1 2 3 4 5 6 7 8 9
A BOOTH PEMKAB SORONG
A.1 BOOTH
1 level melamin 3m x 6m x 0,10m 18 m2 1 time 1 time Rp 750,000 Rp 13,500,000
2 Modul Backdrop belakang finishing printing 18 m2 1 Pack 1 time Rp 500,000 Rp 9,000,000
3 plafon atap melaminto 18 m2 1 time 1 time Rp 750,000 Rp 13,500,000
4 Meja Booth custom 2 Unit 1 time 1 time Rp 2,000,000 Rp 4,000,000
5 Pigora Foto 6 Unit 1 time 1 time Rp 650,000 Rp 3,900,000
A.2 Lighting
1 downlight 5watt 9 Unit 1 time 1 time Rp 400,000 Rp 3,600,000
2 spot light 7 watt 9 Unit 1 time 1 time Rp 350,000 Rp 3,150,000
3 led strip 20 m 1 time 1 time Rp 150,000 Rp 3,000,000
4 stop kontak 3 Titik 1 time 1 time Rp 150,000 Rp 450,000
5 tulisan akrilic pemkab sorong neon text 12 huruf 1 time 1 time Rp 800,000 Rp 9,600,000
A.3 LAYOUT DESIGN
1 desain layout 1 Pack 1 time 1 time Rp 3,000,000 Rp 3,000,000
B.2 Lighting
1 downlight 5watt 9 Unit 1 time 1 time Rp 400,000 Rp 3,600,000
2 spot light 7 watt 9 Unit 1 time 1 time Rp 350,000 Rp 3,150,000
3 led strip 20 m 1 time 1 time Rp 150,000 Rp 3,000,000
4 stop kontak 3 Titik 1 time 1 time Rp 150,000 Rp 450,000
5 tv50" 1 Unit 2 day 1 Event Rp 1,500,000 Rp 3,000,000
C.2 Lighting
1 downlight 5watt 9 Unit 1 time 1 time Rp 400,000 Rp 3,600,000
2 spot light 7 watt 11 Unit 1 time 1 time Rp 350,000 Rp 3,850,000
3 led strip 20 m 1 time 1 time Rp 150,000 Rp 3,000,000
4 stop kontak 3 Titik 1 time 1 time Rp 150,000 Rp 450,000
5 LED TV 50" 1 Unit 2 Day 1 Event Rp 1,500,000 Rp 1,500,000
E.2 Lighting
1 spot light 7 watt 30 Unit 1 time 1 time Rp 350,000 Rp 10,500,000
2 led strip 50 m 1 time 1 time Rp 150,000 Rp 7,500,000