Schedule of Rate
Schedule of Rate
RQS3
1 GROUP 8 GROUP LEADER : TAN JIA HE
MATERIAL RATE
SOURCE ABBREVIATION
Building Cost Information Services Malaysia (BCISM) Cost Book 2021 BICSM
Dynaloc Sdn. Bhd. DYNALOC
eWAREHOUSE.my EWAREHOUSE
Lazada LAZADA
Price Analysis Lecture Note NOTE
Quantity Surveyor Online QSO
Reliance Home RH
Shopee SHOPEE
SingTex Hardware SINGTEX
CATEGORY PAGE
RAW MATERIALS 2
PLYWOOD 2
WATERPROOFING 2
READY-MIXED CONCRETE 2
REINFORCEEMENT - BRC 2
REINFORCEEMENT - STEEL BAR 2
REINFORCEEMENT - OTHERS 2
BRICKWORK 2
DOOR - METAL DOOR 2
DOOR - TIMBER DOOR 2
WINDOW 3
ROOFING 3
FINISHES - TILES 3
FINISHES - PAINTING 3
FINISHES - FLOOR FINISHES 3
FINISHES - CEILING FINISHES 3
FINISHES - OTHERS 3
MISCELLANEOUS 4
MISCELLANEOUS 4
MATERIAL RATE : 1/
BTQS 2013 PRICE ANALYSIS FOR BUILDING WORKS ASSIGNMENT
RQS3
1 GROUP 8 GROUP LEADER : TAN JIA HE
WINDOW
Top hung window overall size 800mm x 600mm high (Type W6) 460.00 no. LAZADA
MATERIAL RATE : 2/
BTQS 2013 PRICE ANALYSIS FOR BUILDING WORKS ASSIGNMENT
RQS3
1 GROUP 8 GROUP LEADER : TAN JIA HE
MISCELLANEOUS
Anti Termite Chemical 3.00 m2 CONTRACTOR
MATERIAL RATE : 3/
BTQS 2013 PRICE ANALYSIS FOR BUILDING WORKS ASSIGNMENT
RQS3
1 GROUP 8 GROUP LEADER : TAN JIA HE
LABOUR RATE
SOURCE ABBREVIATION
Quantity Surveyor Online QSO
Building Cost Information Services Malaysia (BCISM) Cost Book 2021 BCISM
Price Analysis Lecture Note NOTE
DESCRIPTION RM UNIT
01 GENERAL
Unskilled/general labour 85.00 day
Semi-skilled labour 100.00 day
Skilled labour 140.00 day
02 SPECIALISED LABOUR
Barbender 120.00 day
Bricklayer 120.00 day
Carpenter 95.00 day
Fitter 95.00 day
Joiner 12.00 hour
Painter 130.00 day
Plasterer 130.00 day
Roofer 10.00 hour
Spreader (same rate with plasterer as per lecture note) 130.00 day
Tiller 90.00 day
Concretor 75.00 day
Plumber 95.00 day
Drainlayer 110.00 day
Turf Layer 95.00 day
Foreman 130.00 day
Excavated Operator 95.00 day
Backhoe Loader Operator 95.00 day
Roller/Compactor Operator 95.00 day
Mobile Crane Operator 95.00 day
Dump Truck Operator 75.00 day
Bulldozer Operator 95.00 day
Wheel Loader Operator 95.00 day
LABOUR RATE : 4/
BTQS 2013 PRICE ANALYSIS FOR BUILDING WORKS ASSIGNMENT
RQS3
1 GROUP 8 GROUP LEADER : TAN JIA HE
03 FUEL
Diesel for concrete mixer 2.15 litre RP
OTHER RATES
SOURCE ABBREVIATION
Price Analysis Lecture Note NOTE
Building Cost Information Services Malaysia (BCISM) Cost Book 2021 BCISM
Assumption ASM
ALL IN RATES
EXCAVATION
Excavation up to 1.50m deep (All in rate) 18.00 m3 BCISM
ROOF
Roof trussses (All in rate) 175.00 m2 ASM
FLOOR FINISHES
Extra over for working around floor trap (All in rate) 5.00 no ASM
OTHER RATE : 8/