Professional Documents
Culture Documents
Produced Inspection Requests
Produced Inspection Requests
Produced Inspection Requests
Produced & Reviewed ITP, Method Statement (MS), Material Submittal (MAT) and Shop Drawing (SDW)
prior to start construction woks.
Supervised concrete works at site e.g., Conc delivery ticket, Slump consistency, Temperature & Air
Casting of cubes for 7 & 28-days compression tests.
monitored the preparation and establishment of the Quality Assurance (QA) by the contractors.
assist the QA/QC Manager in monitoring the implementation of the Company Management System in
compliance with the Company Corporate policies, International Standards and Client’s requirements.
Ensured preparation, approval and issuance of all QA/QC documents as per Document and Data control
requirements
Coordinated with various contractors to ensure the implementation of approved Quality & HSE plan
during inspection activities.