Professional Documents
Culture Documents
Quezon 1St District Engineering Office: Republic of The Philippines Department of Public Works and Highways
Quezon 1St District Engineering Office: Republic of The Philippines Department of Public Works and Highways
Quezon 1St District Engineering Office: Republic of The Philippines Department of Public Works and Highways
For Programmers
S T A N D A
Due Date
Major Final Output Success Indicator
(Timeline) 5 4
Conduct Site Inspection/Validation Q N/A N/A
in 2
hours per project
E 100% 90-99.99%
1 hr and 30
T less than 1 hr mins - 2
hrs
Prepare Detailed Engineering Q No error
Design in 1 week per project
E 100% 90-99.99%
Preliminary
Detailed Engineering Design T 2 days 4 days
and Program of Work for Prepare Program of Work (POW)
LOCAL PROGRAM (Local Q No error
in 8 hours/ project
Infrastructure Projects)
E 100% 90-99.99%
S T A N D A R D S
3 2 1
more than 12
10 minutes 11 - 12 minutes
minutes
Approved by:
S T A N D A R D S
3 2 1
N/A N/A N/A
PROJECT IMPLEMENTATION (For Project Engineers, Project Inspector and Resident Engineers)
Due Date S T A N D A R D S
Major Final Output Success Indicator
(Timeline) 5 4 3
Implementation of FCR All Conduct Pre-Construction Meeting Q N/A N/A N/A
Regular Infrastructure (OO1, with the contractors, end users
OO2) and Other Infrastructure and other concerned bodies in 2 E 100% 90-99.99% 80-89.99%
Projects (CONVERGENCE AND hours
SPECIAL SUPPORT PROGRAM, 1 hr - 1 hr and 59
T less than 1 hr 2 hrs
LOCAL INFRASTRUCTURE mins
PROGRAM, DA, DEPED) Conduct of Stake-Out Survey Q N/A N/A N/A
between the Implementing Office
and Contractor (Joint Survey) in E 100% 90-99.99% 80-89.99%
10 days
5 days - 9 days and
T less than 5 days 10 days
7 hrs
Review As-Staked Plans in 1 day Q N/A N/A N/A
1 hr - 1 hr and 59
T less than 1 hr 2 hrs
mins
Review PERT-CPM/PDM in 1 day Q N/A N/A N/A
Supervise DA Projects in
100% completed
accordance with the approved 100% completed
100% completed with no major and
Plans and Specifications to be Q with no major and 1-
with no defects less than 3 minor
completed by June 30, 2021 2 minor defects
defects
S T A N D A R D S
2 1
N/A N/A
N/A N/A
N/A N/A
N/A N/A
N/A N/A
Major Error
Major Error
Major Error
Major Error
Major Error
100% completed
100% completed
with greater than 3
with 1-2 major and
major and greater
1-2 minor defects
than 3 minor defects
N/A N/A
100% completed
100% completed
with greater than 3
with 1-2 major and
major and greater
1-2 minor defects
than 3 minor defects
N/A N/A
100% completed
100% completed
with greater than 3
with 1-2 major and
major and greater
1-2 minor defects
than 3 minor defects
N/A N/A
Due Date S T A N D A
Major Final Output Success Indicator
(Timeline) 5 4
Review and Endorse to Chief of Q N/A N/A
Construction Request for Advance
Payment in 2 days E 100% 90-99.99%
T 4 hours 8 hours
CONTRACT CLAIMS UNIT
Due Date S T A N D A
Major Final Output Success Indicator
(Timeline) 5 4
Review and Endorse to Chief of Q N/A N/A
Construction of Monthly Certificate
of Payment (MCP) and SWA for E 100% 90-99.99%
Progress Billing in 2 days
T 4 hours 8 hours
T 4 hours 8 hours
T 4 hours 8 hours
T 4 hours 8 hours
T 4 hours 8 hours
CONTRACT CLAIMS UNIT
Due Date S T A N D A
Major Final Output Success Indicator
(Timeline) 5 4
Certify and Endorse Disbursement Q N/A N/A
Voucher (DV) for for Final
Payment in 1 day E 100% 90-99.99%
T 4 hours 8 hours
T 4 hours 8 hours
T 4 hours 8 hours
T 4 hours 8 hours
S T A N D A R D S
3 2 1
N/A N/A N/A
Approved by:
Due Date S T A N D A R D S
Major Final Output Success Indicator
(Timeline) 5 4 3
Canvass and Update Construction Q No error Minor Error
Materials Price Data (CMPD) in 10
before 20th
days E 100% 90-99.99% 80-89.99%
of every
quarter
5 days - 9 days and
T less than 5 days 10 days
Construction Materials Price 7 hrs
Data (CMPD) Check and Endorse Updated Q N/A N/A N/A
Construction Materials District
20th of
Engineer in 1 day E 100% 90-99.99% 80-89.99%
every
quarter
4 hrs - 7 hrs and 59
T less than 4 hrs 1 day
mins
Consolidate Previous billing from Q N/A N/A N/A
the Financial Management Section
in 2 days E 100% 90-99.99% 80-89.99%
S T A N D A R D S
2 1
Major Error
N/A N/A
Major Error
N/A N/A
25 minutes 30 minutes
S T A N D A R D S
2 1
N/A N/A
25 minutes 30 minutes
N/A N/A
2 days 3 days
Major Error
6 hours 1 day
N/A N/A
N/A N/A
Major Error
6 hours 1 day
S T A N D A R D S
2 1
N/A N/A
6 days 7 days
Major Error
N/A N/A
25 minutes 30 minutes
N/A N/A
25 minutes 30 minutes
Due Date S T A N D A R D S
Major Final Output Success Indicator
(Timeline) 5 4 3 2 1
Contractor's Performance rating Q N/A N/A N/A N/A N/A GOOD
receinved from the CPES
inspectorate team from the E 130% 115%-129% 100%-114% 51%-99% 50% below
Central Office in 3 minutes
T 1 minute 2 minutes 3 minutes 4 minutes 5 minutes
Transmittal letter prepared to Q No error with minor revision with major revision
Implementing Office (R.O. DEO)
with no minor revision in 3 days E 130% 115%-129% 100%-114% 51%-99% 50% below
Due Date S T A N D A
Major Final Output Success Indicator
(Timeline) 5 4
Coordinate and assist CPES Q N/A N/A
evaluators and provide all
necessary documents for E 100% 90-99.99%
reference in 1 day
4 hrs - 7 hrs and 59
T less than 4 hrs
mins
CPES Project Evaluation
Assist the contractors during Q N/A N/A
rectification of CPES findings and
observations, and submit pertinent E 100% 90-99.99%
documents and proof of
rectification of works in 2 days 1 day - 1 day and 7
T less than 1 day
hrs
Receive Contractor's Performance Q N/A N/A
rating from the CPES inspectorate
team from the Central Office in 10 E 100% 90-99.99%
minutes
T 6 minutes 8 minutes
T 15 minutes 20 minutes
T 6 minutes 8 minutes
S T A N D A R D S
3 2 1
N/A N/A N/A
Approved by:
CORRESPONDENCE
Due Date S T A N D A
Major Final Output Success Indicator
(Timeline) 5 4
Receive instruction from Chief of
Q N/A N/A
Construction for the proper
actions in 10 minutes
E 100% 90-99.99%
T 6 minutes 8 minutes
Prepare communication
Q No error
letters/memoranda to/for various
concerned Offices/persons in 1
day and 30 mins E 100% 90-99.99%
T 15 minutes 20 minutes
E 100% 90-99.99%
T 6 minutes 8 minutes
Submit/Forward to District
Q N/A N/A
Engineer's Office for approval in
10 mins
E 100% 90-99.99%
T 6 minutes 8 minutes
T 6 minutes 8 minutes
E 100% 90-99.99%
T 15 minutes 20 minutes
E 100% 90-99.99%
T 5 minutes 10 minutes
T 5 minutes 10 minutes
T 15 minutes 20 minutes
E 100% 90-99.99%
T 5 minutes 10 minutes
in accordance with
Q Implementation of
DoTS for Civil Works
Project
Accept/Receive documents into the
DoTS DoTS and forward the same to the
concerened office in 1 day & 30 mins E 100% 90-99.99%
Q No error
T 6 minutes 8 minutes
S T A N D A R D S
3 2 1
more than 25
15 minutes 25 minutes
minutes
1day 40 minutes
1day 30 mins 1day 35 mins
beyond
N/A N/A N/A
Approved by:
Pre Construction Meeting was scheduled and convened with the Contractor, LGU, Brgy. Officials in 3 days
MFO 1 - National Road Network
Services - Network Development Project documents such as logbook, activity report, accomplishment and possible suspension orders
- Construction of
By-passess/Diversion Roads, prepared with no revision in 1 day (weekly report)
including ROW - Construction of
Sariaya By-Pass, including Bridge, SWA/other doc. prior to monthly billing checked with no revision in 1 day
Sariaya, Quezon Province
SWA/other doc. checked with no minor revision prior to monthly billing in 1 day
DUPA (materials, equipment and manpower), POW and ABC, Plans checked with no minor revisions in 1
day
Findings/comments relayed to Chief of Construction Division/Head of TWG for proper actions in 1 hour
Checking of POW and ABC, (DEO Findings/comments were coordinated with the concern person in 2 hours (if necessary)
project)
Transmittal prepared to DEO stating the findings/comments with no minor revision in 2 hours (if
necessary)
POW and ABC approved if no corrections in 1 hour and 40 minutes
Documents as per D.0 156, series 2015 checked with no minor error in 4 hours
Findings/comments relayed to Chief of Construction Division/Head of TWG for proper actions in 1 hour
Checking of Suspension Order, Findings/comments were coordinated with the concern person in 2 hours (if necessary)
(DEO project)
Transmittal prepared to DEO stating the findings/comments with no minor revision in 2 hours (if
necessary)
POW and ABC approved if no corrections in 1 hour and 40 minutes
DUPA (materials, equipment and manpower) of additional new item of works and supporting documents
checked with no minor error in 3 days
Pre Clearance checked in 4 hours prior to reason of changes/variation of quantities
Checking of Variation Order (DEO Findings/comments relayed to Chief of Construction Division/Head of TWG for proper actions in 1 hour
project)
Findings/comments were coordinated with the concern person in 2 hours (if necessary)
Transmittal prepared to DEO stating the findings/comments (if necessary) with no minor revision in 2
hours
Variation Order approved in 1 hour and 40 minutes if no corrections
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE IV - A
QUEZON 1ST DISTRICT ENGINEERING OFFICE
Brgy. Abang, Lucban, Quezon
Due Date S T A N D A R D S
Major Final Output Success Indicator
(Timeline) 5 4 3
Request was coordinated to Supply Unit Q N/A N/A N/A
regarding the Diesel allowance and trip
E 100% 90-99.99% 80-89.99%
ticket in 30 minutes
T 10 minutes 20 minutes 30 minutes
P.O was submitted to Chief of Construction Q N/A N/A N/A
Section for checking and approval in 15
E 100% 90-99.99% 80-89.99%
minutes
T 5 minute 10 minutes 15 minutes
Requisition of Diesel
Allowance and trip ticket P.O was submitted to Chief of Supply Unit Q N/A N/A N/A
for approval in 15 minutes
E 100% 90-99.99% 80-89.99%
S T A N D A R D S
2 1
N/A N/A
50-79.99% Below 50%
40 minutes 1 hour
N/A N/A
50-79.99% Below 50%
25 minutes or
20 minutes
beyond
N/A N/A
50-79.99% Below 50%
25 minutes or
20 minutes
beyond
N/A N/A
50-79.99% Below 50%
25 minutes or
20 minutes
beyond
N/A N/A
50-79.99% Below 50%
40 minutes 1 hour
Major Error
50-79.99% Below 50%
2 hours and 30
3 hours or beyond
minutes
N/A N/A
50-79.99% Below 50%
2 hours and 30
3 hours or beyond
minutes
N/A N/A
50-79.99% Below 50%
40 minutes 1 hour
N/A N/A
50-79.99% Below 50%
20 minutes 25 minutes
N/A N/A
50-79.99% Below 50%