Ipcr Jan To June 2022

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 9

INDIVIDUAL

PERFORMANCE
COMMITMENT AND
REVIEW (IPCR)
I, DECS S. DEL CARMEN of the
Local Disaster Risk Reduction
and Management Office commit
to deliver and agree to be rated
on the attainment of the
following targets in accordance
with the indicated measures for
the period January to June 2022.

Date
Received Date Approved by Date
ARIEL M ALAG

ENGR. JOSE MIGUEL M.


LDRRMO III Head
MIRAFLORES
of Agency

MFO/PAP Success Indicator Actual Accomplishment Rating


Output
(Target & Measure) Q1
Strategic Priority No: Effective
and efficient delivery of basic
services and good governance
Output 1
Output 2
Core Function:
1. DISASTER PREVENTION Protection Intervention
AND MITIGATION Updates and improve Evaluate, monitor, and update 8 5
SERVICES municipal disaster risk municipal disaster risk reduction
reduction management and management and climate change
climate change adaptation adaptation plan C.Y. 2021-2023
plan. of the Municipality of Ibajay
yearly
Updates and realigning Update, approve, and
contingency plans (top 2 realignment of contingency
hazards) flood and tropical plans (top 2 hazards) flood
cyclone w/ covid19 and tropical cyclone w/ 2 5
pandemic standard covid19 pandemic standard
operating procedure. operating procedure.
Conduct and facilitates seminars Conduct information education
and trainings in disaster and communication (IEC) on
preparedness and ecological solid waste management
solid waste management and (ESWM) and forest land used 35 5
forest land used plan plan in 35 barangays.

Vulnerability and Risk


Assessment for Ground shake No. of barangays data gathered 4 5
hazards

Reproduction of materials for


Information, Education and
Awareness Campaign on all
No. of Vulnerable Areas
vulnerable sectors (Forums, 36 5
conducted with IEC.
Flyers, Gabay at Mapa ng
Listong Pamilyang Pilipino and
Tarpaulins)

Early Warning System

Installation of Early warning No. of Early warning signage’s


signage’s to flooding/landslide to flooding/landslide and
10  5  5
and vehicular accident prone vehicular accident prone area
areas installed.
Establishment of indigenous
No. of Established early warning
early warning device in selected 6 5
device in far-flung barangays.
Barangays

2. DISASTER Mobilization Plan


PREPAREDNESS SERVICES
No. of Barangays were informed
Conduct of BDRRM Planning
and have shared goals and
Training in 35 Barangays
objectives in DRRM
Brgy. Captains and MDRRMO
Conduct of Basic ICS Training
Staff trained with Basic Incident 40 5
for Barangay/Community Level
Command System
Implementation of Information No. of Barangay & School level
board-Barangay and School establish information board on 35 5
Level solid waste and drrm.
Participation to Provincial,
Regional and National DRR-
at least 2 activities participated 1 5
CCA related activities (e.g.
SIMEX & NSED)

Maintenance of Early Warning No. of Early Warning Systems


10 5
Systems (ARGs/WLMS) maintained

Stockpiling/Facilities and
System

Stockpiling of Food and Non- No. of food and non-food packs


125 5 4
food supplies stockpiled
Purchase of Search and Rescue Percentage. of Search and 75% 5
and life-saving Equipment Rescue and life-saving
(Hazard Materials response Equipment’s (Hazard Materials
equipment) response equipment)
No. of Responder with Handheld
Hand Held Radios Radios
20 5 4

Mobilization
100% or 4 Bloodletting Activity
Bloodletting Activity conducted quarterly
2 4 4
3. DISASTER RESPONSE No. of patients (including
SERVICES Rescue Vehicle services corpses) transported by rescue 157 5
vehicle
Rescue
Towing/Wrecker Services No. of vehicle towed 16 5 5
Emergency Operation No. of Emergency cases
60 5
Response responded
Relief Distribution
Provision of assistance to
No. of clients provided with food
walk-in clients (victims of 69 5 5
or non-food assistance
calamity)
at least 30 SAR volunteers
Insurance of SAR volunteers’ provided with insurance
39 5
100% or 4 Incident reports
submitted to offices and
No. of incident report facilitated 5 5 5
agencies concerned for
assistance generation

Resumption of normal social


and economic activities of the No. of families provided with
16 5
families affected through livelihood program
livelihood programs
4. DISASTER
REHABILITATION &
RECOVERY SERVICES

Final Average Rating


Comments and Recommendation Date Reviewed by: Date  Final Rating by Date
for Development Purposes

Discussed with:   I certify that I discussed of the performance


with the employee
ENGR.
DECS S. DEL CARMEN MA. JEANETTE IDA IRIS Y. MIRAFL
MIROY
Employee Supervisor
Legend 1-Quantity
2-Efficiency 3-
Timeless 4-
Average

INDIVIDUAL
PERFORMANCE
COMMITMENT AND
REVIEW (IPCR)

I, DECS S. DEL
CARMEN,
ADMINISTRATIVE AIDE III
(RESEARCH AND
PLANNING DESIGNATE)
of the MUNICIPAL
DISASTER RISK
REDUCTION AND
MANAGEMENT OFFICE
AND MUNICIPAL
ENVIRONMENTAL AND
NATURAL RESOURCE
OFFICE commit to deliver
and agree to be rated on
the attainment of the
following targets in
accordance with the
indicated measures for the
period January to June
2022.

DECS S. DEL CARMEN

Ratee
Date

ENGR. JOSE MIGUEL M. Approved by:


MIRAFLORES Date:

ENGR. JOSE MIGUEL M.


MIRAFLORES
Municipal Mayor
Reviewed by:

MA.JEANETTE IDA IRIS


Y. MIROY Date
Date
MA.JEANETTE IDA IRIS
Y. MIROY
MPDO ENGR. JOSE MIGUEL M.
MIRAFLORES Approved by:

ENGR. JOSE MIGUEL M.


MIRAFLORES
Municipal Mayor

ENGR. JOSE MIGUEL M.


MA.JEANETTE IDA IRIS MIRAFLORES
Y. MIROY Municipal Mayor
MPDO

You might also like