Method Statement Submittal - MSS: Part A: Project Information
Method Statement Submittal - MSS: Part A: Project Information
Part C: Contents covered in Method of Statement: FOR INSTALLATION OF UNDERGROUND DUCTS/CONDUITS FOR ELECTRICAL SYSTEM
1. Scope
2. Purpose
3. References
4. Definitions.
5. Responsibility
6. General Requirements
7. Construction Program
8. Procedure
9. QA/QC
10. Housekeeping
11. Safety
12. Attachments.
Employer/ Engineer’s
Comments
Note (2): Employer’s/ Engineer’s approval is for conformance with information given and design concept expressed in Contract Documents. Approval does not authorize changes to Contract Documents. Employer’s/ Engineer’s approval does
not relieve the Contractor from his contractual obligation to ensure conformance to all Contract Documents. Any deviations, to the Contract Documents found after Employer’s/ Engineer’s approval are to be corrected by the Contractor at
no extra Cost/Time.
For Employer/ Engineer:
TAMOUH / MUSANDA
ENGINEER (HDP) PMC – RAPM
(Developer / Employer)
Name
Designation
Signature
Date
Page 2 of 2
Form Ref. TMT129, Rev- 1, Date: 09-Feb-17