SUBGRADE : Data CBR Subgrade :

Nama Lapisan Tebal (cm) No H3 Lapisan 1 H2 Lapisan 2 H1 Lapisan 3


H1 (atas) 32 (Bawah) (tengah) (atas)
H2 (tengah) 32 1 36 3.97 32 6.79 32 9.91
H3 (bawah) 36 2 36 3.88 32 7.83 32 8.95
3 36 4.47 32 6.97 32 8.81
4 36 4.37 32 6.98 32 9.59
5 36 4.45 32 6.97 32 9.58
6 36 3.97 32 7.58 32 9.99
7 36 4.58 32 7.43 32 9.98
8 36 4.61 32 7.57 32 9.79
9 36 3.96 32 7.68 32 9.51
10 36 3.89 32 6.93 32 8.96
11 36 3.78 32 6.89 32 8.86
12 36 3.89 32 6.79 32 9.11

CBR Rata-rata
∑CBRm /n = 6.56035967535 Pendekatan Statistik (Sta
CBR design = CBRrat

CBRm CBR Rata-rata (CBRm - CBR rata-rata)^2 Dik : CBR min = 5,501
6.4694905922 6.56035967535 0.0082571902768042
6.4922929361 6.56035967535 0.00463308099416687 *) Untuk Probabilita
6.4889231407 6.56035967535 0.00510317848279546
6.6445366866 6.56035967535 0.00708576922611652
6.6768357926 6.56035967535 0.0135666858874702 *) Untuk Probabilita
6.7279282452 6.56035967535 0.0280792256016033
6.9813572495 6.56035967535 0.177238957453484
6.9901259146 6.56035967535 0.184699020423707 *) Untuk Probabilita
6.6327282339 6.56035967535 0.00523720825973983
6.2387219085 6.56035967535 0.103450853057144
6.1472062838 6.56035967535 0.170695724947786 *) Untuk Probabilita
6.2341691205 6.56035967535 0.106400278060828

∑(CBRm - CBR rata-rata)^2 = 0.814447172671646 *) Untuk Probabilita

Standar Deviasi = √((CBRm - CBR rata-rata)^2)/n-1


0.272104119889903
CBR design = 6
H3*CBR1^1/3 H2*CBR2^1/3 H1*CBR3^1/3
((H3*CBR1^1/3)+(H2*CBR2^1/3)+(H1*CBR3^1/3)/H1+H2+H3)^3
H1+H2+H3 CBRm (CBR Titik)

57.0032131153 60.595434381 68.734460752 100 6.46949059218093 6.469


56.5691616565 63.543417101 66.439189137 100 6.49229293608952 6.492
59.3023187936 61.126224342 66.090942889 100 6.48892314070454 6.489
58.8567548642 61.155443383 67.986525589 100 6.64453668662312 6.645
59.2137416359 61.126224342 67.962886322 100 6.6768357925952 6.677
57.0032131153 62.859807522 68.91892178 100 6.72792824520459 6.728
59.7848292818 62.442399411 68.895918133 100 6.9813572495203 6.981
59.9150798662 62.832152522 68.455898585 100 6.99012591463314 6.99
56.9553112329 63.135029103 67.796949071 100 6.63272823385707 6.633
56.6177189007 61.009067899 66.463924504 100 6.23872190851556 6.239
56.0789363 60.891459765 66.215737261 100 6.14720628380629 6.147
56.6177189007 60.595434381 66.832766265 100 6.2341691205237 6.234

78.72
Pendekatan Statistik (Statistic Approach)
CBR design = CBRrata-rata - (k*Standar Deviasi)

Dik : CBR min = 5,501

*) Untuk Probabilitas 97 %, k = 1.881 *) Untuk Probabilitas 92 %, k =


CBR design = 6.0485318258 % CBR design =
*) Untuk Probabilitas 91 %, k =
*) Untuk Probabilitas 96 %, k = 1.751 CBR design =
CBR design = 6.0839053614 %

*) Untuk Probabilitas 95 %, k = 1.645


CBR design = 6.1127483981 %

*) Untuk Probabilitas 94 %, k = 1.555


CBR design = 6.1372377689 %

*) Untuk Probabilitas 93 %, k = 1.476


CBR design = 6.1587339944 %

CBR design = 6,11%


6.56035968

1.405
6.17805339 %
1.34
6.19574015 %
*) Menghitung angka Eqivalen (E)

No. Jenis Kendaraan Tonase Distribusi Pembebanan Jumlah Kendaraan d


1 Kendaraan Ringan 2 1+1 1127 1
2 Bus 6 2+4 977 1
3 Truck Ringan 4.8 2 + 2,8 837 1
4 Truck Sedang 9.7 4 + 5,7 707 1
5 Truck Berat 24 8+ 8.8 717 1

1) Kedaraan Ringan
0.000451096399427009 0.0807

2) Bus
0.0623704070776362

3) Truck Ringan
0.0255469187389998

4) Truck sedang
0.426049945544787

5) Truck Berat
1.08274683930307
*) Menghitung Lintas Eqivalen Permulaan (LEP)
LEP = LHR*d*c*E
C LHR LHRn
0.25 1127 4556.34544 1) Kedaraan Ringan
0.425 2931 3949.91082 0.12709641053856
0.25 1674 3383.90517
0.425 1767.5 2858.3285 2) Bus
0.425 2151 2898.75748 77.6932568364345
17647.2474
3) Truck Ringan
10.6913854922714

4) Truck Berat
0.0839 320.043393468925

5) Truck Berat
989.820091819888

*) Menghitung Lintas Eqivalen Tengah (LET)


LET = (∑LEP + ∑LEA)/2

∑LEP = 1398.37522402806
∑LEA = 5653.4876408037

LET = 3525.93143241588

*) Menghitung Lintas Eqivalen Rencana (LER)


LER = LET*FR FP = UR/10 FP = 1.8

LER = 6346.676578

6346.6766
*) Menghitung Lintas Eqivalen Akhir (LEA)
LEA = LEP(1+i)^UR i = 8,07% UR = 18Tahun

1) Kedaraan Ringan
0.513837755291811

2) Bus
314.105870692798

3) Truck Ringan
43.2241752464084

4) Truck Berat
1293.90262242027

5) Truck Berat
4001.74113468892
Dik = CBR design = 6.11 % *) Menghitung Daya Dukung Tanah (DDT)
Material Subbase CBR = 70 % DDT = 4,3*Log(CBR)+1,7
Material Base CBR = 100 %
FR = 2.5 1) CBR Base = 100 %
LER = 6346.6766 ESA
2) CBR Subbase = 70 %
IP0 = 4
Ipt = 2.5 3) CBR Subgrade = 6,11 %

*) Menghitung Indeks Tebal Perkerasan (ITP)


Log(6346,677*3650) = 9,36Log((ITP/2,54)+
Asumsi X = ((ITP/2,54)+1)

ITP2
7.36483923351034 =
7.36483923351034 +
5.24717924218238 =

Interpolasi
X= 3.793 =
∆1 =
X= 3.7929 =
∆1 =

1.86393280535491E-08
a =

Maka X = =
3.79279281068212
=

ITP2 =

ITP3
7.36483923351034 =
7.36483923351034 +
5.49496041737558 =

Interpolasi
X= 4.08 =
∆1 =
X= 4.075 =
∆1 =

1.47541187633005E-05
a =

Maka X = =
4.07636668071049
=

ITP3 =

ITP4
7.36483923351034 =
7.36483923351034 +
7.18871530396537 =

Interpolasi
X= 6.7293 =
∆1 =
X= 6.7292 =
∆1 =

-2.77511608178571E-08
a =

Maka X = =
6.7298030704297
=

ITP4 =
a Dukung Tanah (DDT)
DT = 4,3*Log(CBR)+1,7

DDT2 = 10.3

DDT3 = 9.63

DDT4 = 5.08

ks Tebal Perkerasan (ITP)


9,36Log((ITP/2,54)+1)-0,2+ (Log((IP0-Ipt)/(4,2-1,5)))/0,4+(1094/((ITP/2,54)+1)^5,19)+ Log(1/FR)+

9,36Log(X)-0,2+ -0.255272505103306 / (0,4+(1094/(X)^5,19))+ -0.39794000867


0.2 + 0.397940008672038 - 2.7156 = 9,36Log(X)-0,2+
9,36Log(X)-0,2- 0.255272505103306 / (0,4+(1094/(X)^5,19))

5.246992848902
0.000186393280535491
5.246902886117
0.000276356065512573

-8.9962785E-05
-0.00020718932

3.792792810682

7.093693739133

7.09

9,36Log(X)-0,2+ -0.255272505103306 / (0,4+(1094/(X)^5,19))+ -0.39794000867


0.2 + 0.397940008672038 - 2.4678188248068 = 9,36Log(X)-0,2+
9,36Log(X)-0,2- 0.255272505103306 / (0,4+(1094/(X)^5,19))

5.492009593623
0.00295082375266009
5.487948811295
0.00701160608079121

-0.00406078233
-0.00363331929

4.07636668071

7.813971369005

7.81
9,36Log(X)-0,2+ -0.255272505103306 / (0,4+(1094/(X)^5,19))+ -0.39794000867
0.2 + 0.397940008672038 - 0.77406393821701 = 9,36Log(X)-0,2+
9,36Log(X)-0,2- 0.255272505103306 / (0,4+(1094/(X)^5,19))

7.188992815574
-0.000277511608178571
7.188937652004
-0.000222348038270148

-5.51635699E-05
0.00050307043

6.72980307043

14.55369979889

14.55

ITP2 < ITP3 < ITP4


7.09 < 7.81 < 14.55
Log(1/FR)+ 0,372(DDT-3)

-0.39794000867 2.7156
9,36Log(X)-0,2+ -0.2552725051 / (0,4+(1094/(X)^5,19))

-0.39794000867 2.4678188248
9,36Log(X)-0,2+ -0.2552725051 / (0,4+(1094/(X)^5,19))
-0.39794000867 0.7740639382
9,36Log(X)-0,2+ -0.2552725051 / (0,4+(1094/(X)^5,19))
ITP design : *) Metode Memaksimumkan Lap. Perkerasan/Alternatif 1
ITP2 = 7.09 cm Dik : D2 min = 20 cm
ITP3 = 7.81 cm D3 min = 10 cm
ITP4 = 14.55 cm
a1 = 0.4
a2 = 0.14
a3 = 0.13

Dit : D1 min ?

ITP4 = (a1*D1)+(a2*D2)+(a3+D3)
D1 = (ITP4 - ((a2*D2)+(a3*D3)))/a1
D1 = 26.1342494972286
D1 = 26.5 cm

*) Metode Memaksimumkan Lap. Pondasi/Alternatif 2


Dik : D3 min = 10 cm

a1 = 0.4
a2 = 0.14
a3 = 0.13

Dit : D1 min ?
D2 min ?

ITP2 = a1*D1
D1 = ITP2/a1
17.734234348
D1 = 18 cm

ITP4 = (a1*D1)+(a2*D2)+(a3+D3)
D2 = (ITP4 - ((a1*D1)+(a3*D3)))/a2
D2 = 43.2407128492246
D2 = 43.240712849 Dipakai D2 hitung = 44
kerasan/Alternatif 1 *) Metode Memaksimumkan Lap. Pondasi Bawah/Alternatif 3
Dik : Tidak ada

a1 = 0.4
a2 = 0.14
a3 = 0.13

Dit : D1 min ? D3 min ?


D2 min ?

ITP2 = a1*D1
D1 = ITP2/a1
17.73423434783
D1 = 18 cm

ITP3 = (a1*D1)+(a2*D2)
ndasi/Alternatif 2 D2 = (ITP3 - (a1*D1))/a2
D2 = 4.3855097786046
D2 = 4.385509778605 cm Dipakai D2 min = 20

ITP4 = (a1*D1)+(a2*D2)+(a3+D3)
D3 = (ITP4 - ((a1*D1)+(a2*D2)))/a3
D3 = 35.0284599914727
D3 = 35.02845999147 cm Dipakai D3 hitung = 36

cm
Alternatif 3

cm

cm
Menghitung ITPn
Nama Lapisan Cost Alt1 Alt2 Alt3
Surface Cost (D1) 8a 26.5 18 18
Base Cost (D2) 2,5a 20 44 20
Subbase (D3) a 10 10 36
Total 11,5a 56.5 72 74

Alt1 = ((10/10)*a)+((20/20)*2,5a)+((26.5/26.5)*8a) = 11.5 a


Alt2 = ((10/10)*a)+((44/20)*2,5a)+((18/26,5)*8a) = 11.93 a
Alt3 = ((36/10)*a)+((20/20)*2,5a)+((18/26.5)*8a) = 11.53 a

Dipilih Alt 1

a1 = 0.4 26.5 Lap. Permukaan


a2 = 0.14 20 Base C.
a3 = 0.13 10 Sub, Base C.
5.4339622642
5.5
1
11.933962264
Menghitung ITPnyata
ITP2 Nyata = a1*D1 = 10.6 cm
ITP3 Nyata = (a1*D1)+(a2*D2) = 13.4 cm
ITP4 Nyata = (a1*D1)+(a2*D2)+(a3*D3) = 14.7 cm

Kontrol : ITP Nyata ≥ ITP design


ITP2 Nyata = 10.6 ≥ ITP2 design = 7.09 Ok!
ITP3 Nyata = 13.4 ≥ ITP3 design = 7.81 Ok!
ITP4 Nyata = 14.7 ≥ ITP4 design = 14.55 Ok!
Dik : *) Menghitung LER Nyata untuk % Umur Lap. Permukaan
LER = 6346.6766 ESA 1. LER2nyata
ITP2 Nyata = 10.6 cm Log(LER2Nyata*3650) =
ITP3 Nyata = 13.4 cm Log(LER2Nyata*3650) =
ITP4 Nyata = 14.7 cm Log(LER2 Nyata*3650) =
FR = 2.5 LER2Nyata =

DDT2 = 10.3 LER3nyata


*) Menghitung LER Nyata untuk % Umur Lap. Pondasi
DDT3 = 9.63
Log(LER3Nyata*3650) =
DDT4 = 5.08 Log(LER Nyata*3650) =
Log(LER3Nyata*3650) =
LER3Nyata =

LER4nyata
*) Menghitung LER Nyata untuk % Umur Lap. Pondasi Ba

Log(LER4Nyata*3650) =
Log(LER Nyata*3650) =
Log(LER4Nyata*3650) =
LER4Nyata =
g LER Nyata untuk % Umur Lap. Permukaan

9,36*Log((ITP2nyata/2,54)+1)-0,2 -0.25527250510331/ (0,4+(1094/((ITP2nyata/2,54)+1)^5,19))+


6.48080903093179 -0.25527250510331 0.616069947169043
8.38411265529797
66346.7709391897 66346.7708936697

g LER Nyata untuk % Umur Lap. Pondasi

9,36*Log((ITP3nyata/2,54)+1)-0,2 -0.25527250510331/ (0,4+(1094/((ITP3nyata/2,54)+1)^5,19))+


7.26604706011985 -0.25527250510331 0.479284801955943
8.80331456861134
174189.392352089 174189.392507975

g LER Nyata untuk % Umur Lap. Pondasi Bawah

9,36*Log((ITP4nyata/2,54)+1)-0,2+ -0.25527250510331/ (0,4+(1094/((ITP4nyata/2,54)+1)^5,19))+


7.58474517997155 -0.25527250510331 0.452780794601725
7.39676841187101
6830.86256299499 6830.8625650238
% Umur Lap. Permukaan
(LER Nyata/LER design)*100%
-0.3979400087 + 2.7156
947169043 -0.3979400087 2.7156 1045.3781581 %
% Umur = 104538% > 105% tidak memenuhi

% Umur Lap. Pondasi


(LER Nyata/LER design)*100%
-0.3979400087 + 2.47
801955943 -0.3979400087 2.4678188 2744.5764662 %
% Umur = 274458%

% Umur Lap. Pondasi


(LER Nyata/LER design)*100%
-0.3979400087 + 0.7737515199
794601725 -0.3979400087 0.7737515 107.62896857 %
% Umur = 10763%
tidak memenuhi
ITP desain : *) Metode Memaksimumkan Lap. Perkerasan/Alterna
ITP2 = 6.61 cm Dik : D2 min = 20 cm
ITP3 = 7.3 cm D3 min = 10 cm
ITP4 = 13.75 cm
a1 = 0.4
a2 = 0.14
a3 = 0.13

Dit : D1 min ?

ITP4 = (a1*D1)+(a2*D2)+(a3+D3)
D1 = (ITP4 - ((a2*D2)+(a3*D3)))/a1
D1 = 24.125
D1 = 24.5 cm

*) Metode Memaksimumkan Lap. Pondasi/Alternati


Dik : D3 min = 10 cm

a1 = 0.4
a2 = 0.14
a3 = 0.13

Dit : D1 min ?
D2 min ?

ITP2 = a1*D1
D1 = ITP2/a1
16.525
D1 = 17 cm

ITP4 = (a1*D1)+(a2*D2)+(a3+D3)
D2 = (ITP4 - ((a1*D1)+(a3*D3)))/a2
D2 = 40.3571428571428
D2 = 40.357143 Dipakai D2 hitung =

Nama Lapisan Cost Alt1 Alt2 Alt3


Surface Cost (D1) 8a 24.5 17 17
Base Cost (D2) 2,5a 20 41 20
Subbase (D3) a 10 10 32
Total 11,5a 54.5 68 69
Alt1 = ((10/10)*a)+((20/20)*2,5a)+((17.5/17.5)*8a) = 11.5
Alt2 = ((10/10)*a)+((45/20)*2,5a)+((12.5/17.5)*8a) = 11.67602
Alt3 = ((25/10)*a)+((20/20)*2,5a)+((12.5/17.5)*8a) = 11.25102

Dipilih Alt 3

a1 = 0.4
a2 = 0.14
a3 = 0.13
umkan Lap. Perkerasan/Alternatif 1 *) Metode Memaksimumkan Lap. Pondasi Bawah/Alternatif 3
Dik : Tidak ada

a1 = 0.4
a2 = 0.14
a3 = 0.13

Dit : D1 min ? D3 min ?


D2 min ?

)+(a2*D2)+(a3+D3) ITP2 = a1*D1


a2*D2)+(a3*D3)))/a1 D1 = ITP2/a1
24.125 16.525
D1 = 17 cm

ITP3 = (a1*D1)+(a2*D2)
mumkan Lap. Pondasi/Alternatif 2 D2 = (ITP3 - (a1*D1))/a2
D2 = 3.57142857142856
D2 = 4.92 cm Dipakai D2 min =

ITP4 = (a1*D1)+(a2*D2)+(a3+D3)
D3 = (ITP4 - ((a1*D1)+(a2*D3)))/a3
D3 = 31.9230769230769
D3 = 31.923077 cm Dipakai D3 hitung =

)+(a2*D2)+(a3+D3)
a1*D1)+(a3*D3)))/a2
3571428571428
akai D2 hitung = 41 cm

ITP2 Nyata = a1*D1 = 6.8 cm


ITP3 Nyata = (a1*D1)+(a2*D2) = 9.6 cm
ITP4 Nyata = (a1*D1)+(a2*D2)+(a3*D3) = 13.76 cm
a Kontrol : ITP Nyata ≥ ITP design
a ITP2 Nyata = 6.8 ≥ ITP2 design = 6.61
a ITP3 Nyata = 9.6 ≥ ITP3 design = 7.3
ITP4 Nyata = 13.76 ≥ ITP4 design = 13.75
asi Bawah/Alternatif 3

20 cm

9
32 cm
Ok!
Ok!
Ok!
Dik : *) Menghitung LER Nyata untuk % Umur Lap. Permukaan
LER = 4239.58 ESA
ITP2 Nyata = 6.8 cm Log(LER Nyata*3650) =
ITP3 Nyata = 9.6 cm Log(LER Nyata*3650) =
ITP4 Nyata = 13.76 cm Log(LER Nyata*3650) =
FR = 2.5 LER Nyata =

DDT2 = 10.3
*) Menghitung LER Nyata untuk % Umur Lap. Pondasi
DDT3 = 9.6339216
Log(LER Nyata*3650) =
DDT4 = 5.0799772 Log(LER Nyata*3650) =
Log(LER Nyata*3650) =
LER Nyata =

*) Menghitung LER Nyata untuk % Umur Lap. Pondasi Baw

Log(LER Nyata*3650) =
Log(LER Nyata*3650) =
Log(LER Nyata*3650) =
LER Nyata =
tung LER Nyata untuk % Umur Lap. Permukaan

9,36Log((ITP2/2,54)+1)-0,2+ / (0,4+(1094/((ITP2/2,54)+1)^5,19))+
-0.255273 -0.39794 + 2.7156
5.09320317395105 -0.255273 1.6705858767879 -0.39794
7.25805898523044
4963.24965162641

tung LER Nyata untuk % Umur Lap. Pondasi

9,36Log((ITP3/2,54)+1)-0,2+ / (0,4+(1094/((ITP3/2,54)+1)^5,19))+
-0.255273 -0.39794 + 2.4678188
6.15904332031665 -0.255273 0.72584369887365 -0.39794
7.87723139986525
20650.8786850452

tung LER Nyata untuk % Umur Lap. Pondasi Bawah

9,36Log((ITP4/2,54)+1)-0,2+ / (0,4+(1094/((ITP4/2,54)+1)^5,19))+
-0.255273 -0.39794 + 0.7737515
7.35683238965842 -0.255273 0.470607469060684 -0.39794
7.19021199768914
4245.40506034602
% Umur Lap. Permukaan
(LER Nyata/LER design)*100%

2.7156 117.069372 %
% Umur = 11707%

% Umur Lap. Pondasi


(LER Nyata/LER design)*100%

2.4678188 487.097279 %
% Umur = 48710%

% Umur Lap. Pondasi


(LER Nyata/LER design)*100%

0.7737515 100.137398 %
% Umur = 10014%
Dik = CBR design = 6.11 % *) Menghitung Daya Dukung Tanah (DDT)
Material Subbase CBR 70 % DDT = 4,3*Log(CBR)+1,7
Material Base CBR = 100 %
FR = 2.5 1) CBR Base = 100 %
LER = 6346.6766 ESA
2) CBR Subbase = 70 %
IP0 = 4
Ipt = 2.5 3) CBR Subgrade = 6,13 %

*) Menghitung Indeks Tebal Perkerasan (ITP)


Log(2521,0568*3650) 9,36*Log((ITP2desain/2,5
Asumsi X = ((ITP/2,54)+1)

ITP2
7.18961569598589 =
7.18961569598589 +
5.07195570465793 =
4988.9257
Interpolasi
X= 3.6055 =
∆1 =
X= 3.60549 =
∆1 =

8.999700717993E-11
a =

Maka X = =
3.60549071355588
=

ITP2 =

ITP3
7.18961569598589 =
7.18961569598589 +
5.31973687985112 =

Iterasi
Interpolasi
X= 3.87499 =
∆1 =
X= 3.874985 =
∆1 =

6.077230445323E-10
a =

Maka X = =
3.87485064406601
=

ITP3 =

ITP4
7.18961569598589 =
7.18961569598589 +
7.01380418475394 =

Interpolasi
X= 6.41625 =
∆1 =
X= 6.416249 =
∆1 =

1.26925881947E-11
a =

Maka X = =
6.41622764118779
=

ITP4 =

IT
Dukung Tanah (DDT)
DT = 4,3*Log(CBR)+1,7
LER1 = 40%*LER
DDT2 = 10.3 LER1 = 0,4*LER
LER1 = 2538.67064
DDT3 = 9.6339216 2538.67064

DDT4 = 5.08
LER(I) = 1,67*LER1
LER(I) = 4239.57997 SS/Day
s Tebal Perkerasan (ITP)
9,36*Log((ITP2desain/2,54)+1)-0,2+ (Log((IPo-Ipt)/(4,2-1,5)))/0,4+(1094/((ITP2desain/2,54)+1) Log(1/FR)+

9,36Log(X)-0,2+ -0.255272505103306 / (0,4+(1094/(X)^5,19))+-0.397940008672038


0.2 + 0.397940008672038 - 2.7156 = 9,36Log(X)-0,2+
9,36Log(X)-0,2- 0.255272505103306 / (0,4+(1094/(X)^5,19))

5.07194670495721
8.99970071799316E-06
5.07193701373352
1.869092440554E-05

-9.6912236875E-06
-9.286444115E-06

3.60549071355588

6.61794641243195

6.61794641243195

9,36Log(X)-0,2+ -0.255272505103306 / (0,4+(1094/(X)^5,19))+-0.397940008672038


0.2 + 0.397940008672038 - 2.4678188 = 9,36Log(X)-0,2+
9,36Log(X)-0,2- 0.255272505103306 / (0,4+(1094/(X)^5,19))
5.31961533524222
0.000121544608906454
X1
5.31961097430094
0.000125905550182104

-4.3609412756E-06
-0.000139355934

3.87485064406601

7.30212063592767

7.30212063592767

9,36Log(X)-0,2+ -0.255272505103306 / (0,4+(1094/(X)^5,19))+-0.397940008672038


0.2 + 0.397940008672038 - 0.7737515 = 9,36Log(X)-0,2+
9,36Log(X)-0,2- 0.255272505103306 / (0,4+(1094/(X)^5,19))

7.01379149216574
1.2692588194696E-05
7.01379092448853
1.32602654074887E-05

-5.6767721279E-07
-2.2358812206E-05

6.41622764118779

13.757218208617

13.757218208617

ITP2 < ITP3 < ITP4


6.61794641243195 < 7.3021206 < 13.757218
52.93% 0.4707

4239.5799688

0,372(DDT2-3)

2.7156
-0.255272505103 / (0,4+(1094/(X)^5,19))

2.4678188248068
-0.255272505103 / (0,4+(1094/(X)^5,19))
X2

0.773751519904
-0.255272505103 / (0,4+(1094/(X)^5,19))
Dik = CBR design = 6.11 % *) Menghitung Daya Dukung Tanah (DDT)
Material Subbase CBR 70 % DDT = 4,3*Log(CBR)+1,7
Material Base CBR = 100 %
FR = 2.5 1) CBR Base = 100 %
LER = 6346.6766 ESA
2) CBR Subbase = 70 %
IP0 = 4
Ipt = 2.5 3) CBR Subgrade = 6,13 %

*) Menghitung Indeks Tebal Perkerasan (ITP)


Log(2521,0568*3650) = 9,36Log((ITP4(I+II)/2,54
Asumsi X = ((ITP/2,54)+1)

ITP4
7.54093049256602 =
7.54093049256602 +
7.36511898133407 =

Interpolasi
X= 7.053179 =
∆1 =
X= 7.0531785 =
∆1 =

7.9172701185293E-11
a =

Maka X = =
7.05288302287078
=

ITP4 =
ukung Tanah (DDT) Stage II : Sisa Umur Perkerasan (100%-40%)
T = 4,3*Log(CBR)+1,7
LER2 = (100%-40%)*LER
DDT2 = 10.3 LER2 = 0,6*LER
LER2 = 3808.00596
DDT3 = 9.6339216

DDT4 = 5.0799772
LER(I+II) = 2,5*LER2
LER(I+II) = 9520.0149 SS/Day
ebal Perkerasan (ITP)
9,36Log((ITP4(I+II)/2,54)+1)-0,2+ (Log((IP0-Ipt)/(4,2-1,5)))/0,4+(1094/((ITP4(I+II)/2,54)+1) Log(1/FR)+

9,36Log(X)-0,2+ -0.255272505103306 / (0,4+(1094/(X)^5,19))+-0.397940008672038


0.2 + 0.397940008672038 - 0.7737515 = 9,36Log(X)-0,2+
9,36Log(X)-0,2- 0.255272505103306 / (0,4+(1094/(X)^5,19))

7.364960635932
0.000158345402370585
7.364960368436
0.000158612898380817

-2.6749601E-07
-0.00029597713

7.052883022871

15.37432287809

15.37432287809

15.37432288
52.93% 0.5293

0,372(DDT4-3)

0.7737515
-0.255273 / (0,4+(1094/(X)^5,19))
ITP4 (I+II) = 15.37 cm Menghitung D0 :
15.1 ITP II = ITP (I+II)-ITP I
a1 = 0.4 ao =a1
a2 = 0.14 D0 = (ITP4(I+II)-((a1*D1)+(a2*D2)+(a3*D3)))/a1
a3 = 0.13 = 3.35
= 3.35 cm
D1 = 17
D2 = 20
D3 = 32

LER = 6346.6766 SA

LER2 = 60%*LER
LER2 = 0,6*6346,6766
LER2 = 3808.00596 SS/Day

Dik = CBR design = 6.11 % *) Menghitung Daya Dukung Tanah (DDT


Material Subbase CBR = 70 % DDT = 4,3*Log(CBR)+1,7
Material Base CBR = 100 %
FR = 2.5 1) CBR Base = 100 %
LER = 3808.006 SA
2) CBR Subbase = 70 %
IP0 = 4
Ipt = 2.5 3) CBR Subgrade = 6,13 %

*) Menghitung Indeks Tebal Perkerasan (


Log(2521,0568*3650)
Asumsi X = ((ITP/2,54)+1)

ITP LER2
7.14299048389399
7.14299048389399
6.96717897266203

Interpolasi
X= 6.32595
∆1
X= 6.32594
∆1

4.857474616152E-08
a
Maka X =
6.31746238254615

ITP LER2

Dik : ITP LER 2 =

ITP I Sisa :
ITP I Sisa
((a1*D1)+(a2*D2)+(a3*D3)))/a1

tung Daya Dukung Tanah (DDT)


DDT = 4,3*Log(CBR)+1,7

e = 100 % DDT2 = 10.3

base = 70 % DDT3 = 9.6339216

grade = 6,13 % DDT4 = 5.0799772

tung Indeks Tebal Perkerasan (ITP)


9,36Log((ITP/2,54)+1)-0,2+ (Log((IP0-Ipt)/(4,2-1,5)))/0,4+(1094/((ITP/2,54)+1)^5,19) Log(1/FR)+
X = ((ITP/2,54)+1)

= 9,36Log(X)-0,2+ -0.255272505103306 / (0,4+(1094/(X)^5,19))+-0.397940008672038


+ 0.2 + 0.397940008672038 - 0.7737515 = 9,36Log(X)-0,2+
= 9,36Log(X)-0,2- 0.255272505103306 / (0,4+(1094/(X)^5,19))

= 6.962321498
= 0.00485747461615205
= 6.962315775
= 0.00486319762928566

-5.723013E-06
= -0.0084876175
= 6.3174623825

= 13.506354452

= 13.506354452

13.506354 13.506354

= (ITP LER2-(ITP(I+II)-((a1*D1)+(a2*D2)+(a3*D3)))
= 11.896354452 cm
11.896354
Log(1/FR)+ 0,372(DDT-3)

-0.397940008672038 0.7737515
9,36Log(X)-0,2+ -0.255273 / (0,4+(1094/(X)^5,19))
ITP I Sisa : 11.896354 cm
ITP4 I : 15.374323 cm

CV = (ITP I Sisa / ITP4 I)*100%


= 77.3780708556787 %
Log(LER*3650) = 9,36Log((ITPu(I)/2,54)+1)-0,2+ (Log((IP0-Ipt)/(4,2-1,5)))/0,4+(1094/((ITP/2,54)+1)^5,19)+

Ipt = f(LERI, ITP4(I), FR, PSIo, DDT4)


Menghitu
ng Ipt
Log(LER1*3650) = 9,36Log((ITP4(I)/2,54)+1)-0,2+ (Log((IP0-Ipt)/(4,2-1,5)))/0,4+(1094/((ITP/2,54)+1)^5,19)+

LER1 = 40%*LER Ipt ???


ITP4 (I)
Ipo = 4
FR =2,5 Log(2538,67064*3650) 9,36Log((13,76)/2,54)+1)-0,2+
DDT4 = 5,08
ITP4 (I) 13.76 Ipt = 2.83
LER1 = 40%*LER
LER1 = 0,4*LER
LER1 = 2538.67064 Log(N) = 9,36Log((13,76)/2,54)+1)-0,2+
Ipo Ipt FR DDT4 ITP4pakai
4.0 4.0 2.5 5.08 13.76
4.0 3.9 2.5 5.08 13.76
4.0 3.8 2.5 5.08 13.76
4.0 3.6 2.5 5.08 13.76
4.0 3.5 2.5 5.08 13.76
4.0 3.4 2.5 5.08 13.76
4.0 3.3 2.5 5.08 13.76
4.0 3.2 2.5 5.08 13.76
4.0 3.1 2.5 5.08 13.76
4.0 3 2.5 5.08 13.76
4.0 2.9 2.5 5.08 13.76
4.0 2.83 2.5 5.08 13.76
4.0 2.8 2.5 5.08 13.76
4.0 2.7 2.5 5.08 13.76
4.0 2.6 2.5 5.08 13.76
4.0 2.5 2.5 5.08 13.76
4.0 2.4 2.5 5.08 13.76
4.0 2.3 2.5 5.08 13.76
4.0 2.2 2.5 5.08 13.76
4.0 2.1 2.5 5.08 13.76
4.0 2 2.5 5.08 13.76
4.0 1.9 2.5 5.08 13.76
4.0 1.8 2.5 5.08 13.76
4.0 1.7 2.5 5.08 13.76
4.0 1.6 2.5 5.08 13.76
4.0 1.5 2.5 5.08 13.76
4.0 1.4 2.5 5.08 13.76
4.0 1.3 2.5 5.08 13.76
4.0 1.2 2.5 5.08 13.76
4.0 1.1 2.5 5.08 13.76
4.0 1 2.5 5.08 13.76
4/((ITP/2,54)+1)^5,19)+ Log(1/FR)+ 0,372(DDT-3)

4/((ITP/2,54)+1)^5,19)+ Log(1/FR)+ 0,372(DDT-3)

(Log((4,0-Ipt)/(4,2-1,5)))/0,4+(1094/((13,76/2,54)+1)^5, Log(1/2,5)+ 0,372(5.08-3)

(Log((4,0-Ipt)/(4,2-1,5)))/0,4+(1094/((13,76/2,54)+1)^5, Log(1/2,5)+ 0,372(5.08-3)


log N N

Chart Title
4.5
4
3.5
3
2.5
2
1.5
1
0.5
0
3
2.5
2
1.5
1
0.5
0

4.0 Column G
I

X X

4,9

Ls -x = 70 - x
2
Ls = 70

I II
IV

-2% +2%
-2% -2%