
lux
lux
lux
lux
lux

Ave Min/Ave Min/Max


0.59
0.69
519
0.70
0.80
467
0.90
0.92
594
0.89
0.91
593
0.60
0.75
431
0.76
0.86
494
0.66
0.78
479

Philips Lighting B.V.

Result
Total
Total
Total
Total
Total
Total
Total

Page:

10/48

Projeto Lumire

W. Teixeira
Date: 02-06-2002

Sala Lumire

3. Calculation Results
3.1 Grid: Textual Table
Grid
Calculation
Result Type

: Grid at Z = 0.80 m
: Surface Illuminance (lux)
: Total

X (m)
Y (m)
3.75

0.25

0.75

1.25

1.75

2.25

2.75

3.25

3.75

4.25

4.75

5.25

5.75

357<

413

460

481

479

470

470

479

481

460

413

357<

3.25

410

484

541

565

559

544

544

559

565

541

484

410

2.75

443

520

579

605

600

585

585

600

605

579

520

443

2.25

450

526

581

607>

607

595

595

607

607

581

526

450

1.75

450

526

581

607>

607

595

595

607

607>

581

526

450

1.25

443

520

579

605

600

585

585

600

605

579

520

443

0.75

410

484

541

565

559

544

544

559

565

541

484

410

0.25

357<

413

460

481

479

470

470

479

481

460

413

357<

Average
519
CalcuLuX Indoor 4.5b

Min/Ave
0.69

Min/Max
0.59

Project maintenance factor


1.00

Philips Lighting B.V.

Page:

11/48

Projeto Lumire

W. Teixeira
Date: 02-06-2002

Sala Lumire

3.2 Grid: Graphical Table


: Grid at Z = 0.80 m
: Surface Illuminance (lux)
: Total

4.5

5.5

Grid
Calculation
Result Type

413

460

481

479

470

470

479

481

460

413

357

410

484

541

565

559

544

544

559

565

541

484

410

443

520

579

605

600

585

585

600

605

579

520

443

450

526

581

607

607

595

595

607

607

581

526

450

450

526

581

607

607

595

595

607

607

581

526

450

443

520

579

605

600

585

585

600

605

579

520

443

410

484

541

565

559

544

544

559

565

541

484

410

357

413

460

481

479

470

470

479

481

460

413

357

3.5

357

1.5

Y(m)

2.5

-1.5

-0.5

0.5

-0.5

0.5

1.5

2.5

3.5

4.5

5.5

X(m)

Average
519
CalcuLuX Indoor 4.5b

Fluorescente de embutir Refletor


branco
Min/Ave
0.69

Min/Max
0.59

Project maintenance factor


1.00

Philips Lighting B.V.

Scale
1:40
Page:

12/48

Projeto Lumire

W. Teixeira
Date: 02-06-2002

Sala Lumire

3.3 Grid: Iso Contour


: Grid at Z = 0.80 m
: Surface Illuminance (lux)
: Total

4.5

5.5

Grid
Calculation
Result Type

450
500
0
40

3.5

00

550
A

600

50

1.5

450

550

Y(m)

500

450

2.5

60

550
0.5

0
40

500

0
40

-1.5

-0.5

450

-0.5

0.5

1.5

2.5

3.5

4.5

5.5

X(m)

Average
519
CalcuLuX Indoor 4.5b

Fluorescente de embutir Refletor


branco
Min/Ave
0.69

Min/Max
0.59

Project maintenance factor


1.00

Philips Lighting B.V.

Scale
1:40
Page:

13/48

Projeto Lumire

W. Teixeira
Date: 02-06-2002

Sala Lumire

3.4 Grid: Filled Iso Contour


Grid
Calculation
Result Type

: Grid at Z = 0.80 m
: Surface Illuminance (lux)
: Total

400

500

600

550

3.5

4.5

450

-0.5

0.5

1.5

Y(m)

2.5

-0.5

0.5

1.5

2.5

3.5

4.5

5.5

X(m)

Average
519
CalcuLuX Indoor 4.5b

Fluorescente de embutir Refletor


branco
Min/Ave
0.69

Min/Max
0.59

Project maintenance factor


1.00

Philips Lighting B.V.

Scale
1:40
Page:

14/48

Projeto Lumire

W. Teixeira
Date: 02-06-2002

Sala Lumire

3.5 Grid: Mountain Plot


Grid
Calculation
Result Type

: Grid at Z = 0.80 m
: Surface Illuminance (lux)
: Total

0
1
2

X(m
)

3
4

2
5

CalcuLuX Indoor 4.5b

Min/Ave
0.69

m)

1
6

Average
519

Y(

Min/Max
0.59

Project maintenance factor


1.00

Philips Lighting B.V.

Page:

15/48

Projeto Lumire

W. Teixeira
Date: 02-06-2002

Sala Lumire

3.6 Mesa3: Textual Table


Grid
Calculation
Result Type

: Mesa3 at Z = 0.80 m
: Surface Illuminance (lux)
: Total

X (m)
Y (m)
3.20

5.20

5.35

5.50

5.65

5.80

5.95

496

475

454

431

406

372<

3.04

512

491

469

445

420

385

2.87

522

500

478

455

430

396

2.70

528

507

484

460

436

401

2.54

532

510

488

464

439

404

2.37

532>

512

490

466

441

406

2.21

532

512

490

467

442

407

2.04

532

512

490

467

442

407

1.88

532

512

490

467

442

407

1.71

532

512

490

467

442

406

511

489

466

440

405

1.55

Average
467
CalcuLuX Indoor 4.5b

Min/Ave
0.80

Min/Max
0.70

Project maintenance factor


1.00

Philips Lighting B.V.

Page:

16/48

Projeto Lumire

W. Teixeira
Date: 02-06-2002

Sala Lumire

3.7 Mesa3: Graphical Table


: Mesa3 at Z = 0.80 m
: Surface Illuminance (lux)
: Total

3.5

4.5

5.5

Grid
Calculation
Result Type

496 475 454 431 406 372


512 491 469 445 420 385

522 500 478 455 430 396


528 507 484 460 436 401

2.5

532 510 488 464 439 404


532 512 490 466 441 406
532 512 490 467 442 407

Y(m)

532 512 490 467 442 407


532 512 490 467 442 407
532 512 490 467 442 406

1.5

511 489 466 440 405

-1.5

-0.5

0.5

-0.5

0.5

1.5

2.5

3.5

4.5

5.5

X(m)

Average
467
CalcuLuX Indoor 4.5b

Fluorescente de embutir Refletor


branco
Min/Ave
0.80

Min/Max
0.70

Project maintenance factor


1.00

Philips Lighting B.V.

Scale
1:40
Page:

17/48

Projeto Lumire

W. Teixeira
Date: 02-06-2002

Sala Lumire

3.8 Mesa3: Iso Contour


: Mesa3 at Z = 0.80 m
: Surface Illuminance (lux)
: Total

3.5

4.5

5.5

Grid
Calculation
Result Type

375

2.5

450

425

400

475

500

-1.5

-0.5

0.5

1.5

Y(m)

525

-0.5

0.5

1.5

2.5

3.5

4.5

5.5

X(m)

Average
467
CalcuLuX Indoor 4.5b

Fluorescente de embutir Refletor


branco
Min/Ave
0.80

Min/Max
0.70

Project maintenance factor


1.00

Philips Lighting B.V.

Scale
1:40
Page:

18/48

Projeto Lumire

W. Teixeira
Date: 02-06-2002

Sala Lumire

3.9 Mesa3: Filled Iso Contour


Grid
Calculation
Result Type

: Mesa3 at Z = 0.80 m
: Surface Illuminance (lux)
: Total

375

425

475

450

500

3.5

4.5

400

525

-0.5

0.5

1.5

Y(m)

2.5

-0.5

0.5

1.5

2.5

3.5

4.5

5.5

X(m)

Average
467
CalcuLuX Indoor 4.5b

Fluorescente de embutir Refletor


branco
Min/Ave
0.80

Min/Max
0.70

Project maintenance factor


1.00

Philips Lighting B.V.

Scale
1:40
Page:

19/48

Projeto Lumire

W. Teixeira
Date: 02-06-2002

Sala Lumire

3.10 Mesa3: Mountain Plot


Grid
Calculation
Result Type

: Mesa3 at Z = 0.80 m
: Surface Illuminance (lux)
: Total

3.2
3
2.8
2.6

2.4

5.2

2.2

5.4

X(m
)

Y(

m)

5.6

1.8

5.8

1.6

6
1.4

Average
467
CalcuLuX Indoor 4.5b

Min/Ave
0.80

Min/Max
0.70

Project maintenance factor


1.00

Philips Lighting B.V.

Page:

20/48

Projeto Lumire

W. Teixeira
Date: 02-06-2002

Sala Lumire

3.11 Mesa2: Textual Table


Grid
Calculation
Result Type

: Mesa2 at Z = 0.80 m
: Surface Illuminance (lux)
: Total

X (m)
Y (m)
3.20

3.20

3.35

3.50

3.65

3.80

3.95

550<

553

557

562

567

571

3.04

569

572

576

581

585

588

2.87

579

583

587

592

596

600

2.70

586

589

594

598

603

607

2.54

590

594

598

603

607

609

2.37

593

596

600

604

608

610

2.21

594

597

600

605

608

610

2.04

594

597

601

605

608

609

1.88

594

597

601

605

608

610

1.71

593

597

600

604

608

610>

595

599

604

608

610

1.55

Average
594
CalcuLuX Indoor 4.5b

Min/Ave
0.92

Min/Max
0.90

Project maintenance factor


1.00

Philips Lighting B.V.

Page:

21/48

Projeto Lumire

W. Teixeira
Date: 02-06-2002

Sala Lumire

3.12 Mesa2: Graphical Table


: Mesa2 at Z = 0.80 m
: Surface Illuminance (lux)
: Total

3.5

4.5

5.5

Grid
Calculation
Result Type

550 553 557 562 567 571


569 572 576 581 585 588

579 583 587 592 596 600

586 589 594 598 603 607

2.5

590 594 598 603 607 609


593 596 600 604 608 610
594 597 600 605 608 610

Y(m)

594 597 601 605 608 609


594 597 601 605 608 610
593 597 600 604 608 610

1.5

595 599 604 608 610

-1.5

-0.5

0.5

-0.5

0.5

1.5

2.5

3.5

4.5

5.5

X(m)

Average
594
CalcuLuX Indoor 4.5b

Fluorescente de embutir Refletor


branco
Min/Ave
0.92

Min/Max
0.90

Project maintenance factor


1.00

Philips Lighting B.V.

Scale
1:40
Page:

22/48

Projeto Lumire

W. Teixeira
Date: 02-06-2002

Sala Lumire

3.13 Mesa2: Iso Contour


: Mesa2 at Z = 0.80 m
: Surface Illuminance (lux)
: Total

3.5

4.5

5.5

Grid
Calculation
Result Type

560

570
580

1.5

610

Y(m)

600

2.5

0
59

-1.5

-0.5

0.5

-0.5

0.5

1.5

2.5

3.5

4.5

5.5

X(m)

Average
594
CalcuLuX Indoor 4.5b

Fluorescente de embutir Refletor


branco
Min/Ave
0.92

Min/Max
0.90

Project maintenance factor


1.00

Philips Lighting B.V.

Scale
1:40
Page:

23/48

Projeto Lumire

W. Teixeira
Date: 02-06-2002

Sala Lumire

3.14 Mesa2: Filled Iso Contour


Grid
Calculation
Result Type

: Mesa2 at Z = 0.80 m
: Surface Illuminance (lux)
: Total

550

570

590

580

600

3.5

4.5

560

610

-0.5

0.5

1.5

Y(m)

2.5

-0.5

0.5

1.5

2.5

3.5

4.5

5.5

X(m)

Average
594
CalcuLuX Indoor 4.5b

Fluorescente de embutir Refletor


branco
Min/Ave
0.92

Min/Max
0.90

Project maintenance factor


1.00

Philips Lighting B.V.

Scale
1:40
Page:

24/48

Projeto Lumire

W. Teixeira
Date: 02-06-2002

Sala Lumire

3.15 Mesa2: Mountain Plot


Grid
Calculation
Result Type

: Mesa2 at Z = 0.80 m
: Surface Illuminance (lux)
: Total

3.2
3
2.8
2.6

3
2.4

3.2

2.2

3.4

X(m
)

1.8
4

CalcuLuX Indoor 4.5b

m)

3.6
3.8

Average
594

Y(

Min/Ave
0.92

1.6
1.4

Min/Max
0.90

Project maintenance factor


1.00

Philips Lighting B.V.

Page:

25/48

Projeto Lumire

W. Teixeira
Date: 02-06-2002

Sala Lumire

3.16 Mesa1: Textual Table


Grid
Calculation
Result Type

: Mesa1 at Z = 0.80 m
: Surface Illuminance (lux)
: Total

X (m)
Y (m)
3.20

1.20

1.35

1.50

1.65

1.80

1.95

542<

556

565

570

572

572

3.04

559

572

582

587

590

589

2.87

570

583

593

599

600

601

2.70

575

591

601

606

606

608

2.54

577

593

603

608

608

610

2.37

577

592

602

607

608

610

2.21

575

590

601

606

606

610

2.04

574

589

600

605

605

608

1.88

575

590

600

605

606

609

1.71

576

591

601

607

607

610

592

602

608

608

610>

1.55

Average
593
CalcuLuX Indoor 4.5b

Min/Ave
0.91

Min/Max
0.89

Project maintenance factor


1.00

Philips Lighting B.V.

Page:

26/48

Projeto Lumire

W. Teixeira
Date: 02-06-2002

Sala Lumire

3.17 Mesa1: Graphical Table


: Mesa1 at Z = 0.80 m
: Surface Illuminance (lux)
: Total

3.5

4.5

5.5

Grid
Calculation
Result Type

542 556 565 570 572 572


559 572 582 587 590 589

570 583 593 599 600 601


575 591 601 606 606 608

2.5

577 593 603 608 608 610


577 592 602 607 608 610
575 590 601 606 606 610

Y(m)

574 589 600 605 605 608


575 590 600 605 606 609
576 591 601 607 607 610

1.5

592 602 608 608 610

-1.5

-0.5

0.5

-0.5

0.5

1.5

2.5

3.5

4.5

5.5

X(m)

Average
593
CalcuLuX Indoor 4.5b

Fluorescente de embutir Refletor


branco
Min/Ave
0.91

Min/Max
0.89

Project maintenance factor


1.00

Philips Lighting B.V.

Scale
1:40
Page:

27/48

Projeto Lumire

W. Teixeira
Date: 02-06-2002

Sala Lumire

3.18 Mesa1: Iso Contour


: Mesa1 at Z = 0.80 m
: Surface Illuminance (lux)
: Total

3.5

4.5

5.5

Grid
Calculation
Result Type

610

2.5

0
5 5 60
5
0
57

1.5

610

Y(m)

600

590

580

-1.5

-0.5

0.5

-0.5

0.5

1.5

2.5

3.5

4.5

5.5

X(m)

Average
593
CalcuLuX Indoor 4.5b

Fluorescente de embutir Refletor


branco
Min/Ave
0.91

Min/Max
0.89

Project maintenance factor


1.00

Philips Lighting B.V.

Scale
1:40
Page:

28/48

Projeto Lumire

W. Teixeira
Date: 02-06-2002

Sala Lumire

3.19 Mesa1: Filled Iso Contour


Grid
Calculation
Result Type

: Mesa1 at Z = 0.80 m
: Surface Illuminance (lux)
: Total

550

570

590

580

600

3.5

4.5

560

610

-0.5

0.5

1.5

Y(m)

2.5

-0.5

0.5

1.5

2.5

3.5

4.5

5.5

X(m)

Average
593
CalcuLuX Indoor 4.5b

Fluorescente de embutir Refletor


branco
Min/Ave
0.91

Min/Max
0.89

Project maintenance factor


1.00

Philips Lighting B.V.

Scale
1:40
Page:

29/48

Projeto Lumire

W. Teixeira
Date: 02-06-2002

Sala Lumire

3.20 Mesa1: Mountain Plot


Grid
Calculation
Result Type

: Mesa1 at Z = 0.80 m
: Surface Illuminance (lux)
: Total

3.2
3
2.8
2.6

1
2.4

1.2

2.2

1.4

X(m
)

1.8
2

CalcuLuX Indoor 4.5b

m)

1.6
1.8

Average
593

Y(

Min/Ave
0.91

1.6
1.4

Min/Max
0.89

Project maintenance factor


1.00

Philips Lighting B.V.

Page:

30/48

Projeto Lumire

W. Teixeira
Date: 02-06-2002

Sala Lumire

3.21 Mesa1a: Textual Table


Grid
Calculation
Result Type

: Mesa1a at Z = 0.80 m
: Surface Illuminance (lux)
: Total

X (m)
Y (m)
3.95

0.25

0.41

0.57

0.73

0.88

1.04

1.20

323<

339

353

367

380

396

406

3.76

356

374

391

408

425

441

453

3.58

378

399

419

439

458

474

487

3.39

397

421

443

464

485

503

517

440

463

486

508

527

542>

3.20

Average
431
CalcuLuX Indoor 4.5b

Min/Ave
0.75

Min/Max
0.60

Project maintenance factor


1.00

Philips Lighting B.V.

Page:

31/48

Projeto Lumire

W. Teixeira
Date: 02-06-2002

Sala Lumire

3.22 Mesa1a: Graphical Table


: Mesa1a at Z = 0.80 m
: Surface Illuminance (lux)
: Total

4.5

5.5

Grid
Calculation
Result Type

323 339 353 367 380 396 406


356 374 391 408 425 441 453

3.5

378 399 419 439 458 474 487


397 421 443 464 485 503 517
440 463 486 508 527 542

-1.5

-0.5

0.5

1.5

Y(m)

2.5

-0.5

0.5

1.5

2.5

3.5

4.5

5.5

X(m)

Average
431
CalcuLuX Indoor 4.5b

Fluorescente de embutir Refletor


branco
Min/Ave
0.75

Min/Max
0.60

Project maintenance factor


1.00

Philips Lighting B.V.

Scale
1:40
Page:

32/48

Projeto Lumire

W. Teixeira
Date: 02-06-2002

Sala Lumire

3.23 Mesa1a: Iso Contour


: Mesa1a at Z = 0.80 m
: Surface Illuminance (lux)
: Total

4.5

5.5

Grid
Calculation
Result Type

350
400

3.5

45

500

-1.5

-0.5

0.5

1.5

Y(m)

2.5

-0.5

0.5

1.5

2.5

3.5

4.5

5.5

X(m)

Average
431
CalcuLuX Indoor 4.5b

Fluorescente de embutir Refletor


branco
Min/Ave
0.75

Min/Max
0.60

Project maintenance factor


1.00

Philips Lighting B.V.

Scale
1:40
Page:

33/48

Projeto Lumire

W. Teixeira
Date: 02-06-2002

Sala Lumire

3.24 Mesa1a: Filled Iso Contour


Grid
Calculation
Result Type

: Mesa1a at Z = 0.80 m
: Surface Illuminance (lux)
: Total

350

450

500

3.5

4.5

400

-0.5

0.5

1.5

Y(m)

2.5

-0.5

0.5

1.5

2.5

3.5

4.5

5.5

X(m)

Average
431
CalcuLuX Indoor 4.5b

Fluorescente de embutir Refletor


branco
Min/Ave
0.75

Min/Max
0.60

Project maintenance factor


1.00

Philips Lighting B.V.

Scale
1:40
Page:

34/48

Projeto Lumire

W. Teixeira
Date: 02-06-2002

Sala Lumire

3.25 Mesa1a: Mountain Plot


Grid
Calculation
Result Type

: Mesa1a at Z = 0.80 m
: Surface Illuminance (lux)
: Total

0.2
0.4

4
0.6

3.8

X(m
)

0.8

3.6
1

3.4
1.2

Y(

m)

3.2
3

Average
431
CalcuLuX Indoor 4.5b

Min/Ave
0.75

Min/Max
0.60

Project maintenance factor


1.00

Philips Lighting B.V.

Page:

35/48

Projeto Lumire

W. Teixeira
Date: 02-06-2002

Sala Lumire

3.26 Mesa1a1: Textual Table


Grid
Calculation
Result Type

: Mesa2a at Z = 0.80 m
: Surface Illuminance (lux)
: Total

X (m)
Y (m)
3.95

2.25

2.41

2.57

2.73

2.88

3.04

3.20

432

430

429

427

426

426<

426

3.76

477

474

471

468

467

466

467

3.58

511

507

502

499

497

496

498

3.39

540

535

531

526

524

523

525

560>

555

551

548

547

550

3.20

Average
494
CalcuLuX Indoor 4.5b

Min/Ave
0.86

Min/Max
0.76

Project maintenance factor


1.00

Philips Lighting B.V.

Page:

36/48

Projeto Lumire

W. Teixeira
Date: 02-06-2002

Sala Lumire

3.27 Mesa1a1: Graphical Table


: Mesa2a at Z = 0.80 m
: Surface Illuminance (lux)
: Total

4.5

5.5

Grid
Calculation
Result Type

432 430 429 427 426 426 426


477 474 471 468 467 466 467

3.5

511 507 502 499 497 496 498


540 535 531 526 524 523 525
560 555 551 548 547 550

-1.5

-0.5

0.5

1.5

Y(m)

2.5

-0.5

0.5

1.5

2.5

3.5

4.5

5.5

X(m)

Average
494
CalcuLuX Indoor 4.5b

Fluorescente de embutir Refletor


branco
Min/Ave
0.86

Min/Max
0.76

Project maintenance factor


1.00

Philips Lighting B.V.

Scale
1:40
Page:

37/48

Projeto Lumire

W. Teixeira
Date: 02-06-2002

Sala Lumire

3.28 Mesa1a1: Iso Contour


: Mesa2a at Z = 0.80 m
: Surface Illuminance (lux)
: Total

4.5

5.5

Grid
Calculation
Result Type

450
475

3.5

500
525

550

-1.5

-0.5

0.5

1.5

Y(m)

2.5

-0.5

0.5

1.5

2.5

3.5

4.5

5.5

X(m)

Average
494
CalcuLuX Indoor 4.5b

Fluorescente de embutir Refletor


branco
Min/Ave
0.86

Min/Max
0.76

Project maintenance factor


1.00

Philips Lighting B.V.

Scale
1:40
Page:

38/48

Projeto Lumire

W. Teixeira
Date: 02-06-2002

Sala Lumire

3.29 Mesa1a1: Filled Iso Contour


Grid
Calculation
Result Type

: Mesa2a at Z = 0.80 m
: Surface Illuminance (lux)
: Total

450

500

550

525

3.5

4.5

475

-0.5

0.5

1.5

Y(m)

2.5

-0.5

0.5

1.5

2.5

3.5

4.5

5.5

X(m)

Average
494
CalcuLuX Indoor 4.5b

Fluorescente de embutir Refletor


branco
Min/Ave
0.86

Min/Max
0.76

Project maintenance factor


1.00

Philips Lighting B.V.

Scale
1:40
Page:

39/48

Projeto Lumire

W. Teixeira
Date: 02-06-2002

Sala Lumire

3.30 Mesa1a1: Mountain Plot


Grid
Calculation
Result Type

: Mesa2a at Z = 0.80 m
: Surface Illuminance (lux)
: Total

2.2
2.4

4
2.6

3.8

X(m
)

2.8

3.6
3

3.4
3.2

Y(

m)

3.2
3

Average
494
CalcuLuX Indoor 4.5b

Min/Ave
0.86

Min/Max
0.76

Project maintenance factor


1.00

Philips Lighting B.V.

Page:

40/48

Projeto Lumire

W. Teixeira
Date: 02-06-2002

Sala Lumire

3.31 Mesa1a2: Textual Table


Grid
Calculation
Result Type

: Mesa3a at Z = 0.80 m
: Surface Illuminance (lux)
: Total

X (m)
Y (m)
3.95

4.25

4.41

4.57

4.72

4.88

5.04

5.20

427

425

420

411

402

387

373<

3.76

478

476

470

460

448

433

416

3.58

514

512

506

494

481

466

448

3.39

545

543

537

525

510

494

474

569>

562

549

535

518

496

3.20

Average
479
CalcuLuX Indoor 4.5b

Min/Ave
0.78

Min/Max
0.66

Project maintenance factor


1.00

Philips Lighting B.V.

Page:

41/48

Projeto Lumire

W. Teixeira
Date: 02-06-2002

Sala Lumire

3.32 Mesa1a2: Graphical Table


: Mesa3a at Z = 0.80 m
: Surface Illuminance (lux)
: Total

4.5

5.5

Grid
Calculation
Result Type

427 425 420 411 402 387 373


478 476 470 460 448 433 416

3.5

514 512 506 494 481 466 448


545 543 537 525 510 494 474
569 562 549 535 518 496

-1.5

-0.5

0.5

1.5

Y(m)

2.5

-0.5

0.5

1.5

2.5

3.5

4.5

5.5

X(m)

Average
479
CalcuLuX Indoor 4.5b

Fluorescente de embutir Refletor


branco
Min/Ave
0.78

Min/Max
0.66

Project maintenance factor


1.00

Philips Lighting B.V.

Scale
1:40
Page:

42/48

Projeto Lumire

W. Teixeira
Date: 02-06-2002

Sala Lumire

3.33 Mesa1a2: Iso Contour


: Mesa3a at Z = 0.80 m
: Surface Illuminance (lux)
: Total

4.5

5.5

Grid
Calculation
Result Type

400

450

3.5

50

550

-1.5

-0.5

0.5

1.5

Y(m)

2.5

-0.5

0.5

1.5

2.5

3.5

4.5

5.5

X(m)

Average
479
CalcuLuX Indoor 4.5b

Fluorescente de embutir Refletor


branco
Min/Ave
0.78

Min/Max
0.66

Project maintenance factor


1.00

Philips Lighting B.V.

Scale
1:40
Page:

43/48

Projeto Lumire

W. Teixeira
Date: 02-06-2002

Sala Lumire

3.34 Mesa1a2: Filled Iso Contour


Grid
Calculation
Result Type

: Mesa3a at Z = 0.80 m
: Surface Illuminance (lux)
: Total

400

500

550

3.5

4.5

450

-0.5

0.5

1.5

Y(m)

2.5

-0.5

0.5

1.5

2.5

3.5

4.5

5.5

X(m)

Average
479
CalcuLuX Indoor 4.5b

Fluorescente de embutir Refletor


branco
Min/Ave
0.78

Min/Max
0.66

Project maintenance factor


1.00

Philips Lighting B.V.

Scale
1:40
Page:

44/48

Projeto Lumire

W. Teixeira
Date: 02-06-2002

Sala Lumire

3.35 Mesa1a2: Mountain Plot


Grid
Calculation
Result Type

: Mesa3a at Z = 0.80 m
: Surface Illuminance (lux)
: Total

4.2
4.4

4
4.6

3.8

X(m
)

4.8

3.6
5

3.4
5.2

Y(

m)

3.2
3

Average
479
CalcuLuX Indoor 4.5b

Min/Ave
0.78

Min/Max
0.66

Project maintenance factor


1.00

Philips Lighting B.V.

Page:

45/48

Projeto Lumire

W. Teixeira
Date: 02-06-2002

Sala Lumire

4. Luminaire Details
4.1 Project Luminaires
Luminous Intensity Diagram (candela/1000 lumen)
120o
150o 180o 150o
120o

Fluorescente de embutir Refletor branco 2 x Fluorescente 36W


Light output ratios
DLOR
ULOR
TLOR
Ballast
Lamp flux
Luminaire wattage

:
:
:
:
:
:

0.83
0.00
0.83
Eletrnico
2700 lm
64.0 W

Note: Luminaire data not from database.

90o

90o

60o

60o

200

30o

CalcuLuX Indoor 4.5b

Philips Lighting B.V.

C = 180o
C = 270o

0o

30o
C = 0o
C = 90o

Imax

Page:

46/48

Projeto Lumire

W. Teixeira
Date: 02-06-2002

Sala Lumire

5. Installation Data
5.1 Legends
Project Luminaires:
Code
Qty Luminaire Type
Fluorescente de embutir Refletor
A
4
branco

Lamp Type

Flux (lm)

2 * Fluorescente 36W

2 * 2700

5.2 Luminaire Positioning and Orientation


Qty and
Code
1*A
1*A
1*A
1*A

Position

Aiming Angles

X (m)

Y (m)

Z (m)

Rot.

Tilt90

Tilt0

1.50
1.50
4.50
4.50

1.00
3.00
1.00
3.00

2.80
2.80
2.80
2.80

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

CalcuLuX Indoor 4.5b

Philips Lighting B.V.

Page:

47/48

Projeto Lumire

W. Teixeira
Date: 02-06-2002

Sala Lumire

6. Financial Information
6.1 Installation Data
Burning hours/year
Amortization period
Interest rate
kWh price

0 hr
1.0 yr
0.0 %
0.00

6.2 Luminaire Information


Prices ()
Project Luminaires
Fluorescente de embutir Refletor
branco

Qty
4

Lamp

Luminaire

Installation

Maintenance

0.00

0.00

0.00

0.00

Relamping
period (yr)
1.00

6.3 Total cost


Costs per year
Energy
Investment
Lamps
Maintenance
Total
Total investment

CalcuLuX Indoor 4.5b

0.00
0.00
0.00
0.00
------------0.00
0.00

Philips Lighting B.V.

Page:

48/48

You might also like