AGK3738CSOGPowering LNG Worker Camp2021En
AGK3738CSOGPowering LNG Worker Camp2021En
AGK3738CSOGPowering LNG Worker Camp2021En
CUSTOMER
Global Players Joint Venture
L O C AT I O N
Qatar
SECTOR
Oil and Gas
SEGMENT
Midstream
A P P L I C AT I O N
Construction workers
camp power
THE CHALLENGE
KEY FACTS
25 MW
Qatar needed to power their the construction, testing and
construction worker camp commissioning phase of the
during the second phase of project which was expected
Centralised power their midstream project which to take three years. They also
included the construction and needed a fully flexible solution
commissioning, four new 7.8 that could be scaled up as
million ton/year LNG trains, LNG construction is ramped up and
32,000
and condensate storage tanks, the camp size increases to peak,
and a marine operating facility and then decreased in line with
and jetty. the size of the camp and power
Capacity worker camp demand of the project.
THE SOLUTION Our central engineering maintaining redundant
team designed a 25 MW capacity and system
power package using integrity.
25MW of scalable high efficiency thermal
centralised power generators to meet the peak
demand of the man camp
All stepdown transformers,
cabling, and distribution
for 3 years which would be home for throughout the vast man
around 32,000 workers camp was provided. The
at peak. This included a project was fully manned
centralised power plant and 24/7 with expert Aggreko
distribution system. Both technicians and had a N+2
were designed to provide redundancy throughout.
maximum efficiency while
accountability