b Pondasi FP 1
C Pondasi FP 2
Jumlah 206.4 m3
2 Urugan pasir/SIRTU
a Pondasi batu kali 122.0 m 122.0 x 1.1 x 0.1 13.4 m3
Jumlah 18.4 m3
Jumlah 96.4 m3
4 Urugan tanah
a Pondasi batu kali 120.8 - 59.6 61.2 m3
Jumlah 172.3 m3
b Pondasi FP 2 10.0 Bh
0.2 x 1.0 x 1.0 x 10.0 1.5 m3
8 Beton Sloof
C DINDING
14 Dinding (tinggi 3.2 m)
a Lantai 1
1=A,B,C,D,E,F,G,H = 21.0 m 111.0 m 3.2 x 111.0 355.2 m2
2=E,D = 2.0 m
3=B,C,D,E = 8.0 m
5=B,C,D,E = 8.0 m
6=A,B,C,D,E,F,G,H = 21.0 m
B=3,4,5 = 5.0 m
C=1,2,3 - 5,6 = 7.0 m
D=1,2,3 = 5.0 m
E=1,2,3 = 5.0 m
F=1,2,3 = 5.0 m
G=1,2,3,4,5,6 = 12.0 m
H=1,2,3,4,5,6 = 12.0 m
a Lantai 2
1=C,D,E,F,G,H = 16.0 m 98.5 m 3.2 x 98.5 315.2 m2
2=C,D,E = 6.0 m
3=D,E-F,G = 6.0 m
4=C,D = 4.0 m
5=C = 2.0 m
6=C,D,E,F,G,H = 16.0 m
C=2,3,4-5,6 = 7.0 m
D=1,2,3,4 = 7.5 m
E=1,2,3 = 5.0 m
F=1,2,3 = 5.0 m
G=1,2,3,4,5,6 = 12.0 m
H=1,2,3,4,5,6 = 12.0 m
b Lantai 2
J2 2.0 Bh 2.0 Bh
J3 4.0 Bh 4.0 Bh
P 5.0 Bh 5.0 Bh
11 PJ 3 Jumlah 6.0 Bh
12 PJ 4 Jumlah 1.0 Bh
13 P Jumlah 9.0 Bh
14 J2 Jumlah 2.0 Bh
15 J3 Jumlah 5.0 Bh
E ATAP
16 Kuda-kuda
Kayu balok 80/120/400 52.0 Btg 52.0 Btg
Kayu balok 40/120/400 22.0 Btg 22.0 Btg
Kayu balok 50/70/400 220.0 Btg 220.0 Btg
Kayu reng 20/30 1,144.0 m1 1,144.0 m1
17 Atap
Atap genting (20 bh/m2)=286 m2 5,720.0 m2 5,720.0 m2
Bubungan 31.0 m2 9.0 + 12.0 + 5.0 + 5.0 31.0 m2
Jumlah 140.0
b Lantai 2
Gypsum 132.0 m2 9.0 x 12.0 = 108.0 132.0 m2
Jumlah 132.0
18 Plafon 272.0 m2
G LANTAI
19 Keramik
A Lantai 1
a H 140.0 m2 5.0 x 11.0 = 55.0 140.0 m2
5.0 x 13.0 = 65.0
2.0 x 10.0 = 20.0 +
140.0
B Lantai 2
a Lantai 40 x 40 105.0 m2 7.0 x 5.0 = 35.0 105.0 m2
4.0 x 5.0 = 20.0
5.0 x 5.0 = 25.0
2.0 x 2.5 = 5.0
2.0 x 10.0 = 20.0 +
105.0
I LAIN-LAIN
21 Sanitary
a Closet 4.0 Bh 4.0 Bh
b Wastafel 6.0 Bh 6.0 Bh
c Kitchen set 1.0 Set 1.0 Set
d Pipa air kotor 4" 32.0 m 8.0 + 12.0 + 7.0 + 5.0 32.0 m
e Pipa air bersih 3/4" 44.0 m 20.0 + 6.0 + 10.0 + 8.0 44.0 m
f Kran air 12.0 bh 12.0 bh
22 Mekanikal Elektrik
a Kabel 210.0 m 67.0 + 87.0 + 30.0 + 26.0 210.0 m
b Stop kontak 28.0 Bh 28.0 Bh
c Saklar 22.0 Bh 22.0 Bh
d Streker 48.0 Bh 48.0 Bh
e MCB 6.0 Bh 6.0 Bh
23 Septitank
a 1.0 unit 1.0 unit
No Pekerjaan Volume
A PONDASI
1 Galian Pondasi 206.4 m3
2 Urukan Sirtu/Pasir 18.4 m3
3 Pondasi Batu Kali 96.4 m3
4 Urugan Tanah Kembali 172.3 m3
B BETON
5 Beton K225 50.4 m3
6 Besi tulangan 5,547.7 kg
7 Begesting 575.7 m2
C DINDING
8 Pasangan dinding 670.4 m2
9 Plesteran 1,340.8 m2
10 Acian 1,340.8 m2
D PINTU JENDELA
11 PJ 3 6.0 Bh
12 PJ 4 1.0 Bh
13 P 9.0 Bh
14 J2 2.0 Bh
15 J3 5.0 Bh
E ATAP
16a Kayu balok 80/120/400 52.0 Btg
16b Kayu balok 40/120/400 22.0 Btg
16c Kayu balok 50/70/400 220.0 Btg
16d Kayu reng 20/30 1,144.0 m1
17 Atap 5,720.0 m2
18 Bubungan 31.0 m1
F PLAFON
18 Plafon 272.0 m2
G LANTAI
19a Keramik 40 x 40 245.0 m2
19b Keramik 30 x 30 36.2 m2
19c Keramik 20 x 20 20.0 m2
H CAT
20a Cat Dinding 1,340.8 m2
20b Cat Plafon 272.0 m2
I LAIN-LAIN
21a Closet 4.0 Bh
21b Wastafel 6.0 Bh
21c Kitchen set 1.0 Set
21d Pipa air kotor 4" 32.0 m
21e Pipa air bersih 3/4" 44.0 m
21f Kran air 12.0 bh
22a Kabel 210.0 m
22b Stop kontak 28.0 Bh
22c Saklar 22.0 Bh
22d Streker 48.0 Bh
22e MCB 6.0 Bh
23 Septitank 1.0 unit