Professional Documents
Culture Documents
Dilip Kumar Sharma: Objective
Dilip Kumar Sharma: Objective
Objective
To work in an environment which encourages me to succeed and grow professionally where I can utilize my skills
and knowledge appropriately.
Experience
Responsibilities:
Key person for Project Implementing Works under Central Sponsored Schemes viz. AMI (Smart Metering)
PMDP-U, IPDS, DDUGJY and RAPDRP-B. Overseeing Smart metering works in Srinagar (J&K) - 6.0 lacs.
Knowledge of AMI Components like Smart meters, DCU, Routers, HES, MDMS and software’s.
Responsible for consumer indexing, Installation and commissioning of AMI equipment’s like Smart
meters, DCU, Routers, Consumer online billing generation etc.
Deployment of manpower as per onsite resource requirement.
Monitoring safety programs & training for quality Works.
Preparing a detailed Project plan to schedule key project milestones, Work streams & Activities.
Preparing Daily, Monthly, Quarterly Forecasts and Progress reports for Client as well as top
management to overcome the deficiency and targeted achievement as per the norms of the power
ministry.
Supervision & monitoring complete flow of data from Smart meter-HES-MDMS-CC&B.
To provide inputs on issues related to HES/MDMS in data communication and data uploading.
HES & MDMS application management.
Supervision & monitoring Smart meter-HES-MDMS integration.
Providing Guidance regarding Billing Issue.
Monitoring Communication Status, Load Profile, Billing Efficiency.
Verification of Received materials with approved GTP at TKC Store.
REC Power Development & Consultancy Limited (Dec 2018 – Oct 2022)
Designation: Project Engineer
Responsibilities:
Responsible for Survey, planning, erection and commissioning of HT/LT overhead distribution lines
UG Cable etc.
Finalising HT and LT Survey drawing along with PMA & Client.
Projects Execution by coordinating with team of supervisors for smooth carrying out of Erection
works. Assess the material requirement according to the targeted erection plan.
Monitoring daily site execution activities & preparing erection progress.
Resolving Right of way (ROW) issues with local Public, Objection by forest department, PWD For
speedy Progress.
Cross verification of Bill of quantity (BOQ) & Bill of material (BOM).
Preparing Daily, Monthly, Quarterly Forecasts progress reports for Client as well as top
management to overcome the deficiency and targeted achievement as per the norms of the power
ministry.
Installation & Commissioning of Solar Rooftop system up to 5KW at New 33/11 Kv Receiving
Station.
Responsible for Construction, Testing & Commissioning of New 33/11 KV Substation and
Augmentation works.
Verification Handing over/Taking Over Documents for final submission.
Dynamic Electro-mech (Jan 2017 – Dec 2018)
Designation: Site Engineer
Responsibilities:
Responsible for Survey, Installation & Commissioning of Solar Rooftop system up to 5KW in Govt
Institute.
Worked in project based on Installation and Commissioning of Solar AC/DC Pump and Roof Top
Solar PV System across all over M.P under MPUVN ltd.
Responsible for identifying requirements to meet the project delivery schedules and in determining
solutions, if any.
Responsible for providing technical guidance to the staff in power system start up and
commissioning.
Responsibilities:
Worked as testing engineer in transformer manufacturing company, which manufactures Power
Transformer as well as Distribution transformer up to 5 MVA.
Perform operation and maintenance of power system to ensure quality control.
Responsible for analysing project development documents and provide recommendation, if
required
Projects
Skills
Auto CAD
MS Office
Project Management
Quality Control
Education
Language