METHOD STATEMENT SUBMITTAL - MSS

Part A: Project Information:


Project Name Jebel Hafeet Ambulatory Center, Al Ain- Abu Dhabi
Employer M/s. Musanada Consultant Healthcare Designers & Project Management (HDP)
PMC Royal Architects & Project Management Contractor Trojan General Contracting LLC
Civil Contractor Durat Al Khaleej Contracting LLC Sub-Contractor Al Qranfal Technical Services

Part B: Method Statement Submittal Record:


MSS. Ref No. MSS-PAB-CLN-MEP-EL-09 Rev. No: 02 Submittal Issue Date 14/08/2021
☐ Civil ☐ Architectural ☒ Electrical
Related Discipline
☐ Mechanical ☐ Others (Specify ……………………………………………………………………....)

Part C: Contents covered in Method of Statement: FOR INSTALLATION OF UNDERGROUND DUCTS/CONDUITS FOR ELECTRICAL SYSTEM

1. Scope
2. Purpose
3. References
4. Definitions.
5. Responsibility
6. General Requirements
7. Construction Program
8. Procedure
9. QA/QC
10. Housekeeping
11. Safety
12. Attachments.

For Contractor’s Review:


Page 1 of 2
Form Ref. TMT129, Rev- 1, Date: 09-Feb-17
We do certify that the shop drawings submitted herewith has been reviewed in detail and in accordance with the Contract Documents except as otherwise stated here above.
Discipline Engineer QA/QC Section Sub-Contractor (PM) Civil-Contractor (DKC) Main contractor (TGC)

Name Eng. Tareq Amri Eng. Ashraf Zeid Engr. Ismail


Designation Electrical Engineer Project Manager Project Manager
Signature
Date 14/08/2021 14/08/2021 14/08/2021

Part D: Employer/ Engineer Review and Approval:

Employer/ Engineer’s
Comments

☐ A: Approved ☐ B: Approved with Comments


Employer/ Engineer
Approval
☐ C: Revise & Resubmit ☐ D: Rejected

Note (2): Employer’s/ Engineer’s approval is for conformance with information given and design concept expressed in Contract Documents. Approval does not authorize changes to Contract Documents. Employer’s/ Engineer’s approval does
not relieve the Contractor from his contractual obligation to ensure conformance to all Contract Documents. Any deviations, to the Contract Documents found after Employer’s/ Engineer’s approval are to be corrected by the Contractor at
no extra Cost/Time.
For Employer/ Engineer:
TAMOUH / MUSANDA
ENGINEER (HDP) PMC – RAPM
(Developer / Employer)
Name
Designation
Signature
Date

Page 2 of 2
Form Ref. TMT129, Rev- 1, Date: 09-Feb-17