The document raises two queries regarding the scope of services and personnel in a request for proposal. Specifically, it notes that the design review process does not currently include input from a bridge or structural engineer, and that the construction period does not specify the number of months for a bridge or structural engineer, though 179 total months are allocated. Clarification is requested to address these omissions.
The document raises two queries regarding the scope of services and personnel in a request for proposal. Specifically, it notes that the design review process does not currently include input from a bridge or structural engineer, and that the construction period does not specify the number of months for a bridge or structural engineer, though 179 total months are allocated. Clarification is requested to address these omissions.
The document raises two queries regarding the scope of services and personnel in a request for proposal. Specifically, it notes that the design review process does not currently include input from a bridge or structural engineer, and that the construction period does not specify the number of months for a bridge or structural engineer, though 179 total months are allocated. Clarification is requested to address these omissions.
Point of Queries Our Comments / Clarifications required
No. as per RFP 1. cl. 3.1 design Design Review-Input of bridge During design review there is no input of review engineer/structural engineer bridge/structural engineer. It shall be (SCOPE OF added. SERVICES) 2. cl.4 Construction period-Input months of Input man months of bridge/structural Consultant’s bridge engineer/structural engineer engineer not mentioned in the scope. It Personnel shall be mentioned (179 months)