Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

CUT TO LENGHT CNC BENDING WELDING SANDING PAINTING (EXTERNAL) RIVETING GLUED ASSEMBLY

HEADER
HEADER SCREWS
CROSS BAR STEEL PARTS STEEL PARTS STEEL PARTS LEFT SIDE EVA FOAM
SIDE BARS HOLES AND MACHINE CROSS BAR MOTORS
SIDE BARS ALUMINUM PARTS ALUMINUM PARTS ALUMINUM PARTS RIGHT SIDE AUTOMOTIVE SEAL
REAR BOW MOTOR COVERS
REAR BOW

DRILL & RIVETING


CROSS BARS
DRILL FRONT HEADER
REAR BOW
HEADER CANVAS & HEAD LINER

BAG PREPARATION TOP ASSEMBLY PACKING


ELECTRICAL HARNESS CANVAS
FULL ASSEMBLY
TRIANGLES LINKAGES

CUT
HARTZ FABRIC SEWING 1 JOINT MELTEX SEWING 6 CUT
INLINER
HEADLINER 1 BACK & SIDE WINDOWS 1 BACK & SIDE WINDOWS
BACK WINDOW 1 WINDOW SEWING 4.5 CM DOOR FRAMES
WINDOW 2 WINDOWS A WITH TOP 2 JOINT WINDOW “A” WITH TOP
SIDE WINDOWS 2 SIDE WINDOWS MOTOR COVERS
BINDING (BIES) 3 REAR WINDOW WITH “B” 3 REAR WINDOW WITH “B”
LONA KEEDER
BOW PAD

SEWING 2 ASSEMBLY SEWING 7 SEWING 8 DELIVERY


BINDING
PLASTICS OPEN WINDOWS
INNER LINER CANVAS WITH INNER LINER CABLE GUIDE
VELCROS CHECK LIST
FRONT HEADER PLASTIC

SEWING 3

BOW PAD

SEWING 4
B PILLAR
C PILLAR

SEWING 5

HEAD LINNER

LINED

TRIANGLES

You might also like