Inspection and Test Plan Projek Penswastaan Lebuhraya Bertingkat Sungai Besi - Ulu Kelang (Suke)
Inspection and Test Plan Projek Penswastaan Lebuhraya Bertingkat Sungai Besi - Ulu Kelang (Suke)
Inspection and Test Plan Projek Penswastaan Lebuhraya Bertingkat Sungai Besi - Ulu Kelang (Suke)
1.0
PRECAST PARAPET
WORKS
Material Submission for Technical Specification Technical Specification Before Commencement Approved Material
1.3 H R
Approval Section 15 – Parapets Section 15 – Parapets Of Work Submission
Remarks:
H - Hold Point
Points where no further works shall proceed without the written approval of the Supervising Inspection Authority:
Consultant mainly SO/SOR and above.
- SMPP Works Package Contractor
Points where SO/SOR can opt to observe / or visually examine or participate in the QC
W - Witness Point
operation of the SMPP. SO Superintendent Officer
Point where the SO/SOR representative monitor the SMPP activities to the degree necessary
S - Surveillance
for confidences that the work process/ method is in compliances with the established criteria.
R - Review Review of the SMPP 's ITP records for correctness and completeness
INSPECTION AND TEST PLAN
PROJEK PENSWASTAAN LEBUHRAYA BERTINGKAT SUNGAI BESI – ULU KELANG (SUKE)
Remarks:
H - Hold Point
Points where no further works shall proceed without the written approval of the Supervising Inspection Authority:
Consultant mainly SO/SOR and above.
- SMPP Works Package Contractor
Points where SO/SOR can opt to observe / or visually examine or participate in the QC
W - Witness Point
operation of the SMPP. SO Superintendent Officer
Point where the SO/SOR representative monitor the SMPP activities to the degree necessary
S - Surveillance
for confidences that the work process/ method is in compliances with the established criteria.
R - Review Review of the SMPP 's ITP records for correctness and completeness
Masukkn item rebar, mould preparation, curing, lifting of parapet