RISK ASSESSMENT

WHAT WORK Excavation Work with help of JCB


LOCATION PM Warehouse area Contractor Company- Aalanna Project Pvt Ltd
ACTIVITY SUB ACTIVITY HAZARDS IDENTIFIED CONTROL MEASURES
1. Unauthorized workers at 1. No visitors shall be allowed to enter the work location without having prior permission from Nestle engineering team.
working area 2. A visitor induction training shall be conducted for all the visitors visiting at site and shall be briefed about the site general
1. Manpower mobilization safety rules, site layout plan procedures.
at site

1. Slip, Trip & Fall 1. Mandatory PPE are to be used (Safety shoes, Helmet, Reflective vest, Dust noise mask, Cut-resistant hand gloves, Rubber
2. Hand injurieshand gloves and safety goggles)
3. 3. Ensure protruding rebars caps from rods & 3m tape provide for visible.
2. Surveying & marking use Dust Hazard 4. Remove the unwanted rods.
Total station fixing & Chalk 4. Stumbling over sharp edge of 5. Take work permit to Nestle concern person for before start the activity.
Powder/ lime cut pieces of reinforcement 6. Conducted the TBT before work start and explain the hazards.
rods 7. Training for WMS/ RA briefing with people involve in task.
5. Skin irritation

1. Damage of underground 1. Area to be checked for along with Nestle concern engineer if any Electrical panels or any underground utilities (E.g., High
utilities facilities. Mast Tower, borewell & Utility services) before starting of activity.
2. Electric shock (in case 2. After that take a Ground disturbance work permit to nestle concern person along with electrical team approved get
presence of live cable under before start excavation.
ground & above). 3. Ensure mandatory PPE's be used (Safety shoes, Helmet, Reflective vest, Dust noise mask, and safety goggles & Ear plugs)
1.Mechanical 3. Injury to persons due to hit 4. All moving machines, JCB Swing area and vehicles shall maintain safe distance of 3 meters.
Excavation (JCB) by swinging parts or moving 5. Soft Barricade done while during excavation, after completion ensure the Double hard barricade with color code (1.8m)
vehicles. from the edge of the excavation pit & any person between the barricade and the edge of the pit shall wear fall protection
4. Collapse (full body harness with double lanyard) secured properly with firm support.
soil and excavated material 6. Ensure work area is made clear from all type of material post job completion.
7. If excavation reached more than 1.5 meters, shoring or sloping shall be done as per soil condition.
5.Cave -in's of excavation soil. 8. Continuous inspection on soil conditions for presence of any cracks.
6. Slip, trip and fall into 9. JCB Inspection carryon as per Nestle checklist and keep it the documents ( as per check list)
3. Marking area mechanical excavated pit. 10. Minimum of 1 meter distance must be maintained between the stocking of excess soil and pit, so that due to rain or
Excavation (JCB) other forces the soil should not sweep into the pits.
11. Work shall be executed in competent and continuous close supervision.
12. Excavation work done after provided hard barricading and signages boards.
13. No excavation shall be left without barricades
14. if any equipment's ideal condition need to provide the wheel stopers.
15. All work carry on as per approved Method statement and Risk assessment only.
ACTIVITY SUB ACTIVITY HAZARDS IDENTIFIED CONTROL MEASURES
1. Heavy equipment topple due 1. Before start the work area survey doing along with Nestle concern engineer
to overload and improper 2. Area to be check if any overhead electrical cables or any structure.
access. 3. Ensure excavated area is not blocking the access to the site for men, material and movement
2. Uneven ground 4. Separated soil dumping area provided and that area only soil unloading doing.
condition/loose soil at loading 5. Don't stack the soil hip level
and unloading area may cause 6. Ensure no overloading of Heavy vehicles
toppling of vehicle. 7. Ensure to provide traffic signs and poster at work site.
3. Injury to persons due to hit Workforce to be briefed about.
by moving vehicles. 8. All Dumpers or Equipment's Inspection carryon as per Nestle checklist and keep it the documents ( as per check list)
4.Soil loading/unloading 9. Mandatory PPE's are you provided all equipment's operators & helpers before entry at site.
10. Ensure the equipment's wheel stopers.
11. All Dumper involved in job to provided with reverse horn of audible sound.
12. Signal man to guide movement of dumper with whistle & signaling during soil loading & unloading.
13. All moving machines, JCB and vehicles shall maintain safe distance of 3 meters.

1. Slip, trip 1. Ensure the all mandatory PPE's (Safety shoes, Helmet, Reflective vest, Dust noise mask, Cut-resistant hand gloves, Rubber
1.Mechanical 2. Dust hand gloves and safety goggles).
Excavation (JCB 3. Noise 2. Minimum of 1 meter distance must be maintained between the stocking of excess soil and pit, so that due to rain or
4. Falling object other forces the soil should not sweep/ Fall into the pits.
5. Check the Excavation 5. Used Defective access ladder 3. Work Carryon close supervision only
depth level using station 4. Don't allowed equipment's near pit (3meter) area
level system 5. Ensure access ladder inspected / good condition. -If the trench is 4feet or more deep it should be provided with ladder to
facilitate safe entry and exit. Height of the Ladder should be such that it is 3feet above the excavated pit.

1.Injury to persons due to hit by 1. Install adequate safety signs such as excavation in-progress keep out deep excavation.
swinging parts or moving 2. All moving machines, JCB Swing area and vehicles shall maintain safe distance of 3 meters and area soft barricade.
vehicles. 3. Close the work permit after making the site clean and safe for movement at site
2.Trenches left open for 4. Flagman should be provided in the people movement
extended period. 5. Vehicle movement time authorized person not allowed into excavated pit were strictly follow
6. Soil back filling work 3. Topple of dumper in 6. Work shall be executed in competent and continuous close supervision.
excavated area. 7. No excavation pit shall be left without barricades and safety posters.

SIGNATURE
NAME OF CONTRACTOR ENGINEER / SAFETY DATE

REVIEW AND APPROVAL BY LINE MANAGERS


SIGNATURE
NAME DATE