BTQS 2013 PRICE ANALYSIS FOR BUILDING WORKS ASSIGNMENT

RQS3
1 GROUP 8 GROUP LEADER : TAN JIA HE

MATERIAL RATE
SOURCE ABBREVIATION
Building Cost Information Services Malaysia (BCISM) Cost Book 2021 BICSM
Dynaloc Sdn. Bhd. DYNALOC
eWAREHOUSE.my EWAREHOUSE
Lazada LAZADA
Price Analysis Lecture Note NOTE
Quantity Surveyor Online QSO
Reliance Home RH
Shopee SHOPEE
SingTex Hardware SINGTEX

CATEGORY PAGE
RAW MATERIALS 2
PLYWOOD 2
WATERPROOFING 2
READY-MIXED CONCRETE 2
REINFORCEEMENT - BRC 2
REINFORCEEMENT - STEEL BAR 2
REINFORCEEMENT - OTHERS 2
BRICKWORK 2
DOOR - METAL DOOR 2
DOOR - TIMBER DOOR 2
WINDOW 3
ROOFING 3
FINISHES - TILES 3
FINISHES - PAINTING 3
FINISHES - FLOOR FINISHES 3
FINISHES - CEILING FINISHES 3
FINISHES - OTHERS 3
MISCELLANEOUS 4
MISCELLANEOUS 4

MATERIAL RATE : 1/
BTQS 2013 PRICE ANALYSIS FOR BUILDING WORKS ASSIGNMENT
RQS3
1 GROUP 8 GROUP LEADER : TAN JIA HE

DESCRIPTION RM UNIT SOURCE


Ordinary Portland Cement 14.50 m3 BCISM
Sand 34.50 tonne QSO
PLYWOOD
9mm thick plywood, (4'x8') (2nd grade) 32.50 piece QSO
12mm thick plywood, (4'x8') 58.00 piece LAZADA
WATERPROOFING
Polythene sheet (12' x 180' x 0.25mm thick) 155.00 roll QSO
READY-MIXED CONCRETE
Grade 15 (Normal mix) 193.00 m3 QSO
Grade 25 (Normal mix) 179.00 m3 QSO
REINFORCEMENT
BRC
BRC A10 (After 54% rebate) 252.60 sheet QSO
BRC A8 (After 54% rebate) 162.12 sheet QSO
BRC A7 (After 54% rebate) 123.87 sheet QSO
BRC A6 (After 54% rebate) 91.08 sheet QSO
REINFORCEMENT
STEEL BAR
High tensile not exceeding 12mm ø 3,330.00 tonne QSO
High tensile exceeding 12mm ø but n.e. 32mm ø 3,180.00 tonne QSO
High tensile 40mm ø 3,280.00 tonne QSO
Mild steel bar 6mm ø 3,400.00 tonne QSO
Mild steel bar 10mm ø 3,450.00 tonne QSO
Mild steel bar 12mm ø 3,450.00 tonne QSO
OTHERS
Spacer (inclusive waste) 3.00 tonne NOTE
Tie wire (inclusive waste) 3.50 kg NOTE
BRICKWORK
Cement and Sand brick 0.27 piece QSO
Common brick 0.35 piece QSO
Exmet (75mm x 120') 17.00 roll QSO
DOOR
METAL DOOR
Metal Door Frame c/w accessories (900mm x 2100mm) 100.00 no. SHOPEE
TIMBER DOOR
HDF timber door leaf panel (857mm x 2108mm) 179.00 no. LAZADA
Hollow core timber door leaf panel (33.75" x 82") 120.00 no. LAZADA
Solid timber door leaf panel (67" x 83") 2,180.00 no. LAZADA

WINDOW
Top hung window overall size 800mm x 600mm high (Type W6) 460.00 no. LAZADA

MATERIAL RATE : 2/
BTQS 2013 PRICE ANALYSIS FOR BUILDING WORKS ASSIGNMENT
RQS3
1 GROUP 8 GROUP LEADER : TAN JIA HE

Casement window Type W1 overall size 600mm x 1100mm


1100mm side hung panel and complete with 6mm thick
Casement window Type W1 overall size 600mm x 255.00 no. LAZADA
1100mm
Casementside hungType
window panelW2
andoverall
complete
size with 6mm xthick
1200mm 1100mm 375.00 no. LAZADA
Casement window
green tinted glass Type W3 overall size 2700mm x1400mm
144.00 no. LAZADA
1100mm
ROOFING
1''x 2''x8 ft timber batten 5.99 no. SHOPEE
Corrugated zinc sheet 2' x 10' 8.62 m2 QSO
Galvanized Iron Chicken Wire Mesh (4' x 60') 48.65 roll LAZADA
Jaguar Nails (500g) 3.80 pack SHOPEE
Monier Elabana Standard 3 Way Apex roof tile (width 250mm) 20.00 no. SHOPEE
Monier Radenshield SF woven foil 1.22m (w) x 48m (L) 200.00 roll SHOPEE
Monier-Nordica' concrete roofing tiles 400mm x 330mm 2.00 piece SHOPEE
Mornier standard hip tile 420mm x 250mm 5.51 piece SHOPEE
Mornier standard ridge tile 420mm x 250mm 5.51 piece SHOPEE
Tile clip 0.30 no. NOTE
FINISHES
TILES
300mm x 300mm Ceramic floor tiles 2.01 piece QSO
600 mm x 600 mm Porcelain floor tiles (1st grade) 17.50 piece QSO
FINISHES
PAINTING
Jotun 5100 Wall Sealer for Exterio - 18L 198.00 no LAZADA
Jotun Paint 5200 Interior Wall Sealer - 20L 208.00 no SHOPEE
Jotun Paint 9000 Gloss Finish - 5L 119.00 no SHOPEE
Jotun Paint 9000 Undercoat - 5L 150.00 no SHOPEE
Jotun Super Matex Emulsion Paint Interior - 18L 82.00 no SHOPEE
Jotun Weatherbond Solareflect - 20L 520.00 no SHOPEE
Jotun Zinc Chromate Primer Grey Green - 20L 330.00 no SHOPEE
FLOOR FINISHES
Dynaloc Wild Oak (D-0925) 1217mm x 195mm x 8.3mm (8 pieces/box) 59.45 box DYNALOC
PVC Profile L1350 (4.4 feet) x W10mm x H15mm 7.00 piece SHOPEE
PVC skirting 12mm x 70mm x 2400mm 16.00 piece SHOPEE
Selleys silicon sealant S301- clear 8.68 no. SHOPEE
CEILING FINISHES
9mm thick fibrous plasterglass ceiling board (1.22m x 1.83m) 13.50 piece SHOPEE
ASG-GB9 9mm thick water resistant gypsum board (1.22m x 2.44m) 17.50 piece EWAREHOUSE
FAITAPEJOINT scrim cloth (50mm x 90m) 64.00 roll FRUUGO
MK Drywall 3.3mm ø screw #06x1" (1000 pieces/box) 16.90 box SHOPEE
UAC Superflex Ceiling Asbestos 4' x 4' (1220mm x 1220mm x 3.2mm) 10.00 piece SINGTEX
USG-BORAL MAXI SKIM 88 skimming compound (25KG NET/15.2L) 28.62 no. LAZADA
OTHERS
Colour cement pointing (inclusive waste) 0.80 m2 NOTE
Tile adhesive (25kg) 21.80 bag QSO

MISCELLANEOUS
Anti Termite Chemical 3.00 m2 CONTRACTOR

MATERIAL RATE : 3/
BTQS 2013 PRICE ANALYSIS FOR BUILDING WORKS ASSIGNMENT
RQS3
1 GROUP 8 GROUP LEADER : TAN JIA HE

LABOUR RATE
SOURCE ABBREVIATION
Quantity Surveyor Online QSO
Building Cost Information Services Malaysia (BCISM) Cost Book 2021 BCISM
Price Analysis Lecture Note NOTE

DESCRIPTION RM UNIT
01 GENERAL
Unskilled/general labour 85.00 day
Semi-skilled labour 100.00 day
Skilled labour 140.00 day

02 SPECIALISED LABOUR
Barbender 120.00 day
Bricklayer 120.00 day
Carpenter 95.00 day
Fitter 95.00 day
Joiner 12.00 hour
Painter 130.00 day
Plasterer 130.00 day
Roofer 10.00 hour
Spreader (same rate with plasterer as per lecture note) 130.00 day
Tiller 90.00 day
Concretor 75.00 day
Plumber 95.00 day
Drainlayer 110.00 day
Turf Layer 95.00 day
Foreman 130.00 day
Excavated Operator 95.00 day
Backhoe Loader Operator 95.00 day
Roller/Compactor Operator 95.00 day
Mobile Crane Operator 95.00 day
Dump Truck Operator 75.00 day
Bulldozer Operator 95.00 day
Wheel Loader Operator 95.00 day

LABOUR RATE : 4/
BTQS 2013 PRICE ANALYSIS FOR BUILDING WORKS ASSIGNMENT
RQS3
1 GROUP 8 GROUP LEADER : TAN JIA HE

PLANT & EQUIPMENT RATE


SOURCE ABBREVIATION
Quantity Surveyor Online QSO
Kyusen Machinery Enterprise KYUSEN
Jabatan Pengairan dan Saliran Malaysia JPS
Ringgit Plus RP

DESCRIPTION RM UNIT SOURCE


01 PLANT
Moblie crane, 20 tonne ( including diesel for day only) 750.00 day QSO
10/7 Hisaki Concrete Mixer, Model: YM7T 750.00 week KYUSEN
Lorry with driver; 6 wheels 400.00 day
Lorry with driver; 6 wheels long body 500.00 day
Lorry with driver; 10 wheels 600.00 day
Lorry crane, 8 tonne 6 wheels; with driver 550.00 day
Lorry crane, 15 tonne 10 wheels; with driver 1,100.00 day
Lorry crane, 8 tonne 6 wheels; without driver 420.00 day
Backhoe 800.00 day
Backhoe 8,000.00 month
Backhoe C/W breaker 550.00 day
Excavator (Exclude diesel) 1,000.00 day
Excavator (Exclude diesel) 7,000.00 month
40' Cargo trailer 1,200.00 Trip
Mobile crane, 16 tonne ( including diesel for day only ) 600.00 day
Mobile crane, 20 tonne ( including diesel for day only ) 750.00 day
Mobile crane, 25 tonne ( including diesel for day only ) 950.00 day
Mobile crane, 35 tonne ( including diesel for day only ) 1,300.00 day
Mobile crane, 45 tonne ( including diesel for day only ) 1,600.00 day
Mobile crane, 55 tonne ( including diesel for day only ) 2,400.00 day
Mobile crane, 60 tonne ( including diesel for day only ) 2,500.00 day
Mobile crane, 80 tonne ( including diesel for day only ) 3,000.00 day
Mobile crane, 85 tonne ( including diesel for day only ) 3,200.00 day
Mobile crane, 120 tonne ( including diesel for day only ) 4,500.00 day
Mobile crane, 110 tonne ( including diesel for day only ) 4,000.00 day
Mobile crane, 160 tonne ( including diesel for day only ) 7,500.00 day
Mobile crane, 200 tonne ( including diesel for day only ) 7,500.00 day
Tower crane with operator 22000.00 month
Tower crane's operator 6,000.00 month
skylift 25 meter 650.00 day
skylift 26 meter C/W operator 500.00 day
skylift 54 meter C/W operator 2,200.00 day
Gondola Counterweight system (4 meter) 1,700.00 month
02 EQUIPMENT

PLANT & EQIPMENT RATE : 5/


BTQS 2013 PRICE ANALYSIS FOR BUILDING WORKS ASSIGNMENT
RQS3
1 GROUP 8 GROUP LEADER : TAN JIA HE

Portable Concrete Vibrator up to and including 1 3/4" ( 45 mm ) 11.25 hour JPS


20 KVA Generator Set 700.00 month
50 KVA Generator Set 1,300.00 month
60 KVA Generator Set 1,500.00 month
Bar Cutter machine 450.00 month
Bar Bending Machine 450.00 month
Road Roller Compactor,1 tonne 900.00 month
25 Tonne Vibrate Roller 550.00 day
25 Tonne Vibrate Roller 8,300.00 month
Concrete pump truck 36m boom 17.00 M3
Mortar pump C/W electric motor 2,150.00 month
Screed pump C/W electric motor, capacity 270 liter 3,009.93 month
Screed pump C/W electric motor, capacity 500 liter 2,600.00 month
Air compressor C/W diesel; capacity 390 CFM 2,000.00 month
Air compressor C/W diesel; capacity 265 CFM 2,000.00 month
Concrete Mixer 300/200 litres 420.00 month
Vibrator 38mm 270.00 Purchase
Scaffold - Main frame 1219 x 1700 mm (New) 33.00 Purchase
Scaffold - Main frame 1219 x 1700 mm ( Second hand) 1.80 Purchase
Scaffold - Main frame 1219 x 914 mm (New) 25.50 Purchase
Scaffold - G.I cross brace 1219 x 1829 mm (New) 7.30 Purchase
Scaffold - G.I cross brace 1219 x 1829 mm (Second hand) 0.80 Purchase
Scaffold - Joint pin 225 mm (New) 1.00 Purchase
Scaffold - Joint pin 225 mm (Second hand ) 0.20 Purchase
Scaffold - U Head 600 mm (New) 12.00 Purchase
Scaffold - U Head 600 mm (Second hand) 1.00 Purchase
Scaffold - Jack base 600 (New) 11.30 Purchase
Scaffold - Jack base 600 (Second hand) 1.00 Purchase
Scaffold - Swivel clamp 48.6 mm (Second hand) 0.50 Purchase
Scaffold - Fixed clamp 48.6mm (Second hand) 0.50 Purchase
Scaffold - GI Pipe 48.6mm 2.00mm x 6m 5.00 Purchase
Scaffold - GI Pipe 48.6mm 2.00mm x 3m 2.80 Purchase
Wall Tie 1200mm 1.40 Purchase
Vibrator plater compactor 60.00 day

03 FUEL
Diesel for concrete mixer 2.15 litre RP

PLANT & EQIPMENT RATE : 6/


BTQS 2013 PRICE ANALYSIS FOR BUILDING WORKS ASSIGNMENT
RQS3
1 GROUP 8 GROUP LEADER : TAN JIA HE

PLANT & EQIPMENT RATE : 7/


BTQS 2013 PRICE ANALYSIS FOR BUILDING WORKS ASSIGNMENT
RQS3
1 GROUP 8 GROUP LEADER : TAN JIA HE

OTHER RATES
SOURCE ABBREVIATION
Price Analysis Lecture Note NOTE
Building Cost Information Services Malaysia (BCISM) Cost Book 2021 BCISM
Assumption ASM

DESCRIPTION RM UNIT SOURCE


WAGES BASED ON WORKS
Pointing 3.00 m2 NOTE
Unloading & stacking of steel bar 5.00 tonne NOTE

ALL IN RATES
EXCAVATION
Excavation up to 1.50m deep (All in rate) 18.00 m3 BCISM
ROOF
Roof trussses (All in rate) 175.00 m2 ASM
FLOOR FINISHES
Extra over for working around floor trap (All in rate) 5.00 no ASM

OTHER RATE : 8/