Manpower Productivity Rates

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 21

PRODUCTIVITY RATES

01 GENERAL RE

a.
SITE b.
FACILITIES
c.

d.

02 SITE W

Excavation
a.

b.

c.

d.

EARTHWORK e.

f.

Backfilling
a.
b.

c.

d.

Interlock Paving
a.

b.

c.
PAVING & d.
SURFACING
Precast Kerb Stone
a.

b.

c.

d.

03 CONC
Shuttering (with supports)
a.

b.

c.

d.

e.

f.

g.

h.
CONCRETE i.
FORMWORK
j.

k.

l.

m.

n.

o.

p.

s.

u.

t.

Reinforcement (Lightening for Cut


& Bend Steel)

a.

b.

c.

d.

e.

f.
REINFORCEMENT g.

h.

i.

j.
REINFORCEMENT

k.

l.

l.

Mesh Reinforcement
a.

Casting Concreting (Readymix)


a.

b.

c.

d.

e.

f.

g.

h.

i.
PLACE j.
CONCRETE
k.

l.

m.

n.

o.

p.

q.

r.

s.

u.
v.

04 MASO
Solid Block
a.

Hollow Block
a.

b.
c.

d.

e.

f.

g.

Claustra Block
a.

b.

05 MET

Steel Structure
a.

b.

c.

d.

e.

f.
STRUCTURAL g.
STEEL
h.

i.

j.

k.

l.

m.

n.

o.

07 MOISTURE THE

Polythene Sheets
a.

b.

c.

Bitumin Paint
a.

b.
Bituminous Membranes
a.

Construction Joints
a.

b.

09 FINI
Internal Plaster
a.

b.

c.

d.

PLASTER e.

f.

External Plaster
a.

b.

c.

Mosaic
a.

b.

c.

d.

Ceramic
a.

b.

c.

d.
e.
TILING
f.

g.

h.

PVC Tiles
a.

b.
Marble
a.

b.

c.

d.

Floor Screed (50mm)


SCREED a.

b.

Wooden Skirting
a.

Threshold
a.

False Ceiling
a.

Dry Wall Partition


a.

Tyrolene (Cullamix)
a.

b.

Normal Paint (Emulsion Oil)


WALL a.
COVERINGS
c.

d.

e.

Epoxy Painting
a.

15 MECHA

Copper & PVC Pipes


PLUMBING a.
INSTALLATIONS
b.

c.

d.
Plumbing Fixtures
a.

b.

c.
PLUMBING d.
FIXTURES
e.

f.

g.

h.

i.

PLUMBING Plumbing Appliances


APPLIANCES
a.

16 ELECT

Race Ways
RACE WAYS
a.

b.

CONDUCTORS Conductors & Grounding


& GROUNDING
a.

WIRING Wiring
a.

Boards
BOARDS
a.

b.
PRODUCTIVITY RATES

01 GENERAL REQUIREMENT

Watchman & Curing (Duration x 2H)

Site Cleaning (Dhs. Contract value/ 50,000)


Helper-Day
Fencing 1C + 2H + 1P

Fixing of Light Weight Scaffolding 1C + 1H

02 SITE WORK

Soft Soil (Hand Tools) 1H

Hard Soil (Hand Tools) 1H

Soft Soil -

Hard Soil -

Soft Soil -

Hard Soil -

Filling in foundation, pinth -


Level, Compaction 1H

Spreading 200mm layer (Subkha, Road Base) -

Compaction 200mm layer (Subkha, Road Base) 1H

Compaction / Levelling 2H

Spreading Sand and Brushing 2H

Laying Tiles 1M+2H

Filling, Compaction 1H

Excavation & Blinding for Curbstone 1H

Laying Kerbs 1M+2H

Karb stone on curved lines 1M+1H

Hunching 1M+1H

03 CONCRETE
Shutt. of Blinding 1C+1H

Shutt. of Footing (Plywood) 1C+1H

Shutt. of Footing (Plates) 1C+1H

Shutt. of Slub Column 1C+1H

Shutt. of Strap / Tie Beam (Plywood) 1C+1H

Shutt. of Strap / Tie Beam (Plates) 1C+1H

Shutt. of Wall 1C+1H

Shutt. of Column 20x20 1C+1H

Shutt. of Column 20x40 1C+1H

Shutt. of Beam with support 1C+1H

Shutt. of Roof Slab 1C+2H

Shutt. of Lintel 1C+1H

Shutt. of Copying Beam 20x20cm 1C+1H

Shutt. of Parapet 1C+1H

Shutt. of Arch Lintel 1C+1H

Expansion Joints / Ground Slab 1C+1H

Shutt. of Beam & Column for 8m to 12m high 1C+1H

Shutt. of Staircase 1C+1H

De-shuttering Works 20% of Shuttering Works

Reinf. of Footing 1 SF + 1 H

Reinf. of Slub Column 1 SF + 1 H

Reinf. of Strap Beam 1 SF + 1 H

Reinf. of Tie Beam 1 SF + 1 H

Reinf. of Wall 1 SF + 1 H

Reinf. of Column 1 SF + 1 H

Reinf. of Beam 1 SF + 1 H

Reinf. of Solid Slab 1 SF + 1 H

Reinf. of Lintel 1 SF + 1 H

Reinf. Copying Beam 20x20cm 1 SF + 1 H


Reinf. of Parapet 1 SF + 1 H

Reinf. of Arch Lintel 1 SF + 1 H

Reinf. of Staircase 1 SF + 1 H

Mesh Reinforcement 1 SF + 2 H

Cast. Blinding 5cm 1M+2H

Cast. Blinding 10cm 1M+2H

Cast. Blinding 5cm, 10cm 2M+4H

Cast. of Footing 2M+4H

Cast. of Footing (Pump) 3M+8H

Cast. of Strap / Tie Beam 1M+6H

Cast. of Tie Beam (Pump) 2M+6H

Cast. of Ground Floor Slab 10cm 3M+5H

Cast. of Ground Floor Slab 15cm 3M+5H

Cast. of Ground Floor Slab 20cm 3M+5H

Cast. of Wall 1M+1C+3H

Cast. of Column 1M+4H

Cast. of Beam of Slab 1M+4H

Cast. of Roof Slab 2M+2C+5H

Cast. of Lintel 1M+2H

Cast. of Copying Beam 20x20cm (up to2.5m) 1C+5H

Cast. of Copying Beam 20x20cm (above 2.5m) 1C+5H

Cast. of Parapet 1M+1C+4H

Cast. of Arch Lintel 1M+3H

Casting of Neck Column 1M+3H


Casting of Staircase 1C+1H

04 MASONRY

200mm Solid Block up to 2.5m Height 1M+2H

100mm Hollow Block up to 2.5m Height 1M+1H

100mm Hollow Block - 2.5m to 6m Height 1M+2H


150mm Hollow Block up to 2.5m Height 1M+1H

200mm Hollow Block up to 2.5m Height 1M+1H

200mm Hollow Block - 2.5m to 6m Height 1M+2H

200mm Block Work above 6m Height 1M+2H

200mm Block Work including pointing 1M+1H

Claustra Block 200x200 1M+1H

Claustra Block 150x150 1M+1H

05 METALS

Painting for steel structure columns 1P+1H

Painting for steel structure rafters 1P+1H

Erection of steel structure main frame ( Eave Height up 3E+3H


to 6m span up to 25m)
Erection of steel structure main frame ( Eave Height up 3E+3H
to 6m span up to 36m)
Fixing of Single Skin Sheet (Roof) 3E+3H

Fixing of Single Skin Sheet (Walls) 3E+3H

Single skin with Fibre Glass Insulation (Roof) 3E+3H

Single skin with Fibre Glass Insulation (Wall) 3E+3H

Sandwich Panels (Roof) 3E+3H

Sandwich Panels (Wall) 3E+3H

Corner Fisshing & Trims, etc 1E+3H

4m x 4m Double Sliding Door 1E+3H

Wall or Roof opening + Frames (1.0mx1.0m) 1E+3H

Ridge Ventilator 1E+3H

Gutter / Down Spout 1E+3H

07 MOISTURE THERMAL CONTROL

Polythene under footings 1C+1H

Polythene under slab 1C+1H

Polythene under tie beam 1H

Cold Bituminous Painting 1H

Hot Bituminous Painting 2H


Bituminous Membrane + Protection Board 1C+1H

Flexel Board 1C+1H

Sealant 1H

09 FINISHES

Ceiling Plaster 1M+1H

Wall Plaster up to 3m Height 1M+1H

Wall Plaster 3m to 6m Height 1M+2H

Wall Plaster above 6m Height 1M+2H

Fixing of Plaster Mesh 1C+1H

Fixing of Corner Beed 1M+1H

Wall Plaster up to 3m Height 1M+1H

Wall Plaster 3m to 6m Height 1M+2H

Wall Plaster above 6m Height 1M+2H

Floor Mosaic Tiles 1M+1H

Mosaic Skirting 1M+1H

Mosaic Steps (Riser & Tread) 1M+1H

Mosaic Polishing 1 Po + 1 H

Fixing of Ceramic Wall Tiles (Glur Type) 1M+1H

Grouting of Ceramic Wall Tiles 1M+1H

Fixing of Ceramic Wall Tiles (Cement Monar Type) 1M+1H

Fixing of Ceramic Floor Tiles 20x20cm 1M+1H


Fixing of Ceramic Floor Tiles 30x30cm 1M+1H

Fixing of Ceramic Floor Tiles 50x50cm 1M+1H

Grouting of Ceramic Floor Tiles 1M+1H

Ceramic Skirting 1M+1H

PVC Tiles 1M+1H

PVC Skirting 1M+1H


Marble Wall 1M+1H

Marble Floor 1M+1H

Marble Skirting 1M+1H

Marble Steps (Riser & Treads) 1M+1H

Floor Screed (50mm) 1M+1H

Cement Skirting 1M+1H

Timber 1C+1H

Threshold 1M

False Ceiling - Suspended Type 1C+1H

Dry Wall Partition 1C+1H

Tyrolene over plastered surface 1M+1H

Tyrolene over block wall 1M+1H

Primer 1P

Stucco (Putty) 1P

Emulsion Paint 1P

Oil Paint 1P

Epoxy Painting 1P+1H

15 MECHANICAL

1/2" to 1" Copper Pipe (Hot water) 1 Pl + 1 H

1/2" to 1 1/2" PVC Pipe 1 Pl + 1 H

2" to 3" PVC Pipe 1 Pl + 1 H

4" to 6" PVC Pipe 1 Pl + 1 H


Shower Tray 1 Pl + 1 H

Kitchen Sink 1 Pl + 1 H

Urinals + Partition 1 Pl + 1 H

Wash Basin 1 Pl + 1 H

W/C Asian 1 Pl + 1 H

W/C Western 1 Pl + 1 H

Bidet 1 Pl + 1 H

Booster Pump 1 Pl

Manhole 60cm to 90cm 1M+1H

Water Heater 1 Pl + 1 H

16 ELECTRICAL

Conduits 1 El + 1 H

Trunking 1 El + 1 H

Laying Cables 1 El + 2 H

Wiring 1 El + 1 H

D.B's 1 El + 1 H

M.D.B's 1 El + 1 H

C=Carpenter, M=Mason, P=Painter, SF=Steel


Fitter, E=Erector, H=Helper, Po=Polisher,
Elec=El, Pl=Plumber

One Day is considered as 8 working hours.


Rev. 01 02/11/05

Day -
Day 1
Rm/Day 50
M2/Day 70

Hand Tools M3/Day 3


Hand Tools M3/Day 1
Shovel M3/Hr 40
Shovel M3/Hr 25
JCB M3/Hr 20
J.C.B. M3/Hr 10

Shovel M3/Hr 30
Roller Compr. M2/Day 100
Shovel M2/Hr 100
Roller Compr. M2/Day 200

Roller Compr. M2/Day 200


M2/Day 200
M2/Day 60
Plate Compr. M2/Day 150

R.M/Day 10
R.M/Day 35
R.M/Day 15
R.M/Hr 20
M2/Day 35
M2/Day 15
M2/Day 20
M2/Day 5
M2/Day 12
M2/Day 20
M2/Day 14
M2/Day 10
M2/Day 10
M2/Day 12
M2/Day 10
M2/Day 6
M2/Day 6
M2/Day 12
M2/Day 6
L.M/Day 70
M2/Day 8
M2/Day 12

KG/Day 400
KG/Day 250
KG/Day 300
KG/Day 350
KG/Day 400
KG/Day 300
KG/Day 300
KG/Day 300
KG/Day 150
KG/Day 200
KG/Day 300
KG/Day 150
KG/Day 250

M2/Day 300

M2/Day 30
M2/Day 40
Pump M2/Day 250
M3/Day 40
Pump M3/Day 120
M3/Day 20
Pump M3/Day 50
M3/Day 30
M3/Day 45
M3/Day 50
Pump M3/Day 40
M3/Day 4
M3/Day 12
Pump M3/Day 50
Nos./Hr 4
RM/Day 150
RM/Day 60
Pump M3/Day 10
M3/Day 5
M3/Day 4
M3/Day 12

Nos./Day 140

Nos./Day 150
Nos./Day 140
Nos./Day 150
Nos./Day 180
Nos./Day 140
Nos./Day 100
Nos./Day 120

M2/Day 10
M2/Day 8

M2/Day/ 50
Coat
M2/Day/ 40
Coat
M2/Day 250
M2/Day 175
M2/Day 350
M2/Day 150
M2/Day 250
M2/Day 100
M2/Day 250
M2/Day 150
Rm/Day 80
No. 1
No. 8
No./Day 6
Rm/Day 70

M2/Day 200
M2/Day 1000
Rm/Day 200

M2/Day/ 100
Coat
M2/Day/ 60
Coat
M2/Day 30

RM/Hr 18
RM/Hr 7

M2/Day 10
M2/Day 20
M2/Day 17
M2/Day 15
Rm/Day 90
Rm 30

M2/Day 20
M2/Day 18
M2/Day 15

M2/Day 15
Rm/Day 40
Rm/Day 14
M2/Day 100

M2/Day 10
M2/Day 30
M2/Day 8
M2/Day 12
M2/Day 15
M2/Day 20
M2/Day 40
Rm/Day 30

M2/Day 35
Lm/Day 40
M2/Day 6
M2/Day 15
Rm/Day 30
Rm/Day 10

M2/Day 50
Rm/Day 25

Rm/Day 100

Rm/Day 10

M2/Day 30

M2/Day 20

M2/Day/ 100
Coat
M2/Day/ 100
Coat

M2/Day/ 200
Coat
M2/Day/ 80
Coat
M2/Day/ 100
Coat
M2/Day/ 60
Coat

M2/Day/ 50
Coat

R.M/Day 12
R.M/Day 20
R.M/Day 75
R.M/Day 60
Nos./Day 2
Nos./Day 2
Nos./Day 3
Nos./Day 2
Nos./Day 2
Nos./Day 2
Nos./Day 2
Nos./Day 1
Nos./Day 2

Nos./Day 2

R.M/Day 50
R.M/Day 50

R.M/Day 150

R.M/Day 300

Nos./Day 2
Nos./Day 1