Sitamma Sagar Multi-Purpose Project

STRUCTURAL DESIGN REPORT FOR BRIDGE


OVER L2 STREAM
MARCH 2022

Sensitivity: LNT Construction Internal Use


Design Report –Bridge over L-2 stream

Contents
1 INTRODUCTION .......................................................................................................................... 3
2 SUPERSTRUCTURE ..................................................................................................................... 6
3 SUBSTRUCTURE ......................................................................................................................... 6
3.1 Pier SUBSTRUCTURE .................................................................................................................... 7
3.2 Abutment........................................................................................................................................... 8
4 REFERENCES: ............................................................................................................................ 10

ANNEXURE I- Design calculation of Pier

ANNEXURE II- Design calculation of Abutment

Page | 2
Design Report –Bridge over L-2 stream

1 INTRODUCTION

Sitamma Sagar Multi-Purpose Project located at Downstream of existing Dummugudem anicut


near Bhadradri - Kothagudem district consists of Barrage with radial gates and hoisting
arrangements including Formation of Guide Bunds on either side of barrage with Protection
arrangements across Godavari river and Navigation channel on right bank.

A bridge of span 98 m is proposed over bund on L2 stream. An arrangement of 2 nos. of 70R


capacity Bridges with walk way on one side of each bridge are proposed for catering the need
of movement of vehicle for 2-way traffic. The superstructure arrangement is provided as per
MORTH standard drawing available for 24m span. 1 in 30 Ramps shall be provided from Road
level to meet the existing road level on either side

General arrangement for the bridge is given below.

Fig 1- Plan of Bridge

Fig 2- L Section of Bridge

Page | 3
Design Report –Bridge over L-2 stream

Fig 3- Pier Front Elevation

Fig 4- Pier Side Elevation

Page | 4
Design Report –Bridge over L-2 stream

Fig 5- L Section of Abutment

Fig 6- Cross Section of Abutment