Client Abu Dhabi Department of Education and Knowledge Project Name Refurbishment of Al Khanoor & Al Hwaiteen Schools Discipline

oject Name Refurbishment of Al Khanoor & Al Hwaiteen Schools Discipline CIVIL


Contractor Hydropower Energy & General Construction Risk Assessment Reference PRO-ALT-HPEC-MSS-RA-00 Date 18/06/2022
No
Employer Provis Integrated Management Services Risk Assessment for False ceiling
Engineer Al Torath International Engineering

S.No Activity Element Who might be harmed Hazards Consequences Risk Classification Risk Action to be taken to reduce risk Responsible Revised Risk Residual Legal
Level person Classification Risk Reference
(P) (S) (R) (P) (S) (R) L/M/H
PxS PxS
 Competent operator to transport/unload materials in site premises
Workers/foreman/ Property Damage /
Personal injury  Ensure the good positioning of machine/ equipment, taking into account of workplace
Transporting Supervisor Fall of Materials condition and proximity hazards wherein no other workers are allowed nearby operation. Site Eng/
1. (e.g. fracture, 3 3 9 H 1 1 3 Low
/Engineers/  Provision of a competent banks man during unloading, warning signs and barriers within a foreman/HSE
intracranial
inspectors/visitors variable working area
hemorrhage)
 Close supervision
 Ensure all drivers and operators are well experienced and with valid UAE license along
with valid third party certificate. The Crane should have valid UAE registration along with
approved third party certificate in place.
 Obtain a lifting permit from main contractor.
 Crane has valid 3rd party inspection certification along with UAE valid registration -
Licensed and competent crane / shovel operator should be available.
 All lifting equipment shall be 3rd party inspected and certified as fit for purpose, the lifting
Lifting works Un authorized activity shall be controlled by trained competent rigger (approved third party certificate
personnel. holder) along with foreman full time till completion of the activity.
 And to ensure the correct load rating and never exceed the load limit as per mentioned in
the permit/load chart of the Crane. (SWL).
Illegal operation/activity.  Use tag line to control the load.
 The work area should be properly compacted, and the Crane should locate away from the
edge of the trench/excavations.
Un approved equipment/operator/Rigger.
 Ensure the Crane swing area should be clear from personnel and equipment. This should
be properly controlled by flag man, competent Rigger. The work area should be properly
Lifting and swinging. demarcated with warning signs.
 Ensure the radius of the Crane is right as per the lifting plan and never over reach beyond
Head/foot injury/ that point as per mentioned in the lifting plan. Also to ensure the LMI of the Crane is
Crane overturning OSHAD SF
Shifting, handling and Workers/foreman/ working properly. Float pad of each out riggers shall be used. Use tag line for to control Site Eng/
2. Personnel injury, 4 4 16 E 1 4 4 Moderate CoP -34.0,
storage supervisor the load. Foreman/HSE
Property damage  Traffic to be controlled and Flagman & banks man to be posted at required locations. 53.0
Crane failure  No unauthorized entry, pedestrian path to be identified and provided accordingly.
 Use proper restraining devices and procedure. Never stand or rest under or near any
Failure of lifting equipment & Rigging suspended load.
Equipment.  Always be clear from the Crane swing area.
 Proper supervision of concern supervisor required in the work area.
 Use of certified lifting equipment, tools, tackles and restraining accessories. Ensure the
Noncompliance of PPE. lifting eye of the cable drum was approved prior to lifting.
 Use of trained and experienced personnel
 Use mandatory PPE, never wear loose clothing.
 Area should be properly barricaded. Shifting of Steel Reinforcement use by towing trucks,
Adverse weather conditions. boom trucks, or adequate transportation shall be obtained. This shall be controlled by
proper supervision along with dedicated banks man always. Personnel should away from
the cable drum while shifting/loading in progress. Third party approved lifting device, lifting
eye, rigging accessories ec to be used with competent third party approved rigger/
supervisor.
Safety precautions during foggy weather, sandstorm, heavy rains.No operation during poor
visibility, sandstorm and strong wind. Ensure wind speed should be monitored. STOP the
lifting operation if wind exceeds the 38km/hr.
Property Damage/  A project-specific emergency plan established Emergency plan reviewed periodically
serious injury. throughout the life of the project The emergency procedure included in the induction and
reiterated in briefings and Toolbox talks.
Workers/ foreman/
 All work locations to have clear signage for emergency assembly points. PM/CM/ Site OSHAD-
Emergency supervisor/ Worsening of an
3. Engineers/ Poor emergency procedures 3 3 9 H  Emergency contact details posted on site notice boards and office bulletin boards Trained 1 3 3 Low SFCoP
incident if dealt Eng/ foreman/
Situations inspectors/ visitors/ First Aiders available throughout the site Trained fire wardens available throughout the
with incorrectly HSE – 53.0
public site.
, Fire points / first aid boxes available throughout the site Scheduled emergency drills
Disruption to Liaison with civilian emergency services (ambulance, Police, & Civil defense) All
project Emergency responders to have specific training
Un authorized personnel &
equipment.

Un certified personnel.  Ensure all equipment have available with Valid UAE vehicle license, operators should
have valid UAE license, approved third party competency certificates prior to mobilize on
site. Also, should obtain authorization (Gate Pass) from the main contractor / consultant
Failure of safety device of the engineer prior to enter in the site. Daily Tool box talks to be conducted by area foreman.
equipment.  Loading and unloading area should be identified and approved.
 Ensure the maintenance records should keep on the equipment for reference.
 PPE to be worn at all times (HV Jacket) NO EXCEPTIONS.
In adequate maintenance.  Regular maintenance should be carried out to ensure no any deficiencies of equipment.
Property  Designated routes to be set up, dedicated parking area etc to be placed. Do not walk Site Eng/ OSHAD
Mobilization of Workers/foreman/
damage. across the path of any Plant/Machinery. Pedestrian walk way should be provided. foreman/ SF CoP -
4. Equipment; Man Lift, supervisor/Operators/ Non-compliance e of PPE. 3 5 15 E 1 5 5 Moderate
personnel  Minimize the reversing especially long reversing and to ensure the reversing of the operator/ 2.0,
boom loader banksman
injury equipment, heavy trucks at site shall be controlled by trained competent banks man and banksman 3.0, 34.0
In adequate maintenance. all vehicles to be fitted with audible reverse alarms.
 Provision of adequate signage to be added as a control measure if required.
 Comply with the noise monitoring requirements. Use adequate ear plug or ear muff.
Accident with adjacent moving  Dust suppression should be followed, dust mask to be delivered to the working crews as
Vehicles Reversing of equipment. PPE requirement.
 Proper housekeeping must be maintained at all the time at the work site.
Access must be cleared from construction debris/other obstructions. Designated points
Noise and Vibration Emission of Dust should be marked along with adequate signs.
Presence of unwanted/ excess materials.

Loading and unloading


Any worker who uses
Electricity faulty equipment or Burns, heart  Don’t work on live equipment, isolation and multi lock system shall be followed.
electrical installations fibrillation, and  Don’t hang any material on electrical equipment. Site Eng/
5. on the job site, such Electric shock burns death are the most 5 4 20 EH  Handling of electrical equipment or switchgear shall not be done with wet hand or body. 2 4 8 MAJOR
Electrical equipment as plugging likely foreman/ HSE
 Electrical switches or access to them shall not block by any material.
equipment into a consequences.  Use appropriate PPE while working on electrical equipment.
faulty socket.
Un authorized personnel &
equipment.

Un certified personnel.  Ensure all equipment have available with Valid UAE vehicle license, operators should
have valid UAE license, approved third party competency certificates prior to mobilize on
site. Also, should obtain authorization (Gate Pass) from the main contractor / consultant
Failure of safety device of the engineer prior to enter in the site. Daily Tool box talks to be conducted by area foreman.
equipment.  Loading and unloading area should be identified and approved.
 Ensure the maintenance records should keep on the equipment for reference.
 PPE to be worn at all times (HV Jacket) NO EXCEPTIONS.
In adequate maintenance.  Regular maintenance should be carried out to ensure no any deficiencies of equipment.
Property  Designated routes to be set up, dedicated parking area etc to be placed. Do not walk Site Eng/ OSHAD
Mobilization of Workers/foreman/
damage. across the path of any Plant/Machinery. Pedestrian walk way should be provided. foreman/ SF CoP -
6. Equipment; Man Lift, supervisor/Operators/ Non-compliance e of PPE. 3 5 15 E 1 5 5 Moderate
personnel  Minimize the reversing especially long reversing and to ensure the reversing of the operator/ 2.0,
boom loader banksman
injury equipment, heavy trucks at site shall be controlled by trained competent banks man and banksman 3.0, 34.0
In adequate maintenance. all vehicles to be fitted with audible reverse alarms.
 Provision of adequate signage to be added as a control measure if required.
 Comply with the noise monitoring requirements. Use adequate ear plug or ear muff.
Accident with adjacent moving  Dust suppression should be followed, dust mask to be delivered to the working crews as
Vehicles Reversing of equipment. PPE requirement.
 Proper housekeeping must be maintained at all the time at the work site.
 Access must be cleared from construction debris/other obstructions. Designated points
Noise and Vibration Emission of Dust should be marked along with adequate signs.
Presence of unwanted/ excess materials.

Loading and unloading


7. Fire All workers and Preventative control measures, as well as may sustain burns 5 4 20 EH  Provide adequate means of escape. Site Eng/ 2 4 8 MAJOR
visitors to the site control measures to mitigate fire damage, and/or smoke  Outline clear pathways to exit doors. foreman/ HSE
are in place. These are tested and inhalation injuries.  Install smoke detection systems.
maintained on a regular basis. If anyone becomes  Good Housekeeping in the workplace
trapped in the
stores and is
There is a thorough fire risk assessment in unable to be
place that addresses all these concerns.
rescued, the worst-
case situation is
Emergency procedures are tested on a death.
regular basis
Bruising,
sprains/strains,
fractures, or more
serious injuries,
Working at height such as head or  Change to a safe work system that includes a risk assessment before work begins.
Anyone who is
working on the site. internal injuries,  Risk assessment will be added to the worksheet tick list. Site Eng/
8. Full down 4 4 16 EH 1 4 4 Moderate
Working on the top of are likely  Reduce the worker's potential fall distance. foreman/ HSE
scaffolding depending on the  Prevent falls by working in a secure environment.
severity of the fall
(the height from
which the fall
occurred).

Risk Grading Matrix


SEVERITY
PROBABILITY
MINOR (2) MODERATE (3) MAJOR (4) CATASTROPIC (5)
INSIGNIFICANT (1)

Rate (1) 1 2 3 4 5

Possible (2) 2 4 6 8 10

Likely (3) 3 6 9 12 15

Often (4) 4 8 12 16 20

Frequent / Almost certain (5) 5 10 15 20 25

Absolutely Unacceptably High


15-25 Extreme Risk
Activity or process Should not proceed in current form
Unacceptably High
8-12 High Risk Activity or process should be modified to include remedial planning and action and be subject to detailed
EHS risk assessment
Acceptable but must be managed at “As Low As Reasonably Practicable” (ALARP) Activity or process can
4-6 Moderate Risk
operate subject to management and / or modification
Acceptable without required further action
1-3 Low Risk
No action required unless escalation of risk is possible

Hierarchy of Control (Controls identified may be a mixture of the hierarchy in order to provide minimum operator exposure):
Elimination Eliminate the hazard.
Substitution Provide an alternative that is capable of performing the same task and is safer to use.
Engineering Controls Provide or construct a physical barrier or guard or technical measures
Administrative Controls Develop policies, procedures practices and guidelines, in consultation with employees, to mitigate the risk. Provide
training, instruction and supervision about the hazard.
Personal Protective Equipment Personal equipment designed to protect the individual from the hazard
Prepared by: Prathaban Ponnusamy Reviewed by ; Oday Melhem
Designation : Project Engineer Designation : Project Manager
Signature :
Date : 10/06/2022
Signature :
Date : 10/06/2022