Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 5

MARITAS FLEET PVT.

LTD COT 1 T5
Page 1 of 5
(02/23 Rev 0)

PERIODIC CALIBRATION AND TESTS


(Section 1 - Monthly and Section 2 - Quarterly)
Vessel: ANE Date: 31.03.2023

SECTION 1: To be completed at the end of each Month

A. FIXED GAS DETECTION EQUIPMENT DATE: 07.03.2023


Calibration / Spanning to be carried out as per Makers’ recommendations. After calibration
checks the instruments to be zeroed.
CALIBRATION OBSERVED REMARKS (Battery/ sensor renewal,
LOCATION
GAS SPECS READING etc.)
Fore Peak 50% LEL 50% LEL
WBT 1P 50% LEL 50% LEL

WBT 1S 50% LEL 50% LEL

WBT 2P 50% LEL 50% LEL

WBT 2S 50% LEL 50% LEL

WBT 3P 50% LEL 50% LEL

WBT 3S 50% LEL 50% LEL

WBT 4P 50% LEL 50% LEL

WBT 4S 50% LEL 50% LEL

WBT 5P 50% LEL 50% LEL

WBT 5S 50% LEL 50% LEL

WBT 6P 50% LEL 50% LEL

WBT 6S 50% LEL 50% LEL

After peak 50% LEL 50% LEL

Tool Space 1 50% LEL 50% LEL

Tool Space 2 50% LEL 50% LEL

Tool Space 3 50% LEL 50% LEL

Tool Space 4 50% LEL 50% LEL

Tool Space 5 50% LEL 50% LEL

Tool Space 6 50% LEL 50% LEL

Tool Space 7 50% LEL 50% LEL


50% LEL 50% LEL
Cargo Sample
Locker
MARITAS FLEET PVT. LTD COT 1 T5
Page 2 of 5
(02/23 Rev 0)

B. FIXED VECS SYSTEM CALIBRATION DATE: 07.03.2023


Calibration / Spanning to be carried out as per Makers’ recommendations. After calibration
checks the instruments to be zeroed.
VECS O2
CALIBRATION OBSERVED
Sensor REMARKS
GAS SPECS READING
location/no.

C. N2 ROOM / IG ROOM / BWTS ROOM* OXYGEN DATE:


SENSOR
Calibration / Spanning to be carried out as per Makers’ recommendations. After calibration
checks the instruments to be zeroed.
O2 Sensor CALIBRATION OBSERVED
REMARKS
location/no. GAS SPECS READING

*Note: Records of periodic calibration of Oxygen sensor of the VECS system and other
spaces such as Nitrogen Room, BWTS Room, etc shall also be recorded in this section.

SECTION 2: To be completed at the end of each Quarter

A. GAS DETECTORS – PORTABLE AND PERSONAL


(Calibration / Spanning to be carried out as per Makers’ recommendations. After calibration
checks, the instruments to be Zeroed (Oxygen Analyser to show 20.9% in fresh air)

REMARKS (Battery, sensor renewal, etc.)


CALIB.GAS OBSERVED In the case of disposal personal gas
DATE
SPECS READING meters, mention the date when it was put
in use and its expiry date.
INSTRUMENT NO.1: Serial No:
266050360
07.03.2023 O2 – 0-40%; O2 – 20.9%
i-C4H10 – 0-100 % i-C4H10–1% LEL
LEL/0-100% VOL H2S – 25 ppm
H2S –0-100 ppm CO – 1 ppm
CO – 0-500 ppm

INSTRUMENT NO.2: Serial No:


266050361
07.03.2023 O2 – 0-40%; O2 – 20.9%
i-C4H10 – 0-100 % i-C4H10–1% LEL
LEL / 0-100% VOL H2S – 25 ppm
H2S –0-100 ppm CO – 1 ppm
CO – 0-500 ppm
INSTRUMENT NO.3: Serial No:
266091645RN
MARITAS FLEET PVT. LTD COT 1 T5
Page 3 of 5
(02/23 Rev 0)

07.03.2023 O2 – 0-40% O2 – 20.9%


CH4 – 0-100% LEL CH4–1% LEL
H2S – 0-200 ppm H2S – 25 ppm
CO – 0-2000 ppm CO – 1 ppm

INSTRUMENT NO.4: Serial No:


266091676RN
07.03.2023 O2 – 0-40% O2 – 20.9%
CH4 – 0-100% LEL CH4–1% LEL
H2S – 0-200 ppm H2S – 25 ppm
CO – 0-2000 ppm CO – 1 ppm

INSTRUMENT NO.5: Serial No:


266091739RN
07.03.2023 O2 – 0-40% O2 – 20.9%
CH4 – 0-100% LEL CH4–1% LEL
H2S – 0-200 ppm H2S – 25 ppm
CO – 0-2000 ppm CO – 1 ppm

INSTRUMENT NO.6: Serial No:


266091732RN
07.03.2023 O2 – 0-40% O2 – 20.9%
CH4 – 0-100% LEL CH4–1% LEL
H2S – 0-200 ppm H2S – 25 ppm
CO – 0-2000 ppm CO – 1 ppm

B. CARGO, INERT GAS AND TANK CLEANING HOSES CONTINUITY TEST


(Cargo Hose: Allowable resistance is 0.75 Ohms/ meter measured between nipples (end
flange to end flange). Tank cleaning hose: Allowable resistance is 6 Ohms per meter length.

OBSERVED REMARKS, OBSERVATIONS &


HOSE NO. LENGTH ALLOWABLE
READING LOCATION

1. CARGO HOSES

2. TANKCLEANING HOSES
MARITAS FLEET PVT. LTD COT 1 T5
Page 4 of 5
(02/23 Rev 0)

3. STEAM HOSES

4. INERT GAS HOSES

C. UTI / MMC and SAMPLERS TESTS AND CHECKS DATE:


Inspection Other checks as per Makers’
Serial No. Continuity
Sensor/ tape Instructions
G11806 UTI 20.09.2022

G11807 UTI 20.09.2022

D. DRAFT GAUGES TESTS AND CHECKS DATE:


Loadicator Visual
Error 1 Draft in draft gauges Error 2
Location draft draft (a)-(b) (c) (b) – (c)
(a) (b)
Forward 6.27 m 6.2 m 0.07 6.26 m 0.06
Aft 8.58 m 8.5 m 0.08 8.61 m 0.11
Midship 7.39 m 7.35 m 0.04 7.42 m 0.07
(P)
Midship 7.39 m 7.35 m 0.04 7.42 m 0.07
(S) Error 1 should be used during the loadables calculation.
Note Error 2 should be used during the cargo operations.
MARITAS FLEET PVT. LTD COT 1 T5
Page 5 of 5
(02/23 Rev 0)

CHIEF OFFICER: Name: Signature:

You might also like