RIMARISAN
IMARISAN SON. BHO.
‘ro iner@emaaan.com
(Our Ref. RR2068/TOP GLOVE F42/QUO-LS-01-R2
Date: 10 March 2021
‘TOP QUALITY GLOVE SDN BHD
LOT 4961, JALAN TERATAL,
BATU 6, OFF JALAN MERU,
41050 KLANG, SELANGOR DARUL EHSAN
‘Attn : MS Cindy Chai
Dear Madam,
F42, Banting Civil Structural Work of 1 Block Factory (Block 1) at Lot 213, 214, 215, 216,
217, 218,Pekan Bukit Changgang, Daerah Kuala Langat, Selangor.
Quotation For Additional R.C Work IETS
With reference to the above project, we are pleased to submit herewith quotation with amounting
RM696,084.70 (Ringgit Malaysia : Six Hundred Ninety Six Thousand And Eighty Four And Seventy Sen
Only) for your kind approval.
Noted that the above works had been fully completed and handed over. Your early verfication will very
much appreciated.
‘Thank you.
‘Yours faithfully
Loy Kam Ling
Contract Manager
cc. TOP QUALITY GLOVE SDN BHD.
HB ONG ARCHITECT
PERUNDING LNL SDN BHD
- MUHAMMAD SYAHMIE B, ABD.
- AR. ONG HUN BOON
-IR LOO! JOON SENG
1. Building Forward /PROJECT: F42 Top Glove
ELEMENT: QUOTATION FOR ADDITIONAL RC Work Area IETS
‘Supporting Documental Dated 2/1/2021
Rate Ret |
TEN DESCRIPTION ow UNT]_RATE [AMOUNT
(Additional
1.00 [Temporary Shortly Shes Pile
1.10 [To provide temporary se pile Sn length sound TETS dsp pit with 500| NewRae | m2 | 6tio| 3878050
proper Beam suppor at comes
1.20 [Transportation of het pil to site nd demobilie the sane fom site upon Tis00 | Neweie | won | 7260] 563040
ie temnination of etl pra
2.00 [installation Works
2.10 [Mobilisation of excavator PCSI0 vio shoe ple rving machine model: SFV 100} Newrate | Tip | 363000] 3.63000
300 (mivmum vibratory fre wanes) excavator mounted to site and
{demobiise upon completion o shoe pling work
2:20 [Pitch and ahve x Ou ong set pile 22700 | Newrwte | pes | 7990] 183730
3.00 | Extaton of sist ies
310 [acting of hot ple x 9.0m 32700 | Newrte | pes | 60.50] 13,738:50
320 | Mobilisation and demnob_PC#1Ovibro st driving machine modek SFV 200] Newate | it | sos000| 7.26000
[300 (Maximum vibrator fre: 35 tonnes excavator outed 1 stead
\demobiisason ypon completion of shet pling wor
330 [Siva & Waler Work Newre | won | 250000| 55,000.00
1400 [Pre Bore Work
10 |Mo-denobisaion of re bore machine 100 | “RateOaly | Trip | 480000 | Rie Only
4120 |Pre‘bore Sm shet pile (excluded hard matral) 100| RateOniy | Pex | 29700) Rate Only
“40 [Design fees for empoary coat pile and sting syst 100 | “NewRate | 1s | 10,0000 | 1000000
430 [dewatering using ida panp during the constuction period 100| NewRate | ts | 3000000] 3000000
Slab Lower Ground
it commencing fi fms eel
a. well am and move spis excavated material om ite
500 exceeding 300m dep, but not excooing 40m deep Lower Ground) 197600 | ProRateBQ] ma | 3300] 35.s0800
BillNod
{600 [Reinforced concrete Grade 35 Waterproofing 9300 | RQ'IINo2| mi] 28000] 5040.00
71.00 | Sm Thick eon concrete Grade 15 26600 | BOBIINS?| m2 | 1150] 3.05000
High Tensile Bar
B00 fy2s 2489200 | BQ BilNo2| ig | 360] —toxor120
Material: 28 perke
Labour RMO Sper hy
Wastage: 5%
Profit 10%-RMO.30 per ke
900 [Reifoved concrete Grade 35 Waterproofing 3600] BQBIINo2| ms | 28000| —10.080.00
[Sawn Fomor
10.00 |Sonit of ish 18200 | BQ BitNo2| m2 | 3600] 688200
11.00 [Edge of opening 18.00 | BQ Bil No2| im 720 108.0
12.00 JBRE Dans 36400 | NewRate | m2 | 2600] 946800
Material: R704 88 Rebate S8G=RMSS 40 x 4296=RM22.50 por md
Labour: RM2.$0 per m2
Wastage: 5%
Profit 10% =
[Total Carel Forward 330,002 0PROJECT: F&2 Top Glove
ELEMENT: QUOTATION FOR ADDITIONAL R.C Work Area IETS.
Supporting Document mail Dated 2912021
TEN DESCRIPTION ‘Qiy_[_Ratenet_[ UNIT] RATE_[_ AMOUNT
[Tol Bring Forward 380,002.90
{Ground Beam
15.00 [Reinforced concrete Grade 35 Waterproofing 12.00 | BORINNO2| mi | 28000] 336000
{San Formork
14.00 [Soffit & side of round team 10700 | BOBINNo2| ma | —3600/ 3.852.00
[High Tensile Bar
1500 |v2s 1038900 [BOBITNo| “kg | 3.60| 3743640
16.00 |¥20 7.69300 | BQ'BIINo2| kg_| 2.40 27,654.80
1190 |y12 38.00 | BQDIINo2| ke | 3.60 136.0
itd See Bar
18.00 R10 27200| BQBINNo?| ke | 3.60 97920
Rc
19.00 [Reinforced concrete Gade 35 Waterproofing 7200 | BOBINNo2|“ms_| 20000] —30,16000
[Sawn Formwork With W: Sealer Uni
2000 [Side of RC wall s2200| BQBIINe2| m2 | 200| —21.92800
2100 4734800 | BQBNo2| ig | 360] 17045280
(RC Column
2200 [Reinored concrete Grade 38 Wateroting 1.00] BQBITNe2| ma | 280.00 280.00
Sawn Formwork
2300 [Side of RC Column 1800 | BQBUNo2| m2 | 3600 340.00
High Tensile Bar
2400 |y25 35600 | BOBINoa| kg | 340 12810
2500 /Yi0 5200 BQBINNo2| kg_| 3.60 18720
2600 | Ex over for apanson joint with 250mm wide watt. and T12 7o00| NewRate | m | asl 3,137.00
120 defomes tars forever conee pour engines’ detail
Material Cost: [2 per 012 R336>RM28.0 pr meer
Labour Cost: RML0 siled worker @ Mim-RMIS/n
Profit 10% = RM.10
‘Waterproofing To RC Wall
27.00 [Pepa and apply 2 coats of "Sika igoliex Ry lexible ube! itumen 70400| BORN | m2 | 3500] 2464000
[emulsion coating for F.C wal se surface
728.00 [Optional Kem:
[Waterproofing work t intemal IETS R.C Wall NewRaie | ma | 3500] RateOnly
“Toil Carried To Summary: 608