PT Gheni Arta Sejahtera

Blower and Compressor Calculation (Metric Unit)

Client
Project
Pump Tag Number
Pump Service Vapor Return Blower
Case 1 2 - -
General Input
Fluid Service Boil Off Gas (BOG)
Mass Density kg/m3 8.09 8.09
Molecular Weight kg/kmol 16.74 16.74
Isentropic Constant (k) Note 3 - 1.27 1.27
Compressibility Factor (Z) - 0.90 0.90
Gas Constant (R) J/kgK 8.314 8.314
Normal Flow Rate kg/h 728.07 218.42
Normal Flow Rate m3/h 90.00 27.00
Design Margin Note 2 % 20 0
Design Flow Rate m3/h 108.00 27.00
Suction
Pressure bar (g) 4.000 4.000
Temperature o
C -135.00 -135.00
Discharge
Destination Iso Tank
Pressure barg (g) 4.30 4.30
Output
Discharge Temperature o
C -133.28 -133.28
Isentropic Power kW 0.73 0.22
Estimated Efficiency Note 4 % 70 70
Estimated Power kW 1.05 0.31
Proposed Installed Power kW 2.00
Note:
1. The Blower is divided into 2 Cases:
Case 1: Maximum Flowrate of LNG Unloading Pump (90 m3/h + 20% design margin)
Case 2: Minimum Flowrate of LNG Unloading Pump (27 m3/h))
2. Design Margin is applied 20% for Maximum Flowrate only
3. Isentropic constant of Natural Gas is 1.27
4. Estimated efficiency (vendor to confirm)

Originator AW
Checker
Approval
Pg 1 of 1 Revision