Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

TIMING CHAIN YD

Primary Timing Chain (Cont’d)


15. Install crankshaft pulley.
a. Install crankshaft pulley to crankshaft.
b. Hold crankshaft pulley with the pulley holder (SST).
c. Tighten bolt to 20 to 29 N·m (2.0 to 3.0 kg-m, 15 to 21 ft-lb).
d. Put an alignment mark on crankshaft pulley that aligns with
one of the punched marks on the bolt.
e. Tighten fixing bolt another 60° - 66° [target: 60° (turn by one
notch)].
16. Install secondary timing chain and the associated parts.
Refer to EM-95, “Secondary Timing Chain”, “INSTALLATION”.
JEM147G
17. Install in the reverse order of removal hereafter.

EM-105

You might also like