The document provides specifications for construction projects involving concrete, reinforcing steel, structural steel, masonry, and foundations. It includes requirements for concrete mix designs, reinforcing bar placement and splicing, structural steel materials and welding, masonry unit installation, and foundation inspection and backfill compaction. Minimum concrete cover depths are specified for various structural elements depending on exposure conditions. Maximum water-cementitious ratios and limitations on fly ash content are also defined to ensure adequate corrosion protection of reinforcing steel.
The document provides specifications for construction projects involving concrete, reinforcing steel, structural steel, masonry, and foundations. It includes requirements for concrete mix designs, reinforcing bar placement and splicing, structural steel materials and welding, masonry unit installation, and foundation inspection and backfill compaction. Minimum concrete cover depths are specified for various structural elements depending on exposure conditions. Maximum water-cementitious ratios and limitations on fly ash content are also defined to ensure adequate corrosion protection of reinforcing steel.
The document provides specifications for construction projects involving concrete, reinforcing steel, structural steel, masonry, and foundations. It includes requirements for concrete mix designs, reinforcing bar placement and splicing, structural steel materials and welding, masonry unit installation, and foundation inspection and backfill compaction. Minimum concrete cover depths are specified for various structural elements depending on exposure conditions. Maximum water-cementitious ratios and limitations on fly ash content are also defined to ensure adequate corrosion protection of reinforcing steel.
CONCRETE MAXIMUM WATER SOLUBLE CHLORIDE ION CONCENTRATIONS IN HARDENED CONCRETE AT AGES FROM GENERAL 28 TO 42 DAYS CONTRIBUTED FROM THE INGREDIENTS 1. THE STRUCTURAL DRAWING SHALL BE USED IN INCLUDING WATER, AGGREGATES, CEMENTITIOUS CONJUNCTION WITH THE SPECIFICATIONS, THE MATERIALS, AND ADMIXTURES SHALL NOT EXCEED 0 15% BY ARCHITECTURAL, MECHANICAL, ELECTRICAL AND CIVIL WEIGHT OF CEMENT. DRAWING.
2. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND
CONDITIONS AT THE SITE, WHICH SHALL INCLUDE THE LOCATION AND DIMENSIONS OF OPENINGS, GROOVES, 3. REINFORCING BARS SHALL BE FREE OF RUST, GREASE OR REGLETS, PIPE SLEEVES, CONDUIT, EMBEDDED OR ATTACHED OTHER MATERIALS LIKELY TO IMPAIR BOND. ITEMS TO CONCRETE, ETC. 4. ALL REMFORCING BARS SHALL BE ACCURATELY AND SECURELY PLACED BEFORE POURING CONCRETE OR 3. THE CONTRACTOR SHALL PROVIDE ALL MEASURES APPLYING MORTAR OR GROUT. NECESSARY TO PROTECT NEW AND EXISTING CONSTRUTION. THIS SHALL INCLUDE BUT NOT BE LIMITED TO BRACING AND 5. BAR SPLICES SHALL BE SECURELY WIRED TOGETHER. SHORING FOR LOADS IMPOSED DURING CONSTRUTION. SPLICES IN REINFORCED CONCRETE BEAMS, COLUMNS AND WALLS SHALL BE AS SHOWN IN THE DETAILS. FOR NON 4. ALL DIMENSIONS TAKE PRECEDENCE OVER SCALE SHOWN STRUCTURAL WALLS, MASONRY WALLS AND SLABS, SPLICES ON PLANS, SECTION AND DETAILS. SHALL LAP A MINIMUM OF 40 BAR DIMEN AND SHALL BE STAGGERED WHEREVER POSSIBLE. 5. GENERAL NOTES AND TYPICAL DETAILS APPLY TO ALL 6. SPLICES REQUIRED IN THE REINFORCEMENT OF BEAMS DRAWINGS UNLESS OTHERWISE SHOWN OR NOTED. GIRDERS FRAMING INTO COLUMNS SHALL NOT BE LOCATED WITHIN THE COLUMN NOR WITHIN A DISTANCE OF TWICE 6. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS THE BEAM/GIRDER DEPTH FROM THE FACE OF THE COLUMN OTHERWISE NOTED. AT LEAST TWO CLOSED STIRRUPS TIES SHALL BE PROVIDED AT ALL SPLICES. 7. ALL BAR DIAMETERS AND SPACINGS ARE IN MILLIMETERS 7. LAP SPLICES SHALL BE MADE WITHIN THE CENTER HALF UNLESS OTHERWISE NOTED. OF COLUMN HEIGHT, AND THE SPLICE LENGTH SHALL NOT BE LESS THAN 13 TIMES THE DEVELOPMENT LENGTH. 8. ALL FOUNDATIONS SHALL REST ON 50 THE LEAN CONCRETE UNLESS OTHERWISE SHOWN OR NOTED. 8. SPECIAL TIES/TRANSVERSE HOOP REINFORCEMENT SHALL BE PROVIDED WITHIN THE BEAN- COLUMN JOINT. 9. DOWEL BARS SHALL NEVER BE BENT DURING CONCRETE CONCRETE & REINFORCING STEEL FOURING OPERATIONS AND STRAIGHTENED UP DURING REMOVAL OF FORM IN PREPARATION FOR CHB WORKS. 1. FOR NON-COROSSIVE ENVIRONMENT, MINIMUM CONCRETE COVER FOR ALL REINFORCING BARS SHALL BE AS FOLLOWS: STRUCTURAL STEEL A. CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH-75mm 1. ALL MATERIALS AND WORKMANSHIP SHALL CONFORM B. FORMED SURFACES EXPOSED TO EARTH OR WITH THE EDITION OF THE AMERICAN INSTITUTE OF STEEL WEATHER Ø 16 BARS OR SMALLER 40mm OTHER CONSTRUCTION (AISC) MANUAL UNLESS OTERWISE SHOWN BARS.-50mm OR NOTED. C. FORMED SURFACES NOT EXPOSED DIRECTLY TO 2. CONTRACTOR SHALL FURNISHED ALL PLATES, CLIP EARTH ANGLES, CONNECTORS, ETC REQUIRED FOR THE SLABS AND WALLS-20mm COMPLETION OF THE STRUCTURE EVEN IF EVERY SUCH ITEM BEAMS AND COLUMNS 40mm IS NOT SHOWN ON THE CONTRACT DRAWING. 3. WELDING SHALL BE IN ACCORDANCE WITH THE AMERICAN 2. FOR CONCRETE EXPOSED TO COROSSIVE ENVIRONMENT. WELDING SOCIETY CODE AWS D11 UNLESS INDICATED, WELDING ELECTRODES SHALL BE E70 XX. 2.1 SIZES OF BEAMS AND COLUMNS AND THICKNESS OF 4. ALL BOLTS AND THREADED FASTENERS SHALL BE ASTM WALLS AND SLABS SHALL BE INCREASED TO SATISFY THE A307 UNLESS OTHERWISE NOTED. FOLLOWING MINIMUM CONCRETE COVER REQUIREMENT. A. BEAMS AND COLUMNS (FORMED CONCRETE 5. ALL ANCHOR BOLTS SHALL BE ASTM A525 UNLESS SURFACES) NOT EXPOSED TO EARTH 50 mm. EXPOSED OTHERWISE NOTED. TO EARTH 75 mm B. WALLS AND SLABS (FORMED CONCRETE SURFACES) MASONRY NOT EXPOSED TO EARTH-50mm EXPOSED TO EARTH 65 mm 1. ALL CONCRETE HOLLOW BLOCKS MASONRY WALLS SHALL C. FOOTINGS 75 mm LAID IN RUNNING BOND (INTERLOCKING COURSE) WITH FULL MORTAR BEDDING, STOCK BOND SHALL BE USED ONLY WHEN 2.2 MAXIMUM WATER-CEMENTITIOUS RATIO, SHALL NOT SPECIFIED. EXCEED 0.40 BY WEIGHT 2. ALL CELLS SHALL BE SOLIDLY FILLED WITH CONCRETE GROUT. 2.3 FLY-ASH OR POZZOLAN MAY BE MIXED WITH CEMENT THAT THE FLY ASH OR POZZOLAN CONTENT SHALL NOT EXCEED 25% BY WEIGHT OF THE TOTAL CEMENTITIOUS FOUNDATION MATERIALS 1. THE STRUCTURAL ENGINEER-OF-RECORD, UPON SELLELLATIE NOTIFICATION, SHALL CONDUCT A THOROUGH INSPECTION OF THE FOUNDATION WORKS AFTER EXCAVATION FOR FOOTINGS ARE COMPLETE AND ANY REQUIRED REINFORCING STEEL IS IN PLACE. FRAMEWORKS SHALL BE IN PLACE PRIOR TO INSPECTION. CONCRETE POURING OF THE FOUNDATION SYSTEM SHALL NOT BE ALLOWED WITHOUT FIRST OBTAINING WRITTEN APPROVAL FROM THE STRUCTURAL ENGINEER OF RECORDS.
2. ALL FILL AND BACKFILL MATERIALS ARE COMPACTED IN
LIFTS NOT EXCEEDING 150 mm THICK FILL AND BACKFILLING MATERIALS SHALL BE COMPOSED OF GRANULAR MATERIALS LESS THAN 7% FINES COMPACTED TO MINIMUM 95% MDD BASED ON ASTM D-698 WITH THE QUALITY OF COMPACTION STRICTLY MONITORED BY FIELD DENSITY TEST (ASTM D-1556)