CDU/VDU PSV LIST :-

PSV Tag Set.Pr. PSV Upstream


Service
no. Kg/cm2 g B/V

1101 E-101A Shell O/L 34 LO


1102 E-101B Shell O/L 34 LO
1103 P-143Discharge 34 LO
1201 E-102A Shell O/L 34 LO
1202 E-102B Shell O/L 34 LO
1203 E-102C Shell O/L 34 LO
1204 E-102D Shell O/L 34 LO
1301 E-130 Shell O/L 34 LO
1302 E-103 Shell O/L 34 LO
1303 E-104 A Shell O/L 34 LO
1304 E-104 B Shell O/L 34 LO
1305 E-105A Shell O/L 34 LO
1306 E-105B Shell O/L 34 LO
1307 E-106A Tube O/L 80.5 LO
1308 E-106B Tube O/L 80.5 LO
1401 501-LZ-101 32.7 LC
1402 501-LZ-101 32.7 LO
1403 E-147A/B Shell O/L 31 LO
1404 E-147C Shell O/L 31 LO
1405 E-148A/B Tube O/L 8.7 LO
1406 E-158A Tube O/L 31 LO
1407 E-158B Tube O/L 31 LO
1501 501-LZ-102 32.7 LO
1502 501-LZ-102 32.7 LO
1580A LO AOP(501-P-104A) 10 NA
1580B LO AOP(501-P-104B) 10 NA
1580C LUBE OIL AOP(501-P-104C) 10 NA
1581A LUBE OIL MOP(501-P-104A) 10 NA
1581B LUBE OIL MOP(501-P-104B) 10 NA
1581C LUBE OIL MOP(501-P-104C) 10 NA
1601 E-120B Shell O/L 80.5 LO
1602 E-107 Shell O/L 80.5 LO
1603 E-108 Shell O/L 80.5 LO
1604 E-109A/B Shell O/L 80.5 LO
1605 E-120A Shell O/L 80.5 LO
1701 E-110A/B Tube O/L 80.5 LO
1702 E-110C Tube O/L 80.5 LO
1703 E-111A Tube O/L 80.5 LO
1704 E-111B Tube O/L 80.5 LO
1705 E-132B Tube O/L 80.5 LO
1706 E-132D Tube O/L 80.5 LO
1707 E-132E Tube O/L 80.5 LO
1709 E-117A/B Tube O/L 80.5 LO
1710 E-117C Tube O/L 80.5 LO
1801 E-116A Shell O/L 80.5 LO
1802 E-116B Shell O/L 80.5 LO
1803 E-118A Tube O/L 80.5 LO
1804 E-118B Tube O/L 80.5 LO
1901 E-112A/B Shell O/L 80.5 LO
1902 E-113A/B Shell O/L 80.5 LO
1903 E-113C/D Shell O/L 80.5 LO
1904 E-114A/B Shell O/L 80.5 LO
2001 E-115 Tube O/L 80.5 LO
2002 E-154A/B Tube O/L 80.5 LO
2003 E-154C/D Tube O/L 80.5 LO
2004 E-121 Tube O/L 80.5 LO
2101 E-122B Tube O/L 80.5 LO
2102 E-122D Tube O/L 80.5 LO
2103 E-123A/B Shell O/L 80.5 LO
2104 E-123C Shell O/L 80.5 LO
2105 E-123D Shell O/L 80.5 LO
2106 E-122A Tube O/L 80.5 LO
2107 E-122C Tube O/L 80.5 LO
2201 E-119A/B Shell O/L 80.5 LO
2202 E-119C/D Shell O/L 80.5 LO
2203 E-119E/F Shell O/L 80.5 LO
2204 E-119G/H Shell O/L 80.5 LO
2301 MPS FR F-101A 12.5 LO
2302 MPS FR F-101A 12.5 LO
2351A CONDENSATE POT (501-F-101-V1) 5.5 LO
2351B CONDENSATE POT (501-F-101-V1) 5.5 LO
2701 C-101 Ovhd Vap Press 5.6
2702 C-101 Ovhd Vap Press 5.6
2703 C-101 Ovhd Vap Press 5.6
2704 C-101 Ovhd Vap Press 5.6
2705 C-101 Ovhd Vap Press 5.6
2706 C-101 Ovhd Vap Press 5.6
2901 Crd Col. Reflux Drum V-101 5.6 LO
2902 Crd Col. Reflux Drum V-101 5.6 LC
3101 Ovhd Naphtha Drum V-102 5.6 LO
3102 Ovhd Naphtha Drum V-102 5.6 LC
3103 CWR AT E-152A/B Tube O/L 8.7 LO
3104 CWR AT E-152 C/D Tube O/L 8.7 LO
3401 CWR From E-145C 8.7 LO
3402 CWR From E-131C 8.7 LO
3403 CWR From E-148C 8.7 LO
3404 CWR FromE-149C 8.7 LO
3701 C-106 To Vent 14.5 LO
3702 C-106 To Vent 14.5 LC
3703 E-127A/B Relief Valve 26.4 LO
3704 E-128A/B Relief Valve 26.4 LO
3705 Between 501E-127A/B 26.4 LO
3801 Stabilizer reflux drum V-103 14.5 LO
3802 Stabilizer reflux drum V-103 14.5 LC
3803 CWR FRM E-129A 8.7 LO
3804 CWR FRM E-129B 8.7 LO
3901 LP STEAM FRM F-102 5.5
3902 LP STEAM FRM F-102 5.5
4051A Condensate Pot (501-F-102-V1) 5.5 LO
4051B Condensate Pot (501-F-102-V1) 5.5 LO
4101 Vcuum Col. Overhead To Flare 3.5 LC
4102 Vcuum Col. Overhead To Flare 3.5 LC
4103 Vcuum Col. Overhead To Flare 3.5 LC
4104 Vcuum Col. Overhead To Flare 3.5 LC
4280A LUBE OIL AOP (501-P-125A) 10 NA
4280B LUBE OIL AOP (501-P-125B) 10 NA
4280C LUBE OIL AOP (501-P-125C) 10 NA
4281A LUBE OIL MOP (501-P-125A) 10 NA
4281B LUBE OIL MOP (501-P-125B) 10 NA
4281C LUBE OIL MOP (501-P-125C) 10 NA
4401 CW Return From E-131A/B 8.7 LO
4601A/B 501-G-101A/B 19 LO
4602A/B 501-G-102A/B 19 LO
4603A/B 501-G-103A/B 23.5 LO
4604A/B 501-G-104A/B 27 LO
4605A/B 501-G-105A/B 27 LO
4701 OFF GAS TO FLARE 3.5 LO
4702 OFF GAS TO FLARE 3.5 LC
4703 Cooling Water Return From 501-E-151A 8.7 LO
4704 Cooling Water Return From 501-E-150B 8.7 LO
4705 Cooling Water Return FROM 501-E-151B 8.7 LO
4706 Cooling Water Return From 501-E-150A 8.7 LO
4707 Cooling Water Return From 501-E-150C 8.7 LO
4772A Separator (501-LZ-117-V1A) 3.5 LC
4772B Separator (501-LZ-117-V1B) 3.5 LC
4772C Separator (501-LZ-117-V1C) 3.5 LC
4772D Separator (501-LZ-117-V1D) 3.5 LC
4775A CW Outlet (501-LZ-117-E1A) 8.7 LO
4775B CW Outlet (501-LZ-117-E1B) 8.7 LO
4775C CW Outlet (501-LZ-117-E1C) 8.7 LO
4775D CW Outlet (501-LZ-117-E1D) 8.7 LO
4801 CWR FROM E-149A/B 8.7 LO
4802 Hot Well Slop Oil (501-V-118) 11.84 LO
4803 Hot Well Slop Oil (501-V-118) 11.84 LC
4804 WASH WATER From E-153 18.4 LO
4901 CW RETURN FRM E-143A/B 8.7 LO
4902 CWR FRM E-157A/B 8.7 LO
4903 Stab. Naphtha from E-157A/B 14 LO
4904 Stab. Naphtha from E-157A/B 14 LC
4905 Stab. Naphtha from E-143A/B 12.8 LO
4906 Stab. Naphtha from E-143A/B 12.8 LC
5001 CWR FRM E-144A/B 8.7 LO
5002 KERO/ATF FRM E-144A/B 13.9 LO
5003 KERO/ATF FRM E-144A/B 13.9 LC
5101 CWR FRM E-145A/B 8.7 LO
5102 Hot LGO Coalescer 501-V-120 20.68 LO
5103 Hot LGO Coalescer 501-V-120 20.68 LC
5201 Cw Return Frm E-146A/B 8.7 LO
5202 Hot HGO Coalescer 501-V-121 19.9 LO
5203 Hot HGO Coalescer 501-V-121 19.9 LC
5204 Sour Diesel To Cold Storage 13.7 LO
5205 Sour Diesel To Cold Storage 13.7 LC
5301 Mp Steam Drum Blocked Discharge 14.5 LO
5302 Mp Steam Drum Blocked Discharge 14.5 LO
LP FLASH DRUM
5303 5.5 Open
V-119
LP FLASH DRUM
5304 5.5 Open
V-119
5305 LP STEAM FROM 501-V-146 7
Open
Open
5306 LP STEAM FROM 501-V-146 7
BEARING COOLING WATER RETURN
5310 8 LO
FROM 501-E-161
5401 V-115 TO ATM. 7 Open
5402 V-115 TO ATM. 7 Open
5403 TEMP. WATER FRM E-140 13.7 LO
5404 BFW FRM E-137 29 LO
5405 BFW FRM E-138 29 LO
5501 Temp water from E-139A 13.7 LO
5502 Temp water from E-139B 13.7 LO
5503 Temp. Water to E-141A 13.7 LO
5504 Temp water from E-141 A 13.7 LO

5505 Cold vgo frm E-141A/B 12.5 LO

5506 Cold vgo frm E-141A/B 12.5 LC


5601 Temp water from E-155A 13.7 LO
5602 Temp water from E-155B 13.7 LO
5603 Temp water from E-156A 13.7 LO
5604 Temp water from E-156B 13.7 LO
5605 Temp water from E-156C 13.7 LO
5606A VR + SLOP. TO RUF 38.9 LO
5606B VR + SLOP. TO RUF 38.9 LC

5607A Cold Vr + Slop. To Storage 12.8 LO

5607B Cold Vr + Slop. To Storage 12.8 LC


5608 A Cold Vr + Slop To Bitumen R/D 12.9 LO
5608 B Cold Vr + Slop To Bitumen R/D 12.9 LC
5609 A VR TO EXISTING BBU 22.6 LO
5609 B VR TO EXISTING BBU 22.6 LC
5701 TEMP. WATER DRUM V-108 3.5 LO
5702 TEMP. WATER DRUM V-108 3.5 LO
5801 501-P-132ADischarge 22 Open
5802 501-P-132BDischarge 22 Open
5803 501-P-133ADischarge 15.8 Open
5804 501-P-133BDischarge 15.8 Open
5805 501-P-148ADischarge (2ND STAGE) 23.8 Open
5806 501-P-148BDischarge (2ND STAGE) 23.8 Open
5807 501-P-148ADischarge (1ST STAGE) 13.6 Open
5808 501-P-148BDischarge (1ST STAGE) 13.6 Open
5901 V-104 Relief 3.5 LO
5902 V-104 Relief 3.5 LO
5903 501-P-135BDischarge 22 Open
5904 501-P-135ADischarge 22 Open
5905 501-P-130ADischarge 34 Open
5906 501-P-130BDischarge 34 Open
5907 501-P-136ADischarge 15.8 Open
5908 501-P-136BDischarge 15.8 Open
6001 501-P-149ADischarge 34 Open
6002 501-P-149BDischarge 34 Open
6003 501-P-150ADischarge 8.5 Open
6004 501-P-150BDischarge 8.5 Open
6201 501-P-157ADischarge 45.6 Open
6202 501-P-157BDischarge 45.6 Open
6203 501-P-157ADischarge 15.6 Open
6204 501-P-157BDischarge 15.6 Open

6101 Treated Off Gas To Flare From 501-C-108 3.5 LC

6102 Treated Off Gas To Flare From 501-C-108 3.5 LO

6103 Treated Off Gas To Flare From 501-V-140 3.5 LO

6104 Treated Off Gas To Flare From 501-V-140 3.5 LC

6105 501-E-160 Shell Outlet 13.6 LO


6106 501-G-108A 12.1 LO
6107 501-G-108B 12.1 LO
6501 501-V-143 TO FLARE 9 LO
6502 501-V-143 TO FLARE 9 LC
6701 BCR FRM 501-V-145 8 LO
6702A/B 501-V-145 13.7
7601 Instrument Air To IA KOD 9 LO
8101A/B 501-G-107A/B 36.3 LO
8201A/B 501-G-106A/B 80 LO
8551 501-LZ-133-V1 3.5
8552 501-LZ-133-V1 3.5
8553 501-LZ-133 Outlet 5.5
8554 501-LZ-133 Outlet 5.5
9902 Auxiliary Oil Mist Reservoir (501-LZ-144) 0.17
9903 Main Oil Mist Reservoir (501-LZ-144) 0.17
9922 Auxiliary Oil Mist Reservoir (501-Lz-145) 0.17
9923 Main Oil Mist Reservoir (501-Lz-145) 0.17
9942 Auxiliary Oil Mist Reservoir (501-Lz-146) 0.17
9943 Main Oil Mist Reservoir (501-Lz-146) 0.17
9962 Auxiliary Oil Mist Reservoir (501-Lz-147) 0.17
9963 Main Oil Mist Reservoir (501-Lz-147) 0.17
SV LIST :-
PSV Downstream
Remarks
B/V

LO Commisioning done as per P&ID


LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
NA Commisioning done as per P&ID
NA Commisioning done as per P&ID
NA Commisioning done as per P&ID
NA Commisioning done as per P&ID
NA Commisioning done as per P&ID
NA Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO PSV D/s B/v Lock nut key missed
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID

No Clearance to Flare
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO PSV U/s Flange leak observed
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO PSV U/s Flange leak observed
LO PSV U/s Flange leak observed

LO Commisioning done as per P&ID


LO Commisioning done as per P&ID
LO
LO
No Clearance to Flare
LO
LO
NA Commisioning done as per P&ID
NA Commisioning done as per P&ID
NA Commisioning done as per P&ID
NA Commisioning done as per P&ID
NA Commisioning done as per P&ID
NA Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO
LO PSV U/S B/V'S Isolation done due to Dry
LO Vacuum test
LO
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID

Open Commisioning done as per P&ID

Open Commisioning done as per P&ID

Commisioning done as per P&ID


Open
Open
Commisioning done as per P&ID

LO Commisioning done as per P&ID

Open Commisioning done as per P&ID


Open Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID

LO PSV U/S B/V Check nut key missed

LO Commisioning done as per P&ID


LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
PSV U/S B/V Gear V/V wheel freely rotating.
LO
Same V/V to be opened.
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO PSV D/S B/V Checknut missed.
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
Open Commisioning done as per P&ID
Open Commisioning done as per P&ID
Open Commisioning done as per P&ID
Open Commisioning done as per P&ID
Open Commisioning done as per P&ID
Open Commisioning done as per P&ID
Open Commisioning done as per P&ID
Open Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
Open Commisioning done as per P&ID
Open Commisioning done as per P&ID
Open Commisioning done as per P&ID
Open Commisioning done as per P&ID
Open Commisioning done as per P&ID
Open Commisioning done as per P&ID
Open Commisioning done as per P&ID
Open Commisioning done as per P&ID
Open Commisioning done as per P&ID
Open Commisioning done as per P&ID
Open Commisioning done as per P&ID
Open Commisioning done as per P&ID
Open Commisioning done as per P&ID
Open Commisioning done as per P&ID

LO Commisioning done as per P&ID

LO Commisioning done as per P&ID

LO Commisioning done as per P&ID

LO Commisioning done as per P&ID

LO Commisioning done as per P&ID


LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
No Clearance for CBD drum
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
LO Commisioning done as per P&ID
SR LPG PSV LIST :-
Set.Pr. PSV Upstream
PSV Tag no. Service
Kg/cm2 g B/V

PSV-1101 Flare From 506-C-101 37.9 LO


PSV-1102 Flare From 506-C-101 37.9 LC
PSV-1103 Rich Amine From 506-C-101 15.5 LO
PSV-1104 Rich Amine From 506-C-101 15.5 LC
PSV-1301 Flare From 506-C-102 37.6 LO
PSV-1302 Flare From 506-C-102 37.6 LC
PSV-1303 From 506-G-106A 37 LO
PSV-1304 From 506-G-106B 37 LO
PSV-1401 From 506-G-101A 37 LO
PSV-1402 From 506-G-101B 37 LO
PSV-1403 Flare From 506-V-103B 37.6 LO
PSV-1404 Flare From 506-V-103B 37.6 LC
PSV-1501 Flare From 506-C-103 9 LO
PSV-1502 Flare From 506-C-103
9 LC
PSV-1601 Flare From 506-V-104B 7.7 LO
PSV-1602 Flare From 506-V-104B 7.7 LC
PSV-1701 Hc To Flare From 506-V-107
37.4 LO
PSV-1702 To Flare From 506-V-107 37.4 LC
PSV-1703 Hc To Flare From 506-V-108 20.6 LO
PSV-1704 To Flare From 506-V-108 20.6 LC
PSV-1705 AUTO LPG To B/L 24.15 LO
PSV-1706 AUTO LPG To B/L 24.15 LC
PSV-1801 From Discharge Of 506-P-106A 25.4 LO
PSV-1802 From Discharge Of 506-P-106B 25.4 LO
PSV-1803 From Discharge Of 506-P-107A 26.5 LO
PSV-1804 From Discharge Of 506-P-107B 26.5 LO
PSV-2005 From 506-V-110 9 LO
PSV-2101 Flare From 506-V-111 3.5 LO
PSV-2102 Flare From 506-V-111 3.5 LC
V LIST :-
PSV
Downstream Remarks
B/V
LO Commisioning done as per P& ID
LO Commisioning done as per P& ID
LO Commisioning done as per P& ID
LO Commisioning done as per P& ID
LO Commisioning done as per P& ID
LO Commisioning done as per P& ID
LO Commisioning done as per P& ID
LO Commisioning done as per P& ID
LO Commisioning done as per P& ID
LO Commisioning done as per P& ID
LO Commisioning done as per P& ID
LO Commisioning done as per P& ID
LO Commisioning done as per P& ID
PSV U/s B/V lock nut to be removed &
LO same V/V to be isolated
LO Commisioning done as per P& ID
LO Commisioning done as per P& ID
PSV D/S B/V stem guard came out. New
LO guard to be provided.
LO Commisioning done as per P& ID
LO Commisioning done as per P& ID
LO Commisioning done as per P& ID
LO Commisioning done as per P& ID
LO Commisioning done as per P& ID
LO Commisioning done as per P& ID
LO Commisioning done as per P& ID
LO Commisioning done as per P& ID
LO Commisioning done as per P& ID
LO Commisioning done as per P& ID
LO Commisioning done as per P& ID
LO Commisioning done as per P& ID