Professional Documents
Culture Documents
On Roading Contracting LLC
On Roading Contracting LLC
No of Days
ON ROADING CONTRACTING LLC
28-Aug
29-Aug
30-Aug
31-Aug
10-Sep
11-Sep
12-Sep
13-Sep
14-Sep
15-Sep
16-Sep
17-Sep
18-Sep
1-Sep
2-Sep
3-Sep
4-Sep
5-Sep
6-Sep
7-Sep
8-Sep
9-Sep
DESCRIPTION:-
Mobilization and Safety arrangement
Breaking and removal of existing asphalt,
manhole cover and steel i-beam and cart
to tip DM yard.
Installation of steel I-Beam, Manhole cover 1
with Frame.
Re-instatement of asphalt to match with
existing
Site clearance