2 EXCAVATION WORK
Earth work in excavation below existing ground level in foundations, trenches, in all class
of soil / murrrum except rock up to a depth of 1.50 mtrs. Including shoring, strutting,
dewatering, and disposing off the un useful soil outside the plot boundary complete as
directed by Engineer IN charge.
a ( upto 1.50 )
Do--- as above in depth 0 mtrs. To 1.50 mtrs. 1284.86 210 cmt. 269820.07
b ( upto 3.00 )
Do--- as above in depth 1.50 mtrs. To 3.00 mtrs. 905.15 250 cmt. 226287.19
c Do--- as above in depth 3.0 mtrs. To 4.50 mtrs. R/O cmt.
4 Metalling [ 63-90 mm ]
Providing and laying metal (size 63mm x 90mm) in a layer of 175mm each well
compacted with power roller without damaging foundation filling voids with quarry dust,
watering, ramming, compacting if required for edges and corners use plate compactor 827.28 1900 cmt 1571829.44
etc. complete as directed by Engineer In charge.
PAGE NO:1
8 REINFORCEMENT STEEL FE 500
Providing & Supplying & fixing in position High yield deformed bar Reinforcement
confirming to IS – 1139 or cold Twisted bars, TOR steel / TMT / or Equivalent
Reinforcement bars confirming to IS – 1786 for RCC construction including transporting
(i.e. loading & unloading) the steel from store/issue points to site of works including
unloading from Trucks/Trailers, cleaning, de coiling, cutting, bending to required shape
and lengths as per detailed drawing, binding with 16 SWG black soft annealed binding
wire, placing with proper cover block, support chairs, overlap, spacers, etc. complete in
all respect as directed by Engineer IN charge in foundation and up to Plinth level.
9 SHUTTERING
Providing and erecting in position form work with plate shuttering materials of
approved quality for all type of concrete elements vertical, horizontal or inclined
including scaffolding, stagging, fasteners,locking ,Ties at respective levels necessary
nails, wires, locking pins,Guggus etc keeping in position till concrete is laid and members 1342.63 410 sqm 550478.71
have acquired required strength, removal thereafter, applying shuttering oil etc.
complete as directed by Engineer-in-Charge.
13 Groove cutting
Providing and constructing groove cutting of size 5mm x 50mm deep for floor , including
saw cutting of concrete floors / pavement to the required depth, filling the same with 1614.70 125 rmt 201837.28
polysulpide, etc. complete.as per instruction of Engg in charge.
15 GP2 Grouting
Filling the gap between RCC column, base plate and floor with GP2 Grout of M45 I S I
grout to consume shall confirm to company Equavalient of SIKA make / Fair mate / Dr.
fixit etc. as per I S Specification including the all the over head expesnes and the edges 3.24 62000 cmt 200598.68
shall be shampered etc completed as directed by Engineer Incharge.
16 Re-bar
PAGE NO:2
Providing, drilling & fixing anchor bars in concrete using Hilti HY-150 chemical grout as
per as per manufacturer's specifications. [ necessary pull out test --if recommended by
consulltant have to be proved , which rate shall not be extra paid etc complete as
directed by engg. incharge .
a 8mm dia 506.00 130 NOS 65780.00
b 16mm dia 110.00 275 NOS 30250.00
PAGE NO:3
FOOTING
Sr.
Particular Shape of Bar
no. L B H
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
BAR BENDING SCHEDULE - FOOTING
Dia of
No. of No. of Spacing Length
Shape of Bar Bar in
bar item in mtr in mtr
mm
10 13 4 0.150 2.000
0.150
1.700
10 13 4 0.150 2.000
0.150
1.700
10 7 1 0.150 1.600
0.150
1.300
10 7 1 0.150 1.600
0.150
1.300
0 13 1 0.150 2.000
0.150
0.150
1.700
0 13 1 0.150 2.000
0.150
1.700
0 13 1 0.150 2.000
0.150
1.700
0 13 1 0.150 2.000
0.150
1.700
GRAND TOTAL
Weight in Kg
Total Total wt Total wt Total wt
length in Total wt Total wt
8mm 10mm 16mm
mtr 12mm 20mm
(0.395 (0.617 (1.58
(0.89 kg/mt) (2.47 kg/mt)
kg/mt) kg/mt) kg/mt)
104.000 - 64.168 - - -
104.000 - 64.168 - - -
11.200 - 6.910 - - -
11.200 - 6.910 - - -
26.000 - - - - -
26.000 - - - - -
26.000 - - - - -
26.000 - - - - -
-
-
0.000
PEDESTAL
Sr.
Particular Shape of Bar
no. L B H
4.020
→ VERTICAL-4-12 DIA
4.020
1-SET
0.290
1-SET
0.290
→ VERTICAL16 -25DIA
4.020
→ VERTICAL12 -25DIA
4.020
1-SET 0.210
→ RINGS-8 AT 150C/C (1 -SET)
1-SET
0.210
1-SET
0.210
3.326
→ RINGS-8 AT 150C/C (1 -SET)
1-SET 0.870
0.870
1-SET
0.435
3.326
1-SET 0.150
1-SET
0.150
3.350
1-SET 0.370
1-SET
0.585
REBARE
0.375
BAR BENDING SCHEDULE - PEDESTAL
Dia of Total
No. of No. of Spacing Length
Shape of Bar Bar in length in
bar item in mtr in mtr
mm mtr
0.400
16 4 4 4.820 77.120
0.400
0.400
12 4 4 4.820 77.120
0.400
0.290
0.075 8 66 4 0.150 1.310 345.840
0.075 0.290
0.290
0.290
0.075 10 55 4 0.100 1.310 288.200
0.075 0.290
0.290
1.080
0.075 0 55 4 0.150 2.890 635.800
0.075 0.290
1.080
0.540
0.075 0 55 4 0.150 1.810 398.200
0.075 0.290
0.540
0.075
0.075 0 55 4 0.150 0.440 96.800
0.075
0.400
16 3 1 4.820 14.460
0.400
0.400
12 3 1 4.820 14.460
0.400
0.210
0.075 10 46 1 0.150 0.990 45.540
0.075 0.210
0.210
0.210
0.075 8 71 1 0.150 0.990 70.290
0.075 0.210
0.210
0.290
0.075 0 71 1 0.150 1.150 81.650
0.075 0.210
0.290
0.075
0.100
0 24 11 3.876 1023.264
0.450
2.170
0.075 0 23 11 0.150 6.230 1576.190
0.075 0.870
2.170
2.170
0.075 0 23 11 0.150 5.360 1356.080
0.075 0.435
2.170
1.627
0.075 0 23 11 0.150 5.144 1301.432
0.075 0.870
1.627
1.085
0.075 0 23 11 0.150 4.060 1027.180
0.075 0.870
1.085
0.542
0.075 0 23 11 0.150 2.974 752.422
0.075 0.870
0.542
0.075
0.075
0.100
0 4 5 3.876 77.520
0 2 5 3.876 38.760
0.450
0.150
0.075 0 23 5 0.150 0.750 86.250
0.075 0.150
0.150
0.075 0 23 5 0.150 0.300 34.500
0.075
0.100
0 10 11 3.450 379.500
0.075
8 46 11 0.150 0.450 227.700
0.075
TOTAL
GRAND TOTAL
Weight in Kg
Total wt Total wt Total wt Total wt Total wt
8mm 10mm 12mm 16mm 20mm
(0.395 (0.617 (0.89 (1.58 (2.47
kg/mt) kg/mt) kg/mt) kg/mt) kg/mt)
- - - 121.850 -
- - 68.637 - -
136.607 - - - -
- 177.819 - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - 22.847 -
- - 12.869 - -
- 28.098 - - -
27.765 - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
205.866 - - - -
73.452 - - - -
89.942 - - - -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
0.000
TIE BEAM
Sr.
Particular
no. L B H
→ RINGS-8 AT 150C/C
→ RINGS-8 AT 150C/C
EXTRA TOP
→ RINGS-8 AT 150C/C
BAR BENDING SCHEDULE - GB
Dia of
No. of No. of
Shape of Bar Bar in
bar item
mm
-0.050 12 2 2
-0.050
0.075 8 1 2
-0.050 0.075 -0.050
-0.050
4.670 0 2 4
9.600
0.250 16 2 4
0.180
0.075 8 32 4
0.700 0.075 0.700
0.180
2.450 0 2 4
0.000
0.000 0 24 4
0.180
0.075 8 18 4
0.400 0.075 0.400
0.180
DING SCHEDULE - GB
Weigh
Total wt
Spacing in Length in Total length
8mm Total wt 10mm
mtr mtr in mtr
(0.395 (0.617 kg/mt)
kg/mt)
0.450 2.700 - -
0.450 2.700 - -
-0.050 -0.200 - -
5.170 62.040 - -
5.170 62.040 - -
4.670 37.360 - -
9.850 78.800 - -
2.950 23.600 - -
2.950 35.400 - -
2.450 19.600 - -
0.000 0.000 - -
- - 6.669 -
- - 6.669 -
(0.178) - - -
- - - -
55.216 - - -
- 98.023 - -
- - - -
- 124.504 - -
- - - -
21.004 - - -
31.506 - - -
- - - -
- - - -
- - - -
107.548 222.527 13.338 0.000
477.199
TIE BEAM
Sr.
Particular
no. L B H
→ RINGS-8 AT 150C/C
→ RINGS-8 AT 150C/C
EXTRA TOP
→ RINGS-8 AT 150C/C
BAR BENDING SCHEDULE - TB
Dia of
No. of No. of
Shape of Bar Bar in
bar item
mm
-0.050 0 2 2
-0.050
0.075 0 1 2
-0.050 0.075 -0.050
-0.050
4.670 0 2 4
1.900
0.250 12 2 4
0.180
0.075 8 32 4
0.350 0.075 0.350
0.180
2.450 0 2 4
0.000
0.000 0 24 4
0.180
0.075 8 18 4
0.350 0.075 0.350
0.180
DING SCHEDULE - TB
Weigh
Total wt
Spacing in Length in Total length
8mm Total wt 10mm
mtr mtr in mtr
(0.395 (0.617 kg/mt)
kg/mt)
0.450 2.700 - -
0.450 2.700 - -
-0.050 -0.200 - -
5.170 41.360 - -
5.170 82.720 - -
4.670 37.360 - -
2.150 17.200 - -
2.950 23.600 - -
2.950 35.400 - -
2.450 19.600 - -
0.000 0.000 - -
- - - -
- - - -
- - - -
- - - -
36.810 - - -
73.621 - - -
- - - -
15.308 - - -
- - - -
21.004 - - -
31.506 - - -
- - - -
- - - -
- - - -
178.249 0.000 0.000 0.000
273.839
BAR BENDING SCHEDU
TIE BEAM
Sr.
Particular
no. L B H
0.260 KG/SQF
11571.974
BAR BENDING SCHEDULE - FLOOR
Weight in Kg
Total wt Total wt Total wt
Total wt
8mm Total wt 10mm 12mm 16mm
20mm
(0.395 (0.617 kg/mt) (0.89 (1.58
(2.47 kg/mt)
kg/mt) kg/mt) kg/mt)
11.572
0.000
REINFORCEMENT STEEL CONSUMPTION STATEMEN
REINFORCEMENT STEEL
Sr. No. Item Description
8mm 10mm 12mm
1 FOOTING ----- 142.157 -----
2 PEDESTAL UPTO FFL 533.631 205.918 81.506
3 GB 133.787 ----- 107.548
5 TB 95.590 ----- 178.249
4 FLOORING 11.572 ----- -----
Total in kg :- 774.580 348.074 367.303
WASTAGE 5% 38.729 17.404 18.365