LIFTING PLAN DOC NO :- RIL/SP/04, Rev-0

RAMSARUP INDUSTRIES LIMITED DATE


CONTRACTOR NAME: PTW NO:
LIFTING DESCRIPTION:
SL. NO. CHECK LIST POINT PARAMETER
1 Scope

2 Crane using for lifting


3 Capacity of crane
4 Size of sling
5 Capacity of D-shackle
6 Lifting Plate
7 Crane/Hydra using for Tailing
8 Capacity of cran/hydra
9 Operating Boom length
10 Size of sling
11 Capacity of D-shackle
Operating Condition
12 of lifting crane
13 Operating Boom length
14 Main Boom length
15 Working radius
16 Hoisting capacity(SWL)

17 Weight to be lifted

18 Total weight to be lifted

19 Margin

JOB SAFETY ANALYSIS


SL. NO. POTENTIAL HAZARD PREVENTIVE ACTION TAKEN
Check all tools & tackles before use them. Due to failure of
1 Fall of material tools & tackles may cause fall of material
Only competent person deployed at work using
2 Fall of person mandatory PPE's with full body Harness and fall arrester
Ensure that the crane placed in proper position and check the working radius and in that radius how much
3 Topping of crane load can be lifted
Entry of unauthorised person to
4 the area
Barrication to be done near working area to halt the unauthorized entry

5 Failure of crane/equipment Before lifting the material ensure all equipment in working condition
6 Swing redius of crane Surrounding area will be cordon off by using barrication tap

7 Foreman Name

Contractor Incharge RIL Representative RIL Safety