Tugas Studio Perancangan-Hitungan Volume

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 8

HITUNGAN VOLUME

No Gambar Jumlah Uraian Volume


A PONDASI
1 Galian Pondasi
a Pondasi batu kali

A = 12.0 m 122.0 m 1.1 x 0.9 x 122.0 120.8 m3


B = 5.0 m
C = 5.0 m
D = 5.0 m
E = 5.0 m
F = 5.0 m
G = 12.0 m
H = 12.0 m
1.0 = 21.0 m
3.0 = 11.0 m
5.0 = 8.0 m
6.0 = 21.0 m

b Pondasi FP 1

12.0 Bh 12.0 x 1.5 x 1.5 x 1.7 46.7 m3

C Pondasi FP 2

10.0 Bh 10.0 x 1.5 x 1.5 x 1.7 38.9 m3

Jumlah 206.4 m3
2 Urugan pasir/SIRTU
a Pondasi batu kali 122.0 m 122.0 x 1.1 x 0.1 13.4 m3

b Pondasi FP 1 12.0 Bh 12.0 x 1.5 x 1.5 x 0.1 2.7 m3

C Pondasi FP 2 10.0 Bh 10.0 x 1.5 x 1.5 x 0.1 2.3 m3

Jumlah 18.4 m3

3 Pondasi batu kali


A = 12.0 m 122.0 m 122.0 x( 0.3 + 0.9 )x 0.9 59.6 m3
B = 5.0 m 2.0
C = 5.0 m
D = 5.0 m
E = 5.0 m
F = 5.0 m
G = 12.0 m
H = 12.0 m
1.0 = 21.0 m
3.0 = 11.0 m
5.0 = 8.0 m
6.0 = 21.0 m

Jumlah 96.4 m3

4 Urugan tanah
a Pondasi batu kali 120.8 - 59.6 61.2 m3

b Pondasi FP 1 46.7 - 3.9 42.8 m3

C Pondasi FP 2 38.9 - 2.8 36.1 m3

d Bawah lantai 161.2 x 0.2 32.2 m3

Jumlah 172.3 m3

1 Galian Pondasi 206.4 m3


2 Urukan Sirtu/Pasir 18.4 m3
3 Pondasi Batu Kali 96.4 m3
4 Urugan Tanah Kembali 172.3 m3
B BETON
5 Pondasi Footplat
a Pondasi FP 1 12.0 Bh
0.2 x 1.0 x 1.0 x 12.0 1.8 m3

( 1.0 + 0.1 )x 0.1 x 12.0 0.7 m3


2.0

0.3 x 0.3 x 1.3 x 12.0 1.4 m3

b Pondasi FP 2 10.0 Bh
0.2 x 1.0 x 1.0 x 10.0 1.5 m3

( 1.0 + 0.1 )x 0.1 x 10.0 0.5 m3


2.0

0.3 x 0.2 x 1.3 x 10.0 0.8 m3

6 Beton Kolom lantai 1


a 1K1 (tinggi 3.2 m) 12.0 bh 0.3 x 0.3 x 3.2 x 12.0 3.5 m3

b 1K2 (tinggi 3.2 m) 10.0 bh 0.3 x 0.2 x 3.2 x 10.0 1.9 m3

c 1K3 (tinggi 3.2 m) 4.0 bh 0.2 x 0.2 x 3.2 x 4.0 0.3 m3

d KP 13.0 bh 0.1 x 0.1 x 3.2 x 13.0 0.6 m3

7 Beton Kolom lantai 2


a 2K1 10.0 bh 0.3 x 0.3 x 3.2 x 10.0 2.9 m3

b 2K2 10.0 bh 0.3 x 0.2 x 3.2 x 10.0 1.9 m3


c KP
16.0 bh 0.1 x 0.1 x 3.2 x 16.0 0.7 m3

8 Beton Sloof

1=A,B,C,D,E,F,G,H = 21.0 m 163.0 m 0.2 x 0.2 x 163.0 4.9 m3


2=D,E = 2.0 m
3=B,C,D,E,F,G = 15.0 m
5=B,C,D,E,F,G = 15.0 m
6=A,B,C,D,E,F,G,H = 21.0 m
A=1,2,3,4,5,6 = 12.0 m
B=3,4,5 = 5.0 m
C=1,2,3,4,5,6 = 12.0 m
D=1,2,3,4,5,6 = 12.0 m
E=1,2,3,4,5,6 = 12.0 m
F=1,2,3,4,5,6 = 12.0 m
G=1,2,3,4,5,6 = 12.0 m
H=1,2,3,4,5,6 = 12.0 m

9 Beton balok lantai 1


a Balok induk 250/400 (BI)

1=C,D,E,F,G = 13.0 m 113.5 m 0.25 x 0.28 x 113.5 7.9 m3


3=B,C,D,E,F,G = 15.0 m
5=B,C,D,E,F,G = 15.0 m
6=C,D,E,F,G = 13.0 m
C=1,2,3,4,5,6 = 12.0 m
D=1,2-3,4,5,6 = 9.5 m
E=1,2,3,4,5,6 = 12.0 m
F=1,2,3,4,5,6 = 12.0 m
G=1,2,3,4,5,6 = 12.0 m

b Balok anak 200/300 (BA)

2=C,D,E,F,G = 13.0 m 32.0 m 0.20 x 0.18 x 32.0 1.2 m3


4=C,D,E,F = 9.0 m
C'=2,3,4,5 = 7.5 m
D=2,3 = 2.5 m

10 Beton balok ringbalk 120/200 RB

1=D,E,F,G = 9.0 m 82.0 m 0.12 x 0.20 x 82.0 2.0 m3


2=C,D,E = 6.0 m
3=D,E,F,G = 9.0 m
4=C,D = 4.0 m
5=C = 2.0 m
6=C,D,E,F,G = 13.0 m
C=2,3,4,5,6 = 9.5 m
D=1,2,3,4 = 7.5 m
E=1,2,3 = 5.0 m
F=1,2,3 = 5.0 m
G=1,2,3,4,5,6 = 12.0 m
11 Beton plat lantai (tebal 12 cm)

B,C-3,5 =2,0 X 5,0 = 10.0 m2 133.0 m2 0.1 x 133.0 16.0 m3


C,D-1,2,3,4,5,6 =4,0 X 12,0 = 48.0 m2
D,E-1,2,3,4,5,6 =2,0 X 12,0 = 24.0 m2
E,F -1,2,3,4,5,6 =3,0 X 12,0 = 36.0 m2
F,G -1,2,3 =3,0 X 5,0 = 15.0 m2

12 Besi Tulangan 5,547.7 Kg 50.4 x 110.0 5,547.7 Kg

13 Begesting 575.7 m2 50.4 x 11.4 575.7 m2

5 Beton K225 Jumlah 50.4 m3


6 Besi tulangan Jumlah 5,547.7 kg
7 Begesting Jumlah 575.7 m2

C DINDING
14 Dinding (tinggi 3.2 m)
a Lantai 1
1=A,B,C,D,E,F,G,H = 21.0 m 111.0 m 3.2 x 111.0 355.2 m2
2=E,D = 2.0 m
3=B,C,D,E = 8.0 m
5=B,C,D,E = 8.0 m
6=A,B,C,D,E,F,G,H = 21.0 m
B=3,4,5 = 5.0 m
C=1,2,3 - 5,6 = 7.0 m
D=1,2,3 = 5.0 m
E=1,2,3 = 5.0 m
F=1,2,3 = 5.0 m
G=1,2,3,4,5,6 = 12.0 m
H=1,2,3,4,5,6 = 12.0 m

a Lantai 2
1=C,D,E,F,G,H = 16.0 m 98.5 m 3.2 x 98.5 315.2 m2
2=C,D,E = 6.0 m
3=D,E-F,G = 6.0 m
4=C,D = 4.0 m
5=C = 2.0 m
6=C,D,E,F,G,H = 16.0 m
C=2,3,4-5,6 = 7.0 m
D=1,2,3,4 = 7.5 m
E=1,2,3 = 5.0 m
F=1,2,3 = 5.0 m
G=1,2,3,4,5,6 = 12.0 m
H=1,2,3,4,5,6 = 12.0 m

15 Plesteran 670.4 m2 670.4 x 2.0 1,340.8 m2

16 Acian 670.4 m2 670.4 x 2.0 1,340.8 m2

8 Pasangan dinding Jumlah 670.4 m2


9 Plesteran Jumlah 1,340.8 m2
10 Acian Jumlah 1,340.8 m2
D PINTU JENDELA
15 Pintu Jendela
a Lantai 1
PJ 3 6.0 Bh 6.0 Bh
PJ 4 1.0 Bh 1.0 Bh
P 4.0 Bh 4.0 Bh

b Lantai 2

J2 2.0 Bh 2.0 Bh
J3 4.0 Bh 4.0 Bh
P 5.0 Bh 5.0 Bh

11 PJ 3 Jumlah 6.0 Bh
12 PJ 4 Jumlah 1.0 Bh
13 P Jumlah 9.0 Bh
14 J2 Jumlah 2.0 Bh
15 J3 Jumlah 5.0 Bh

E ATAP
16 Kuda-kuda
Kayu balok 80/120/400 52.0 Btg 52.0 Btg
Kayu balok 40/120/400 22.0 Btg 22.0 Btg
Kayu balok 50/70/400 220.0 Btg 220.0 Btg
Kayu reng 20/30 1,144.0 m1 1,144.0 m1

17 Atap
Atap genting (20 bh/m2)=286 m2 5,720.0 m2 5,720.0 m2
Bubungan 31.0 m2 9.0 + 12.0 + 5.0 + 5.0 31.0 m2

16a Kayu balok 80/120/400 52.0 Btg


16b Kayu balok 40/120/400 22.0 Btg
16c Kayu balok 50/70/400 220.0 Btg
16d Kayu reng 20/30 1,144.0 m1
17 Atap 5,720.0 m2
18 Bubungan 31.0 m1
F PLAFON
18 Plafon
a Lantai 1
Gypsum 140.0 m2 5.0 x 13.0 = 65.0 140.0 m2

5.0 x 11.0 = 55.0

2.0 x 10.0 = 20.0 +

Jumlah 140.0

b Lantai 2
Gypsum 132.0 m2 9.0 x 12.0 = 108.0 132.0 m2

5.0 x 4.0 = 20.0

2.0 x 2.0 = 4.0 +

Jumlah 132.0

18 Plafon 272.0 m2

G LANTAI
19 Keramik
A Lantai 1
a H 140.0 m2 5.0 x 11.0 = 55.0 140.0 m2
5.0 x 13.0 = 65.0
2.0 x 10.0 = 20.0 +
140.0

b Teras 30 x 30 4.0 m2 1.0 x 2.0 = 2.0 4.0 m2


1.0 x 2.0 = 2.0 +
4.0

c K. mandi 20 x 20 10.0 m2 5.0 x 2.0 = 10.0 + 10.0 m2


10.0

d Tangga 30 x 30 7.2 m2 6.0 x 1.2 = 7.2 + 7.2 m2


7.2

B Lantai 2
a Lantai 40 x 40 105.0 m2 7.0 x 5.0 = 35.0 105.0 m2
4.0 x 5.0 = 20.0
5.0 x 5.0 = 25.0
2.0 x 2.5 = 5.0
2.0 x 10.0 = 20.0 +
105.0

b Teras 30 x 30 25.0 m2 4.0 x 2.5 = 10.0 25.0 m2


2.0 x 5.0 = 10.0
2.0 x 2.5 = 5.0 +
25.0

c Kamar mandi 20 x 20 10.0 m2 5.0 x 2.0 = 10.0 + 10.0 m2


10.0
19a Keramik 40 x 40 245.0 m2
19b Keramik 30 x 30 36.2 m2
19c Keramik 20 x 20 20.0 m2
H CAT
20a Cat Dinding 1,340.8 m2
20b Cat Plafon 272.0 m2

I LAIN-LAIN
21 Sanitary
a Closet 4.0 Bh 4.0 Bh
b Wastafel 6.0 Bh 6.0 Bh
c Kitchen set 1.0 Set 1.0 Set
d Pipa air kotor 4" 32.0 m 8.0 + 12.0 + 7.0 + 5.0 32.0 m
e Pipa air bersih 3/4" 44.0 m 20.0 + 6.0 + 10.0 + 8.0 44.0 m
f Kran air 12.0 bh 12.0 bh

22 Mekanikal Elektrik
a Kabel 210.0 m 67.0 + 87.0 + 30.0 + 26.0 210.0 m
b Stop kontak 28.0 Bh 28.0 Bh
c Saklar 22.0 Bh 22.0 Bh
d Streker 48.0 Bh 48.0 Bh
e MCB 6.0 Bh 6.0 Bh

23 Septitank
a 1.0 unit 1.0 unit

21a Closet 4.0 Bh


21b Wastafel 6.0 Bh
21c Kitchen set 1.0 Set
21d Pipa air kotor 4" 32.0 m
21e Pipa air bersih 3/4" 44.0 m
21f Kran air 12.0 bh
22a Kabel 210.0 m
22b Stop kontak 28.0 Bh
22c Saklar 22.0 Bh
22d Streker 48.0 Bh
22e MCB 6.0 Bh
23 Septitank 1.0 unit
REKAPITULASI

No Pekerjaan Volume
A PONDASI
1 Galian Pondasi 206.4 m3
2 Urukan Sirtu/Pasir 18.4 m3
3 Pondasi Batu Kali 96.4 m3
4 Urugan Tanah Kembali 172.3 m3

B BETON
5 Beton K225 50.4 m3
6 Besi tulangan 5,547.7 kg
7 Begesting 575.7 m2

C DINDING
8 Pasangan dinding 670.4 m2
9 Plesteran 1,340.8 m2
10 Acian 1,340.8 m2

D PINTU JENDELA
11 PJ 3 6.0 Bh
12 PJ 4 1.0 Bh
13 P 9.0 Bh
14 J2 2.0 Bh
15 J3 5.0 Bh

E ATAP
16a Kayu balok 80/120/400 52.0 Btg
16b Kayu balok 40/120/400 22.0 Btg
16c Kayu balok 50/70/400 220.0 Btg
16d Kayu reng 20/30 1,144.0 m1
17 Atap 5,720.0 m2
18 Bubungan 31.0 m1

F PLAFON
18 Plafon 272.0 m2

G LANTAI
19a Keramik 40 x 40 245.0 m2
19b Keramik 30 x 30 36.2 m2
19c Keramik 20 x 20 20.0 m2

H CAT
20a Cat Dinding 1,340.8 m2
20b Cat Plafon 272.0 m2

I LAIN-LAIN
21a Closet 4.0 Bh
21b Wastafel 6.0 Bh
21c Kitchen set 1.0 Set
21d Pipa air kotor 4" 32.0 m
21e Pipa air bersih 3/4" 44.0 m
21f Kran air 12.0 bh
22a Kabel 210.0 m
22b Stop kontak 28.0 Bh
22c Saklar 22.0 Bh
22d Streker 48.0 Bh
22e MCB 6.0 Bh
23 Septitank 1.0 unit

You might also like