Temporary Sheet Pile

You might also like

Download as pdf
Download as pdf
You are on page 1of 3
RIMARISAN IMARISAN SON. BHO. ‘ro iner@emaaan.com (Our Ref. RR2068/TOP GLOVE F42/QUO-LS-01-R2 Date: 10 March 2021 ‘TOP QUALITY GLOVE SDN BHD LOT 4961, JALAN TERATAL, BATU 6, OFF JALAN MERU, 41050 KLANG, SELANGOR DARUL EHSAN ‘Attn : MS Cindy Chai Dear Madam, F42, Banting Civil Structural Work of 1 Block Factory (Block 1) at Lot 213, 214, 215, 216, 217, 218,Pekan Bukit Changgang, Daerah Kuala Langat, Selangor. Quotation For Additional R.C Work IETS With reference to the above project, we are pleased to submit herewith quotation with amounting RM696,084.70 (Ringgit Malaysia : Six Hundred Ninety Six Thousand And Eighty Four And Seventy Sen Only) for your kind approval. Noted that the above works had been fully completed and handed over. Your early verfication will very much appreciated. ‘Thank you. ‘Yours faithfully Loy Kam Ling Contract Manager cc. TOP QUALITY GLOVE SDN BHD. HB ONG ARCHITECT PERUNDING LNL SDN BHD - MUHAMMAD SYAHMIE B, ABD. - AR. ONG HUN BOON -IR LOO! JOON SENG 1. Building Forward / PROJECT: F42 Top Glove ELEMENT: QUOTATION FOR ADDITIONAL RC Work Area IETS ‘Supporting Documental Dated 2/1/2021 Rate Ret | TEN DESCRIPTION ow UNT]_RATE [AMOUNT (Additional 1.00 [Temporary Shortly Shes Pile 1.10 [To provide temporary se pile Sn length sound TETS dsp pit with 500| NewRae | m2 | 6tio| 3878050 proper Beam suppor at comes 1.20 [Transportation of het pil to site nd demobilie the sane fom site upon Tis00 | Neweie | won | 7260] 563040 ie temnination of etl pra 2.00 [installation Works 2.10 [Mobilisation of excavator PCSI0 vio shoe ple rving machine model: SFV 100} Newrate | Tip | 363000] 3.63000 300 (mivmum vibratory fre wanes) excavator mounted to site and {demobiise upon completion o shoe pling work 2:20 [Pitch and ahve x Ou ong set pile 22700 | Newrwte | pes | 7990] 183730 3.00 | Extaton of sist ies 310 [acting of hot ple x 9.0m 32700 | Newrte | pes | 60.50] 13,738:50 320 | Mobilisation and demnob_PC#1Ovibro st driving machine modek SFV 200] Newate | it | sos000| 7.26000 [300 (Maximum vibrator fre: 35 tonnes excavator outed 1 stead \demobiisason ypon completion of shet pling wor 330 [Siva & Waler Work Newre | won | 250000| 55,000.00 1400 [Pre Bore Work 10 |Mo-denobisaion of re bore machine 100 | “RateOaly | Trip | 480000 | Rie Only 4120 |Pre‘bore Sm shet pile (excluded hard matral) 100| RateOniy | Pex | 29700) Rate Only “40 [Design fees for empoary coat pile and sting syst 100 | “NewRate | 1s | 10,0000 | 1000000 430 [dewatering using ida panp during the constuction period 100| NewRate | ts | 3000000] 3000000 Slab Lower Ground it commencing fi fms eel a. well am and move spis excavated material om ite 500 exceeding 300m dep, but not excooing 40m deep Lower Ground) 197600 | ProRateBQ] ma | 3300] 35.s0800 BillNod {600 [Reinforced concrete Grade 35 Waterproofing 9300 | RQ'IINo2| mi] 28000] 5040.00 71.00 | Sm Thick eon concrete Grade 15 26600 | BOBIINS?| m2 | 1150] 3.05000 High Tensile Bar B00 fy2s 2489200 | BQ BilNo2| ig | 360] —toxor120 Material: 28 perke Labour RMO Sper hy Wastage: 5% Profit 10%-RMO.30 per ke 900 [Reifoved concrete Grade 35 Waterproofing 3600] BQBIINo2| ms | 28000| —10.080.00 [Sawn Fomor 10.00 |Sonit of ish 18200 | BQ BitNo2| m2 | 3600] 688200 11.00 [Edge of opening 18.00 | BQ Bil No2| im 720 108.0 12.00 JBRE Dans 36400 | NewRate | m2 | 2600] 946800 Material: R704 88 Rebate S8G=RMSS 40 x 4296=RM22.50 por md Labour: RM2.$0 per m2 Wastage: 5% Profit 10% = [Total Carel Forward 330,002 0 PROJECT: F&2 Top Glove ELEMENT: QUOTATION FOR ADDITIONAL R.C Work Area IETS. Supporting Document mail Dated 2912021 TEN DESCRIPTION ‘Qiy_[_Ratenet_[ UNIT] RATE_[_ AMOUNT [Tol Bring Forward 380,002.90 {Ground Beam 15.00 [Reinforced concrete Grade 35 Waterproofing 12.00 | BORINNO2| mi | 28000] 336000 {San Formork 14.00 [Soffit & side of round team 10700 | BOBINNo2| ma | —3600/ 3.852.00 [High Tensile Bar 1500 |v2s 1038900 [BOBITNo| “kg | 3.60| 3743640 16.00 |¥20 7.69300 | BQ'BIINo2| kg_| 2.40 27,654.80 1190 |y12 38.00 | BQDIINo2| ke | 3.60 136.0 itd See Bar 18.00 R10 27200| BQBINNo?| ke | 3.60 97920 Rc 19.00 [Reinforced concrete Gade 35 Waterproofing 7200 | BOBINNo2|“ms_| 20000] —30,16000 [Sawn Formwork With W: Sealer Uni 2000 [Side of RC wall s2200| BQBIINe2| m2 | 200| —21.92800 2100 4734800 | BQBNo2| ig | 360] 17045280 (RC Column 2200 [Reinored concrete Grade 38 Wateroting 1.00] BQBITNe2| ma | 280.00 280.00 Sawn Formwork 2300 [Side of RC Column 1800 | BQBUNo2| m2 | 3600 340.00 High Tensile Bar 2400 |y25 35600 | BOBINoa| kg | 340 12810 2500 /Yi0 5200 BQBINNo2| kg_| 3.60 18720 2600 | Ex over for apanson joint with 250mm wide watt. and T12 7o00| NewRate | m | asl 3,137.00 120 defomes tars forever conee pour engines’ detail Material Cost: [2 per 012 R336>RM28.0 pr meer Labour Cost: RML0 siled worker @ Mim-RMIS/n Profit 10% = RM.10 ‘Waterproofing To RC Wall 27.00 [Pepa and apply 2 coats of "Sika igoliex Ry lexible ube! itumen 70400| BORN | m2 | 3500] 2464000 [emulsion coating for F.C wal se surface 728.00 [Optional Kem: [Waterproofing work t intemal IETS R.C Wall NewRaie | ma | 3500] RateOnly “Toil Carried To Summary: 608

You might also like