METHOD STATEMENT
REPAIR WORKS (COLD JOINT)
[Keywords]
REPAIR WORKS (COLD JOINT) Revision: 00
REVISION HISTORY
TABLE OF CONTENTS
1 INTRODUCTION..................................................................................................................................
1.1 PURPOSE......................................................................................................................................
1.2 SCOPE..........................................................................................................................................
2.2 DEFINITIONS..................................................................................................................................
3 REFERENCES.....................................................................................................................................
3.1 PROJECT DOCUMENTS...................................................................................................................
3.2 STANDARDS...................................................................................................................................
4 RESOURCES.......................................................................................................................................
4.1 MATERIAL......................................................................................................................................
4.2 MANPOWER...................................................................................................................................
1.5 HOUSEKEEPING...........................................................................................................................
1 INTRODUCTION
This statement is to describe the activities and method which will be used to carry
out repair work especially for cold joint case for the Construction and Completion of
Proposed Sungai Besi – Ulu Kelang Elevated Expressway (SUKE).
1.1 Purpose
The purpose of this method statement is to outline the method and procedure to
carry out rectification work for cases of cold joint.
1.2 Scope
To carry out rectification works on defect at structure.
2.1 Abbreviations
Abbreviation Definition
PLSUSB Projek Lintasan Sungai Besi – Ulu Kelang Sdn. Bhd.
2.2 Definitions
Terms Definition
Work Package Contractor Syarikat Muhibah Perniagaan & Pembinaan Sdn. Bhd.
3 REFERENCES
3.2 Standards
Document Number Document Title
(JKR/SPJ/2009-S9) Section 9 – Concrete Work
4 RESOURCES
4.1 Material
a) Sika Monotop R
b) Antisol A
4.2 Manpower
No Type Quantity
1 General worker 2
2 Skilled Worker 1
3 Supervisor 1
4 Site Engineer 1
Job Safety & Health Analysis shall be carried on the project site. Traffic
management shall be approved and implemented at work areas. Barriers
and safety awareness signs shall be established at location of works such
as sheet piling work. The hazards in a particular activity and the control
measures implemented shall be briefed to the workers during safety
induction, tool box talk and JSA briefing.
All workers employed in the project site must have CIDB green
card.
All new workers and staff to attend the Safety Training or Safety
Induction Course Before commencing works site and attendances
shall be recorded in an induction list.
All site personnel shall wear proper Personnel Protective
Equipment (PPE):
Safety helmets, Safety vest, Safety boots, Water Boot, etc.
Activities may require additional PPE on top of the above such as
Safety Harness may be necessary.
All workers to attend the weekly toolbox meetings conducted by
the safety officer held at site and attendances shall be recorded.
Signboards must be provided to warn workers and public of
dangers associated with construction works.
- To remove
depending on the site terrain and condition. All runoff from undisturbed
areas should not be allowed to mix with runoff from the disturbed area.
1.5 Housekeeping
Housekeeping is an essential part of safety for the daily routine.
Housekeeping would include the following items:
Maintain access/egress to all working area.
Store and stack all construction materials in safe and orderly
manner.
No littering around the site.
D.2 Antisol