UEMK4114 Plant Design I

Group No. 7 Date 20/01/2023


Assignment No. 3 Revision No. 2

Confirmation of Corrective Action Taken

No. Comments by Lecturers State the action taken with respect to the
comments and page no. of the report / drawing
1 In Area 100, the raw materials are The raw materials are pressurized and remain in
bought in gas phase from the gaseous state in BFD001. The feeds do not need to
suppliers? be in liquid state because our plant is in Kerteh
Biopolymer Park (KBP), Terengganu. It is possible
to install piping between the propene and ammonia
plants and the acrylonitrile production plant. The
raw material can directly transport and use to
produce acrylonitrile.
2 In Area 200, temperature should The temperature condition of Quenching Column is
not be maintained at 220 °C in changed to 31.62 °C in BFD002.
Quenching Column.
3 In Area 300, justify the purpose of The partial condenser unit is removed before the
using compressor, cooler followed Absorber in BFD003.
by partial condenser.
4. In Area 300, temperature should The temperature of the inlet is increased to 43.28 °C
not be maintained at 30 °C in before entered Absorber in BFD003.
Absorber.
5. In Area 300, insignificant pressure 20 kPa of pressure drops is amended at the bottom
drops occur at the bottom outlet of outlet of the Absorber in BFD003.
the Absorber.
6. In Area 400, will water appear as All the physical states of the chemical components
gas/liquid state at 109 °C after the involved before the flash distillation column are
heater? revised and a partial vaporizer is added to allow all
chemicals are in gas/liquid phases before entered
flash distillation column in BFD003.
7. In Area 500, is it necessary to have Condenser, pump and cooler unit are removed and
a cooler to cool down 8 ºC of the only a cooler is involved to cool down the recovery
recovery product? product from 107.6 °C to 73 °C before entered the
Extractive Distillation Column in BFD004.
8. In Area 600, why there is an The temperature condition of the inlet stream and
increase temperature in the the distillation column is changed to 9.934 °C in
distillation column? BFD005.
9. In Area 700, different phases The column used to purify acrylonitrile is
subjected to the purification distillation column and all the physical states of the
column and justify the type of the chemical components involved before the
column used. distillation column are revised in BFD006.
No. Comments by Lecturers State the action taken with respect to the
comments and page no. of the report / drawing
10. All the chemical storage tanks Coolers are installed to lower down the temperature
condition are infeasible as the and pressure of the chemical components before
temperature and pressure of the stored inside the storage tanks in BFD003 and
storage tanks need to be maintained
BFD006.
at high condition.
11. In Area 001, only water involved in All chemical components involved in wastewater
the wastewater treatment process? are listed out before entered settling tank in
BFD008.