with all
materials. (MS & SS) 80 M3/Hr.
Surrounding the annular space between the tube well and bore
11 hole supplying of graded pea- gravel’s and coarse 500 Cft
sand complete as per standard practice.
Developing/Charging the tube well by pumping method or
12 Compressor charging specified. 1 L.S