Republic of the Philippines

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


REGIONAL OFFICE IV - A
QUEZON 1ST DISTRICT ENGINEERING OFFICE
Brgy. Abang, Lucban, Quezon

Strategic Performance Management System Database


CONSTRUCTION SECTION
For the period of : January to June 2021

For Programmers

S T A N D A
Due Date
Major Final Output Success Indicator
(Timeline) 5 4
Conduct Site Inspection/Validation Q N/A N/A
in 2
hours per project
E 100% 90-99.99%
1 hr and 30
T less than 1 hr mins - 2
hrs
Prepare Detailed Engineering Q No error
Design in 1 week per project
E 100% 90-99.99%
Preliminary
Detailed Engineering Design T 2 days 4 days
and Program of Work for Prepare Program of Work (POW)
LOCAL PROGRAM (Local Q No error
in 8 hours/ project
Infrastructure Projects)
E 100% 90-99.99%

T less than 7 hrs 7 - 8 hrs


Check, Review and Sign Detailed Q N/A N/A
Engineering Design (DED)
Program of Work (POW) in 20
minutes E 100% 90-99.99%

T less than 15 mins 15 - 19 minutes


Submit Approved POW and ABC to Q No error
Bids and Awards Committee (BAC)
for Procurement Activities in 10
minutes E 100% 90-99.99%

T less than 8 minutes 8 - 9 minutes

Prepared by: Noted by:

EUFRONIA S. CABAYSA MELINDA E. STO. DOMINGO


Chief, Construction Section Engineer III
Officer-in-Charge
Office of the Assistant District Engineer
Republic of the Philippines
T OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE IV - A
T DISTRICT ENGINEERING OFFICE
rgy. Abang, Lucban, Quezon

rmance Management System Database


ONSTRUCTION SECTION
e period of : January to June 2021

S T A N D A R D S
3 2 1

N/A N/A N/A

80-89.99% 50-79.99% Below 50%

2 hrs - 2 hrs and 30 more than 2 hrs and


2 hrs/project
mins 30 mins
Minor Error Major Error

80-89.99% 50-79.99% Below 50%

1 week 8 days 9 days or beyond

Minor Error Major Error

80-89.99% 50-79.99% Below 50%

8hrs/project 8 - 9 hrs more than 9 hrs

N/A N/A N/A

80-89.99% 50-79.99% Below 50%

1 day - 1 day and 4 more than 1 day and


20 minutes
hrs 4 hrs
Minor Error Major Error

80-89.99% 50-79.99% Below 50%

more than 12
10 minutes 11 - 12 minutes
minutes

Approved by:

MA. CHYMBELIN D. IBAL


Engineer IV
Officer-in-Charge
Office of the District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE IV - A
QUEZON 1ST DISTRICT ENGINEERING OFFICE
Brgy. Abang, Lucban, Quezon

Strategic Performance Management System Database


CONSTRUCTION SECTION
PROJECT AND CONTRACT MANAGEMENT UNIT
For the period of : January to June 2021

Major Final Output Due Date S T A N D A


Success Indicator
(Timeline) 5 4
Assign Project Engineer, Project Q N/A N/A
Inspector, and Resident Engineer
to Projects in 5 mins/project E 100% 90-99.99%

T less than 4 hrs 2 mins - 5 mins

Prepare Project Designation Order Q No error


(PDO) in 1 day
Pre-Construction E 100% 90-99.99%
Documentation
4 hrs - 7 hrs and 59
T less than 4 hrs
mins
Issue Project Designation Order Q No error
(PDO) in 1 day
E 100% 90-99.99%
4 hrs - 7 hrs and 59
T less than 4 hrs
mins
Prepare Notice to Proceed (NTP) Q No error
in 1 day
E 100% 90-99.99%
4 hrs - 7 hrs and 59
T less than 4 hrs
mins
Review and Endorse Notice to Q N/A N/A
Proceed (NTP) in 1 day
Issued Notice to Proceed E 100% 90-99.99%
(NTP)
4 hrs - 7 hrs and 59
T less than 4 hrs
mins
Relay to Assistant District Q N/A N/A
Engineer's for initial in 1 day
E 100% 90-99.99%
4 hrs - 7 hrs and 59
T less than 4 hrs
mins
Forward to District Engineer's Q N/A N/A
Office for approval in 1 day
E 100% 90-99.99%
4 hrs - 7 hrs and 59
T less than 4 hrs
mins
Issue to contractor within seven Q N/A N/A
(7) calendar days upon date of
issuance in 7 days E 100% 90-99.99%

T 2 days 4 days - 6 days


Prepared by: Noted by:

EUFRONIA S. CABAYSA MELINDA E. STO. DOMINGO


Chief, Construction Section Engineer III
Officer-in-Charge
Office of the Assistant District Engineer
Republic of the Philippines
T OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE IV - A
T DISTRICT ENGINEERING OFFICE
gy. Abang, Lucban, Quezon

mance Management System Database


ONSTRUCTION SECTION
ND CONTRACT MANAGEMENT UNIT
e period of : January to June 2021

S T A N D A R D S
3 2 1
N/A N/A N/A

80-89.99% 50-79.99% Below 50%

5 mins 5 mins - 8 mins more than 8 mins

Minor Error Major Error

80-89.99% 50-79.99% Below 50%


1 day - 1 day and 4 more than 1 day and
1 day
hrs 4 hrs
Minor Error Major Error

80-89.99% 50-79.99% Below 50%


1 day - 1 day and 4 more than 1 day and
1 day
hrs 4 hrs
Minor Error Major Error

80-89.99% 50-79.99% Below 50%


1 day - 1 day and 4 more than 1 day and
1 day
hrs 4 hrs
N/A N/A N/A

80-89.99% 50-79.99% Below 50%


1 day - 1 day and 4 more than 1 day and
1 day
hrs 4 hrs
N/A N/A N/A

80-89.99% 50-79.99% Below 50%


1 day - 1 day and 4 more than 1 day and
1 day
hrs 4 hrs
N/A N/A N/A

80-89.99% 50-79.99% Below 50%


1 day - 1 day and 4 more than 1 day and
1 day
hrs 4 hrs
N/A N/A N/A

80-89.99% 50-79.99% Below 50%

7 days 8 days - 9 days 9 days or beyond


Approved by:

MA. CHYMBELIN D. IBAL


Engineer IV
Officer-in-Charge
Office of the District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE IV - A
QUEZON 1ST DISTRICT ENGINEERING OFFICE
Brgy. Abang, Lucban, Quezon

Strategic Performance Management System Database


CONSTRUCTION SECTION
PROJECT AND CONTRACT MANAGEMENT UNIT
For the period of : January to June 2021

PROJECT IMPLEMENTATION (For Project Engineers, Project Inspector and Resident Engineers)

Due Date S T A N D A R D S
Major Final Output Success Indicator
(Timeline) 5 4 3
Implementation of FCR All Conduct Pre-Construction Meeting Q N/A N/A N/A
Regular Infrastructure (OO1, with the contractors, end users
OO2) and Other Infrastructure and other concerned bodies in 2 E 100% 90-99.99% 80-89.99%
Projects (CONVERGENCE AND hours
SPECIAL SUPPORT PROGRAM, 1 hr - 1 hr and 59
T less than 1 hr 2 hrs
LOCAL INFRASTRUCTURE mins
PROGRAM, DA, DEPED) Conduct of Stake-Out Survey Q N/A N/A N/A
between the Implementing Office
and Contractor (Joint Survey) in E 100% 90-99.99% 80-89.99%
10 days
5 days - 9 days and
T less than 5 days 10 days
7 hrs
Review As-Staked Plans in 1 day Q N/A N/A N/A

E 100% 90-99.99% 80-89.99%

4 hrs - 7 hrs and 59


T less than 4 hrs 1 day
mins
Check and Endorse As-Staked Q N/A N/A N/A
Plans in 2 hrs
E 100% 90-99.99% 80-89.99%

1 hr - 1 hr and 59
T less than 1 hr 2 hrs
mins
Review PERT-CPM/PDM in 1 day Q N/A N/A N/A

E 100% 90-99.99% 80-89.99%

4 hrs - 7 hrs and 59


T less than 4 hrs 1 day
mins
Check and Endorse Q N/A N/A N/A
PERT-CPM/PDM in 1 day
E 100% 90-99.99% 80-89.99%

4 hrs - 7 hrs and 59


T less than 4 hrs 1 day
mins
Update Geotagged Photos in Q No error Minor Error
Survey 123 Application in 10
minutes E 100% 90-99.99% 80-89.99%

T less than 5 mins 5 mins - 9 mins 10 mins

Prepare and Update Project Q No error Minor Error


Construction Logbook in 1 day
E 100% 90-99.99% 80-89.99%
daily
4 hrs - 7 hrs and 59
T less than 4 hrs 1 day
mins
Prepare and Update Weekly Q No error Minor Error
Statement of Work Accomplished
(SWA) in 1 day every end of E 100% 90-99.99% 80-89.99%
the week
4 hrs - 7 hrs and 59
T less than 4 hrs 1 day
mins
Prepare Variation Order (VO) in 1 Q No error Minor Error
week
E 100% 90-99.99% 80-89.99%

T 2 days 4 days 1 week


Check and endorse Variation Q No error Minor Error
Order (VO) in 1 day
E 100% 90-99.99% 80-89.99%
4 hrs - 7 hrs and 59
T less than 4 hrs 1 day
mins
Prepare Work Suspension Order in Q No error Minor Error
1 day
E 100% 90-99.99% 80-89.99%
4 hrs - 7 hrs and 59
T less than 4 hrs 1 day
mins
Check and endorse Work Q No error Minor Error
Suspension Order (WSO) in 1 day
E 100% 90-99.99% 80-89.99%
4 hrs - 7 hrs and 59
T less than 4 hrs 1 day
mins
Review As-Built plans in 4 days Q N/A N/A N/A
upon
reaching
95% E 100% 90-99.99% 80-89.99%
completion
2 days - 3 days and
of project T less than 2 days 4 days
7 hrs
Check and endorse As-Built plans upon Q N/A N/A N/A
in 2 hours reaching
95% E 100% 90-99.99% 80-89.99%
completion
1 hr - 1 hr and 59
of project T less than 1 hr 2 hrs
mins
Supervise FCR Regular
100% completed
Infrastructure Projects in 100% completed
100% completed with no major and
accordance with the approved Q with no major and 1-
with no defects less than 3 minor
Plans and Specifications to be 2 minor defects
defects
completed by June 30, 2021

E N/A N/A N/A

Completed by May Completed by June Completed by June


T
31, 2021 15, 2021 30, 2021

Supervise FCR Local Infrastructure


100% completed
Projects in accordance with the 100% completed
100% completed with no major and
approved Plans and Specifications Q with no major and 1-
with no defects less than 3 minor
to be completed by June 30, 2021 2 minor defects
defects

E N/A N/A N/A

Completed by May Completed by June Completed by June


T
31, 2021 15, 2021 30, 2021

Supervise DA Projects in
100% completed
accordance with the approved 100% completed
100% completed with no major and
Plans and Specifications to be Q with no major and 1-
with no defects less than 3 minor
completed by June 30, 2021 2 minor defects
defects

E N/A N/A N/A

Completed by May Completed by June Completed by June


T
31, 2021 15, 2021 30, 2021

Prepared by: Noted by: Approved by:

EUFRONIA S. CABAYSA MELINDA E. STO. DOMINGO MA. CHY


Chief, Construction Section Engineer III E
Officer-in-Charge Off
Office of the Assistant District Engineer Office of
of the Philippines
BLIC WORKS AND HIGHWAYS
NAL OFFICE IV - A
RICT ENGINEERING OFFICE
ng, Lucban, Quezon

Management System Database


UCTION SECTION
TRACT MANAGEMENT UNIT
of : January to June 2021

ctor and Resident Engineers)

S T A N D A R D S
2 1
N/A N/A

50-79.99% Below 50%

2 hrs - 3 hrs more than 3 hrs

N/A N/A

50-79.99% Below 50%

10 days - 15 days more than 15 days

N/A N/A

50-79.99% Below 50%

1 day - 1 day and 4 more than1 day and


hrs 4 hrs

N/A N/A

50-79.99% Below 50%

2 hrs - 3 hrs more than 3 hrs

N/A N/A

50-79.99% Below 50%

1 day - 1 day and 4 more than1 day and


hrs 4 hrs
N/A N/A

50-79.99% Below 50%

1 day - 1 day and 4 more than1 day and


hrs 4 hrs

Major Error

50-79.99% Below 50%

10 mins - 15 mins more than 15 mins

Major Error

50-79.99% Below 50%

1 day - 1 day and 4 more than 1 day and


hrs 4 hrs

Major Error

50-79.99% Below 50%

1 day - 1 day and 4 more than 1 day and


hrs 4 hrs

Major Error

50-79.99% Below 50%

8 days 9 days or beyond

Major Error

50-79.99% Below 50%


1 day - 1 day and 4 more than 1 day and
hrs 4 hrs
Major Error

50-79.99% Below 50%


1 day - 1 day and 4 more than 1 day and
hrs 4 hrs
Major Error

50-79.99% Below 50%


1 day - 1 day and 4 more than 1 day and
hrs 4 hrs
N/A N/A

50-79.99% Below 50%

4 days - 6 days more than 6 days


N/A N/A

50-79.99% Below 50%

2 hrs - 3 hrs more than 3 hrs

100% completed
100% completed
with greater than 3
with 1-2 major and
major and greater
1-2 minor defects
than 3 minor defects

N/A N/A

Completed by July Completed by July


15, 2021 31, 2021

100% completed
100% completed
with greater than 3
with 1-2 major and
major and greater
1-2 minor defects
than 3 minor defects

N/A N/A

Completed by July Completed by July


15, 2021 31, 2021

100% completed
100% completed
with greater than 3
with 1-2 major and
major and greater
1-2 minor defects
than 3 minor defects

N/A N/A

Completed by July Completed by July


15, 2021 31, 2021

MA. CHYMBELIN D. IBAL


Engineer IV
Officer-in-Charge
Office of the District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE IV - A
QUEZON 1ST DISTRICT ENGINEERING OFFICE
Brgy. Abang, Lucban, Quezon

Strategic Performance Management System Database


CONSTRUCTION SECTION
PROJECT AND CONTRACT MANAGEMENT UNIT
For the period of : January to June 2021

CONTRACT CLAIMS UNIT

Due Date S T A N D A
Major Final Output Success Indicator
(Timeline) 5 4
Review and Endorse to Chief of Q N/A N/A
Construction Request for Advance
Payment in 2 days E 100% 90-99.99%

T 8 hours 1 day and 4 hours

Prepare other pertinent supporting Q No error


documents for Advance Payment
in 1 day E 100% 90-99.99%
Claims for Payment of All
Regular Infrastructure (OO1, T 4 hours 8 hours
OO2) and Other Infrastructure
Projects (CONVERGENCE AND Prepare Disbursement Voucher
Q No error
SPECIAL SUPPORT PROGRAM, (DV) for Advance Payment in 1
LOCAL INFRASTRUCTURE day
E 100% 90-99.99%
PROGRAM, DA, DEPED)
T 4 hours 8 hours

Certify and Endorse Disbursement


Voucher (DV) for Advance Q N/A N/A
Payment in 1 day
E 100% 90-99.99%

T 4 hours 8 hours
CONTRACT CLAIMS UNIT

Due Date S T A N D A
Major Final Output Success Indicator
(Timeline) 5 4
Review and Endorse to Chief of Q N/A N/A
Construction of Monthly Certificate
of Payment (MCP) and SWA for E 100% 90-99.99%
Progress Billing in 2 days

T 8 hours 1 day and 4 hours

Prepare other pertinent supporting Q No error


documents for Progress Billing in 1
day E 100% 90-99.99%

T 4 hours 8 hours

Prepare Disbursement Voucher Q No error


(DV) for Progress Billing in 1 day
E 100% 90-99.99%

T 4 hours 8 hours

Certify and Endorse Disbursement Q N/A N/A


Voucher (DV) for for Progress
Billing in 1 day E 100% 90-99.99%

T 4 hours 8 hours

Review and Endorse to Chief of Q N/A N/A


Construction of Monthly Certificate
of Payment (MCP) and SWA for E 100% 90-99.99%
Final Payment in 2 days
T 8 hours 1 day and 4 hours

Prepare other pertinent supporting Q No error


documents for Final Payment in 1
day E 100% 90-99.99%

T 4 hours 8 hours

Prepare Disbursement Voucher Q No error


(DV) for Final Payment in 1 day
E 100% 90-99.99%

T 4 hours 8 hours
CONTRACT CLAIMS UNIT

Due Date S T A N D A
Major Final Output Success Indicator
(Timeline) 5 4
Certify and Endorse Disbursement Q N/A N/A
Voucher (DV) for for Final
Payment in 1 day E 100% 90-99.99%

T 4 hours 8 hours

Review and Endorse to Chief of


Construction of Request for Q N/A N/A
Release of Retention in 2 days
E 100% 90-99.99%

T 8 hours 1 day and 4 hours

Prepare other pertinent supporting Q No error


documents for Release of
Retention in 1 day E 100% 90-99.99%

T 4 hours 8 hours

Prepare Disbursement Voucher Q No error


(DV) for Release of Retention in 1
day E 100% 90-99.99%

T 4 hours 8 hours

Certify and Endorse Disbursement Q N/A N/A


Voucher (DV) for Release of
Retention in 1 day E 100% 90-99.99%

T 4 hours 8 hours

Prepared by: Noted by:

EUFRONIA S. CABAYSA MELINDA E. STO. DOMINGO


Chief, Construction Section Engineer III
Officer-in-Charge
Office of the Assistant District Engineer
Republic of the Philippines
T OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE IV - A
T DISTRICT ENGINEERING OFFICE
gy. Abang, Lucban, Quezon

mance Management System Database


ONSTRUCTION SECTION
ND CONTRACT MANAGEMENT UNIT
e period of : January to June 2021

S T A N D A R D S
3 2 1
N/A N/A N/A

80-89.99% 50-79.99% Below 50%

2 days 2 days and 4 hours 3 days

Minor Error Major Error

80-89.99% 50-79.99% Below 50%

1 day 1 day and 4 hours 2 days

Minor Error Major Error

80-89.99% 50-79.99% Below 50%

1 day 1 day and 4 hours 2 days

N/A N/A N/A

80-89.99% 50-79.99% Below 50%

1 day 1 day and 4 hours 2 days


S T A N D A R D S
3 2 1
N/A N/A N/A

80-89.99% 50-79.99% Below 50%

2 days 2 days and 4 hours 3 days

Minor Error Major Error

80-89.99% 50-79.99% Below 50%

1 day 1 day and 4 hours 2 days

Minor Error Major Error

80-89.99% 50-79.99% Below 50%

1 day 1 day and 4 hours 2 days

N/A N/A N/A

80-89.99% 50-79.99% Below 50%

1 day 1 day and 4 hours 2 days

N/A N/A N/A

80-89.99% 50-79.99% Below 50%

2 days 2 days and 4 hours 3 days

Minor Error Major Error

80-89.99% 50-79.99% Below 50%

1 day 1 day and 4 hours 2 days

Minor Error Major Error

80-89.99% 50-79.99% Below 50%

1 day 1 day and 4 hours 2 days


S T A N D A R D S
3 2 1
N/A N/A N/A

80-89.99% 50-79.99% Below 50%

1 day 1 day and 4 hours 2 days

N/A N/A N/A

80-89.99% 50-79.99% Below 50%

2 days 2 days and 4 hours 3 days

Minor Error Major Error

80-89.99% 50-79.99% Below 50%

1 day 1 day and 4 hours 2 days

Minor Error Major Error

80-89.99% 50-79.99% Below 50%

1 day 1 day and 4 hours 2 days

N/A N/A N/A

80-89.99% 50-79.99% Below 50%

1 day 1 day and 4 hours 2 days

Approved by:

MA. CHYMBELIN D. IBAL


Engineer IV
Officer-in-Charge
Office of the District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE IV - A
QUEZON 1ST DISTRICT ENGINEERING OFFICE
Brgy. Abang, Lucban, Quezon

Strategic Performance Management System Database


CONSTRUCTION SECTION
MONITORING AND EVALUATION UNIT
For the period of : January to June 2021

Due Date S T A N D A R D S
Major Final Output Success Indicator
(Timeline) 5 4 3
Canvass and Update Construction Q No error Minor Error
Materials Price Data (CMPD) in 10
before 20th
days E 100% 90-99.99% 80-89.99%
of every
quarter
5 days - 9 days and
T less than 5 days 10 days
Construction Materials Price 7 hrs
Data (CMPD) Check and Endorse Updated Q N/A N/A N/A
Construction Materials District
20th of
Engineer in 1 day E 100% 90-99.99% 80-89.99%
every
quarter
4 hrs - 7 hrs and 59
T less than 4 hrs 1 day
mins
Consolidate Previous billing from Q N/A N/A N/A
the Financial Management Section
in 2 days E 100% 90-99.99% 80-89.99%

T 8 hours 1 day and 4 hours 2 days

Prepare Financial target in 1 day Q No error Minor Error


(monthly) in 1 day
Target Setting for Physical and E 100% 90-99.99% 80-89.99%
Financial (Disbursement)
Accomplishment T 4 hours 8 hours 1 day

Relay Financial Target to Chief of


Construction Section for Q N/A N/A N/A
appropriate actions and approval
in 20 minutes E 100% 90-99.99% 80-89.99%

T 10 minutes 15 minutes 20 minutes


Due Date S T A N D A R D S
Major Final Output Success Indicator
(Timeline) 5 4 3
Submit/forward Approved Q N/A N/A N/A
Financial Target to Financial
Management Section (subjective) E 100% 90-99.99% 80-89.99%
in 20 minutes

T 10 minutes 15 minutes 20 minutes

Consolidate Previous status report Q N/A N/A N/A


from Project Engineer/Resident
Engineer (weekly) in 1 day E 100% 90-99.99% 80-89.99%

T 4 hours 6 hours 1 day


Updating of Project Status
(PCMA) Compile Status report in the Q No error Minor Error
worksheet for records in 4 hours
E 100% 90-99.99% 80-89.99%

T 2 hours 3 hours 4 hours

Prepared Government Q N/A N/A N/A


Projects/Programs/Activities
(GPPA) based on submitted SWA E 100% 90-99.99% 80-89.99%
in 2 days
1 day - 1 day and 7
T less than 1 day 2 days
hrs
Review and Submit GPPA to COAin Q N/A N/A N/A
1 day
Updating of Project Status E 100% 90-99.99% 80-89.99%
(GPPA)
4 hrs - 7 hrs and 59
T less than 4 hrs 1 day
mins
Compile Status report in the Q No error Minor Error
worksheet for records in 4 hours
E 100% 90-99.99% 80-89.99%

T 2 hours 3 hours 4 hours


Due Date S T A N D A R D S
Major Final Output Success Indicator
(Timeline) 5 4 3
Consolidate Project status from Q N/A N/A N/A
the Project Engineer/Resident
Engineer in 5 days E 100% 90-99.99% 80-89.99%

T 3 days 4 days 5 days

Compile Project status to a Q No error Minor Error


worksheet for submission to
Regional Office in 1 day E 100% 90-99.99% 80-89.99%

Updating status of T 4 hours 6 hours 1 day


Infrastructure Project
specifically Variation Order Relaye Project status to Chief of
Consruction for verification in 20 Q N/A N/A N/A
and Time Extension of
Contract Time minutes
E 100% 90-99.99% 80-89.99%

T 10 minutes 15 minutes 20 minutes

Submit Project Status to District Q N/A N/A N/A


Engineer for approval in 20
minutes E 100% 90-99.99% 80-89.99%

T 10 minutes 15 minutes 20 minutes

Prepared by: Noted by: Approved by:

EUFRONIA S. CABAYSA MELINDA E. STO. DOMINGO MA. CHY


Chief, Construction Section Engineer III E
Officer-in-Charge Off
Office of the Assistant District Engineer Office of
of the Philippines
BLIC WORKS AND HIGHWAYS
NAL OFFICE IV - A
RICT ENGINEERING OFFICE
ng, Lucban, Quezon

Management System Database


UCTION SECTION
AND EVALUATION UNIT
of : January to June 2021

S T A N D A R D S
2 1
Major Error

50-79.99% Below 50%

10 days - 15 days more than 15 days

N/A N/A

50-79.99% Below 50%


more than 1 day and
1 day - 1 day and 4 hrs
4 hrs
N/A N/A

50-79.99% Below 50%

2 days and 4 hours 3 days

Major Error

50-79.99% Below 50%

1 day and 4 hours 2 days

N/A N/A

50-79.99% Below 50%

25 minutes 30 minutes
S T A N D A R D S
2 1
N/A N/A

50-79.99% Below 50%

25 minutes 30 minutes

N/A N/A

50-79.99% Below 50%

2 days 3 days

Major Error

50-79.99% Below 50%

6 hours 1 day

N/A N/A

50-79.99% Below 50%

2 days - 3 days more than 3 days

N/A N/A

50-79.99% Below 50%

1 day - 1 day and 4 more than 1 day and


hrs 4 hrs

Major Error

50-79.99% Below 50%

6 hours 1 day
S T A N D A R D S
2 1
N/A N/A

50-79.99% Below 50%

6 days 7 days

Major Error

50-79.99% Below 50%

1 day and 4 hours 2 days

N/A N/A

50-79.99% Below 50%

25 minutes 30 minutes

N/A N/A

50-79.99% Below 50%

25 minutes 30 minutes

MA. CHYMBELIN D. IBAL


Engineer IV
Officer-in-Charge
Office of the District Engineer
Strategic Performance Management System Database
Construction Division

PERFORMANCE EVALUATION SECTION

Due Date S T A N D A R D S
Major Final Output Success Indicator
(Timeline) 5 4 3 2 1
Contractor's Performance rating Q N/A N/A N/A N/A N/A GOOD
receinved from the CPES
inspectorate team from the E 130% 115%-129% 100%-114% 51%-99% 50% below
Central Office in 3 minutes
T 1 minute 2 minutes 3 minutes 4 minutes 5 minutes

Transmittal letter prepared to Q No error with minor revision with major revision
Implementing Office (R.O. DEO)
with no minor revision in 3 days E 130% 115%-129% 100%-114% 51%-99% 50% below

T 1 day 2 days 3 days 4 days 5 days


Disseminate results of
evaluation of Contractor's Transimittal letter forwarded to
Chief of Construction for checking Q N/A N/A N/A N/A N/A
Performance
and approval (initial) in 30
minutes E 130% 115%-129% 100%-114% 51%-99% 50% below

T 10 minutes 20 minutes 30 minutes 45 minutes 1 hour

Transmittal letter forwarded to Q N/A N/A N/A N/A N/A


Records Section for approval of
Regional Director and E 130% 115%-129% 100%-114% 51%-99% 50% below
dissemination in 3 minutes

T 1 minute 2 minutes 3 minutes 4 minutes 5 minutes


Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE IV - A
QUEZON 1ST DISTRICT ENGINEERING OFFICE
Brgy. Abang, Lucban, Quezon

Strategic Performance Management System Database


CONSTRUCTION SECTION
MONITORING AND EVALUATION UNIT
For the period of : January to June 2021

Due Date S T A N D A
Major Final Output Success Indicator
(Timeline) 5 4
Coordinate and assist CPES Q N/A N/A
evaluators and provide all
necessary documents for E 100% 90-99.99%
reference in 1 day
4 hrs - 7 hrs and 59
T less than 4 hrs
mins
CPES Project Evaluation
Assist the contractors during Q N/A N/A
rectification of CPES findings and
observations, and submit pertinent E 100% 90-99.99%
documents and proof of
rectification of works in 2 days 1 day - 1 day and 7
T less than 1 day
hrs
Receive Contractor's Performance Q N/A N/A
rating from the CPES inspectorate
team from the Central Office in 10 E 100% 90-99.99%
minutes
T 6 minutes 8 minutes

Prepare transmittal letter to Q No error


Implementing Office (R.O. DEO) in
1 day & 30 mins E 100% 90-99.99%
Dissemination results/report of
CPES
T within the day 1 day & 20 mins

Forward to Chief of Construction


for checking and approval (initial) Q N/A N/A
in 25 minutes
E 100% 90-99.99%

T 15 minutes 20 minutes

Forward to Records Section for Q N/A N/A


approval of Regional Director and
dissemination in 10 minutes E 100% 90-99.99%

T 6 minutes 8 minutes

Coordinate and assist QAU Q N/A N/A


inspectors and provide all
necessary documents for E 100% 90-99.99%
reference in 1 day
4 hrs - 7 hrs and 59
T less than 4 hrs
mins
QAU Project Evaluation
Assist the contractors during Q N/A N/A
rectification of QAU findings and
observations, and submit pertinent
documents and proof of
rectification of works in 2 days
QAU Project Evaluation Due Date S T A N D A
Major Final Output Assist the contractors
Success during
Indicator
(Timeline) 5 4
rectification of QAU findings and
observations, and submit pertinent E 100% 90-99.99%
documents and proof of
rectification of works in 2 days 1 day - 1 day and 7
T less than 1 day
hrs

Prepared by: Noted by:

EUFRONIA S. CABAYSA MELINDA E. STO. DOMINGO


Chief, Construction Section Engineer III
Officer-in-Charge
Office of the Assistant District Engineer
Republic of the Philippines
T OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE IV - A
T DISTRICT ENGINEERING OFFICE
gy. Abang, Lucban, Quezon

mance Management System Database


ONSTRUCTION SECTION
ORING AND EVALUATION UNIT
e period of : January to June 2021

S T A N D A R D S
3 2 1
N/A N/A N/A

80-89.99% 50-79.99% Below 50%

more than 1 day and


1 day 1 day - 1 day and 4 hrs
4 hrs

N/A N/A N/A

80-89.99% 50-79.99% Below 50%

2 days 2 days - 3 days more than 3 days

N/A N/A N/A

80-89.99% 50-79.99% Below 50%

10 minutes 12 minutes 13 minutes & beyond

Minor Error Major Error

80-89.99% 50-79.99% Below 50%


1 day & 40 minutes
1 day & 30 mins 1 day & 35 mins
beyond

N/A N/A N/A

80-89.99% 50-79.99% Below 50%

25 minutes 30 minutes 35 minutes beyond

N/A N/A N/A

80-89.99% 50-79.99% Below 50%

10 minutes 12 minutes 13 minutes & beyond

N/A N/A N/A

80-89.99% 50-79.99% Below 50%

more than 1 day and


1 day 1 day - 1 day and 4 hrs
4 hrs

N/A N/A N/A


S T A N D A R D S
3 2 1
80-89.99% 50-79.99% Below 50%

2 days 2 days - 3 days more than 3 days

Approved by:

MA. CHYMBELIN D. IBAL


Engineer IV
Officer-in-Charge
Office of the District Engineer
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE IV - A
QUEZON 1ST DISTRICT ENGINEERING OFFICE
Brgy. Abang, Lucban, Quezon

Strategic Performance Management System Database


CONSTRUCTION SECTION
For the period of : January to June 2021

CORRESPONDENCE

Due Date S T A N D A
Major Final Output Success Indicator
(Timeline) 5 4
Receive instruction from Chief of
Q N/A N/A
Construction for the proper
actions in 10 minutes
E 100% 90-99.99%

T 6 minutes 8 minutes

Prepare communication
Q No error
letters/memoranda to/for various
concerned Offices/persons in 1
day and 30 mins E 100% 90-99.99%

T within the day 1 day & 20 mins


Accomplished Correspondence
Relay to Chief of Construction
Q N/A N/A
Section for checking and approval
(initial) in 25 mins
E 100% 90-99.99%

T 15 minutes 20 minutes

Check and approve (initial)


Q N/A N/A
communication letters in 10 mins

E 100% 90-99.99%

T 6 minutes 8 minutes
Submit/Forward to District
Q N/A N/A
Engineer's Office for approval in
10 mins
E 100% 90-99.99%

T 6 minutes 8 minutes

Receive various outgoing


Q N/A N/A
documents from different offices
and agencies in 10 mins
E 100% 90-99.99%

T 6 minutes 8 minutes

Record details of the documents in


Q N/A N/A
25 mins

E 100% 90-99.99%

T 15 minutes 20 minutes

Forward the documents to Chief of


Incoming Documents
Construction Section for the
Q N/A N/A
appropriate actions in 15 mins

E 100% 90-99.99%

T 5 minutes 10 minutes

Delegate/transmit the necessary


job/actions to the concern person Q N/A N/A
as instructed by the Chief of
Construction Section from 8:00 E 100% 90-99.99%
am to 9:00 am the following day

T within the day

Receive the documents/actions


Q N/A N/A
taken by the concern person in 15
mins
E 100% 90-99.99%

T 5 minutes 10 minutes

Relay to Chief of Construction


Q N/A N/A
Section for appropriate
actions/signatories in 25 mins
Outgoing Documents E 100% 90-99.99%

T 15 minutes 20 minutes

Record details of the documents in


15 mins
Q N/A N/A

E 100% 90-99.99%

T 5 minutes 10 minutes

Release/Transmit the documents


to concern person from 8:00 am Q N/A N/A
to 9:00 am the following day
E 100% 90-99.99%
to concern person from 8:00 am
to 9:00 am the following day

T within the day

in accordance with
Q Implementation of
DoTS for Civil Works
Project
Accept/Receive documents into the
DoTS DoTS and forward the same to the
concerened office in 1 day & 30 mins E 100% 90-99.99%

T within the day 1 day & 20 mins

Q No error

Encode Draft letters of Chief of


Encoding of Correspondence/
Construction Section in 1 day & 30
Memorandum E 100% 90-99.99%
mins

T within the day 1day 20 mins


Q N/A N/A

Receive incoming calls from


Receive Incoming calls different offices and agencies in
E 100% 90-99.99%
10 minutes

T 6 minutes 8 minutes

Prepared by: Noted by:

EUFRONIA S. CABAYSA MELINDA E. STO. DOMINGO


Chief, Construction Section Engineer III
Officer-in-Charge
Office of the Assistant District Engineer
Republic of the Philippines
T OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE IV - A
T DISTRICT ENGINEERING OFFICE
gy. Abang, Lucban, Quezon

ormance Management System Database


CONSTRUCTION SECTION
e period of : January to June 2021

S T A N D A R D S
3 2 1

N/A N/A N/A

80-89.99% 50-79.99% Below 50%

10 minutes 12 minutes 13 minutes & beyond

Minor Error Major Error

80-89.99% 50-79.99% Below 50%

1 day & 30 mins 1 day & 35 mins 1 day & 40 minutes


beyond

N/A N/A N/A

80-89.99% 50-79.99% Below 50%

25 minutes 30 minutes 35 minutes beyond

N/A N/A N/A

80-89.99% 50-79.99% Below 50%

10 minutes 12 minutes 13 minutes & beyond


N/A N/A N/A

80-89.99% 50-79.99% Below 50%

10 minutes 12 minutes 13 minutes & beyond

N/A N/A N/A

80-89.99% 50-79.99% Below 50%

10 minutes 12 minutes 13 minutes & beyond

N/A N/A N/A

80-89.99% 50-79.99% Below 50%

25 minutes 30 minutes 35 minutes beyond

N/A N/A N/A

80-89.99% 50-79.99% Below 50%

15 minutes 20 minutes 25 minutes beyond

N/A N/A N/A

80-89.99% 50-79.99% Below 50%

8:00am to 9:00am Beyond 9:00 am the


the following day next day

N/A N/A N/A

80-89.99% 50-79.99% Below 50%

more than 25
15 minutes 25 minutes
minutes

N/A N/A N/A

80-89.99% 50-79.99% Below 50%

25 minutes 30 minutes 35 minutes beyond

N/A N/A N/A

80-89.99% 50-79.99% Below 50%

15 minutes 20 minutes 25 minutes beyond

N/A N/A N/A

80-89.99% 50-79.99% Below 50%


8:00am to 9:00am Beyond 9:00 am the
the following day next day

not in accordance with


Implementation of
DoTS for Civil Works
Project

80-89.99% 50-79.99% Below 50%

1 day & 40 minutes


1 day & 30 mins 1 day & 35 mins
beyond

Minor Error Major Error

80-89.99% 50-79.99% Below 50%

1day 40 minutes
1day 30 mins 1day 35 mins
beyond
N/A N/A N/A

80-89.99% 50-79.99% Below 50%

10 minutes 12 minutes 13 minutes & beyond

Approved by:

MA. CHYMBELIN D. IBAL


Engineer IV
Officer-in-Charge
Office of the District Engineer
Major Final Output Success Indicator
Stake-Out Survey was scheduled and conducted between the Implementing Office and Contractor with
no error (Joint Survey) in 1 week

Pre Construction Meeting was scheduled and convened with the Contractor, LGU, Brgy. Officials in 3 days
MFO 1 - National Road Network
Services - Network Development Project documents such as logbook, activity report, accomplishment and possible suspension orders
- Construction of
By-passess/Diversion Roads, prepared with no revision in 1 day (weekly report)
including ROW - Construction of
Sariaya By-Pass, including Bridge, SWA/other doc. prior to monthly billing checked with no revision in 1 day
Sariaya, Quezon Province
SWA/other doc. checked with no minor revision prior to monthly billing in 1 day

Variation Order/As-Built plans checked with recommendation and no revision in 1 week

DUPA (materials, equipment and manpower), POW and ABC, Plans checked with no minor revisions in 1
day
Findings/comments relayed to Chief of Construction Division/Head of TWG for proper actions in 1 hour

Checking of POW and ABC, (DEO Findings/comments were coordinated with the concern person in 2 hours (if necessary)
project)
Transmittal prepared to DEO stating the findings/comments with no minor revision in 2 hours (if
necessary)
POW and ABC approved if no corrections in 1 hour and 40 minutes

Documents as per D.0 156, series 2015 checked with no minor error in 4 hours

Findings/comments relayed to Chief of Construction Division/Head of TWG for proper actions in 1 hour

Checking of Suspension Order, Findings/comments were coordinated with the concern person in 2 hours (if necessary)
(DEO project)
Transmittal prepared to DEO stating the findings/comments with no minor revision in 2 hours (if
necessary)
POW and ABC approved if no corrections in 1 hour and 40 minutes

DUPA (materials, equipment and manpower) of additional new item of works and supporting documents
checked with no minor error in 3 days
Pre Clearance checked in 4 hours prior to reason of changes/variation of quantities

Checking of Variation Order (DEO Findings/comments relayed to Chief of Construction Division/Head of TWG for proper actions in 1 hour
project)
Findings/comments were coordinated with the concern person in 2 hours (if necessary)

Transmittal prepared to DEO stating the findings/comments (if necessary) with no minor revision in 2
hours
Variation Order approved in 1 hour and 40 minutes if no corrections
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE IV - A
QUEZON 1ST DISTRICT ENGINEERING OFFICE
Brgy. Abang, Lucban, Quezon

Strategic Performance Management System Database


CONSTRUCTION SECTION
For the period of : January to June 2021

SERVICE VEHICLE DRIVER

Due Date S T A N D A R D S
Major Final Output Success Indicator
(Timeline) 5 4 3
Request was coordinated to Supply Unit Q N/A N/A N/A
regarding the Diesel allowance and trip
E 100% 90-99.99% 80-89.99%
ticket in 30 minutes
T 10 minutes 20 minutes 30 minutes
P.O was submitted to Chief of Construction Q N/A N/A N/A
Section for checking and approval in 15
E 100% 90-99.99% 80-89.99%
minutes
T 5 minute 10 minutes 15 minutes
Requisition of Diesel
Allowance and trip ticket P.O was submitted to Chief of Supply Unit Q N/A N/A N/A
for approval in 15 minutes
E 100% 90-99.99% 80-89.99%

T 5 minute 10 minutes 15 minutes

P.O was submitted to Assistant District Q N/A N/A N/A


Engineer for final approval in 15 minutes
E 100% 90-99.99% 80-89.99%

T 5 minute 10 minutes 15 minutes


Service vehicle checked to ensure if it is in Q N/A N/A N/A
good running condition in 30 minutes E 100% 90-99.99% 80-89.99%
T 10 minutes 20 minutes 30 minutes
Damage/Defects changed/repaired with no Q No error Minor Error
error in 2 hours (if necessary and E 100% 90-99.99% 80-89.99%
subjective)
1 hour and 30
T 1 hour 2 hours
minutes
Vehicle Maintenance
Buy spare parts bought that needs for Q N/A N/A N/A
alteration in 2 hours(if necessary) E 100% 90-99.99% 80-89.99%
1 hour and 30
T 1 hour 2 hours
minutes
Receipt was coordinated and submitted for Q N/A N/A N/A
reimbursement signed by Chief of E 100% 90-99.99% 80-89.99%
Construction in 30 minutes
T 10 minutes 20 minutes 30 minutes
Reciept was submitted to EMD and Supply Q N/A N/A N/A
Unit for approval in 15 minutes E 100% 90-99.99% 80-89.99%
T 5 minutes 10 minutes 15 minutes
Vehicles driven to the location that have Q N/A N/A N/A
been instructed by Chief of Construction E 100% 90-99.99% 80-89.99%
Transportation for Chief
Section 30 minutes
of Construction Section 1 hour ahead of
T ahead of on time
schedule
schedule

Prepared by: Noted by: Approved by:

EUFRONIA S. CABAYSA MELINDA E. STO. DOMINGO MA. CHY


Chief, Construction Section Engineer III En
Officer-in-Charge Offic
Office of the Assistant District Engineer Office of th
ublic of the Philippines
F PUBLIC WORKS AND HIGHWAYS
GIONAL OFFICE IV - A
STRICT ENGINEERING OFFICE
Abang, Lucban, Quezon

nce Management System Database


NSTRUCTION SECTION
iod of : January to June 2021

S T A N D A R D S
2 1
N/A N/A
50-79.99% Below 50%

40 minutes 1 hour
N/A N/A
50-79.99% Below 50%
25 minutes or
20 minutes
beyond
N/A N/A
50-79.99% Below 50%
25 minutes or
20 minutes
beyond
N/A N/A
50-79.99% Below 50%
25 minutes or
20 minutes
beyond
N/A N/A
50-79.99% Below 50%
40 minutes 1 hour
Major Error
50-79.99% Below 50%
2 hours and 30
3 hours or beyond
minutes
N/A N/A
50-79.99% Below 50%
2 hours and 30
3 hours or beyond
minutes
N/A N/A
50-79.99% Below 50%

40 minutes 1 hour
N/A N/A
50-79.99% Below 50%
20 minutes 25 minutes
N/A N/A
50-79.99% Below 50%

30 minutes late of 1 hour late of


schedule schedule or beyond

MA. CHYMBELIN D. IBAL


Engineer IV
Officer-in-Charge
Office of the District Engineer