F136 Drops of Spring Mitts

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

F136

Drops of Spring Mitts


by Quinn Reverendo

All efforts were made to make this pattern error-free. For questions or support, please email: info@fairmountfibers.com
7/10/19 © Fairmount Fibers Ltd. 2019 Not to be reproduced or re-knit for profit page 1 of 3
F136

SIZE ABBREVIATIONS
Women’s Medium beg: beginning
7½” circumference when stretched dpn: double-pointed needles
k: knit
MATERIALS m: marker
Manos del Uruguay ALEGRIA GRANDE BOCADOS (75% m1L: inser t left needle under horizontal strand between stitch
superwash merino wool, 25% polyamide; approx. 25g / 49 just worked and next stitch from the front to the back, knit
yds), 1 each of colors A, B, and C . through the back loop (1 st increased)
Shown in AGB2419 Oceano (A), AGB2363 Tahiti (B), and m1R: inser t left needle under horizontal strand between
AGB2020 Spirulina (C). stitch just worked and next stitch from the back to the front,
knit through the front loop (1 st increased)
US 6 / 4 mm dpn, or size to obtain gauge p: purl
US 4 / 3.5 mm dpn pm: place marker
2 ring markers rnd(s): round(s)
Stitch holder rep: repeat
Tapestr y needle slm: slip marker
st(s): stitch(es)
GAUGE
24 sts and 28 rounds = 4” in Stockinette st (knit all sts ever y
rnd)

All efforts were made to make this pattern error-free. For questions or support, please email: info@fairmountfibers.com
7/10/19 © Fairmount Fibers Ltd. 2019 Not to be reproduced or re-knit for profit page 2 of 3
F136

INSTRUCTIONS Change to smaller ndls.


With smaller dpn use Color A to cast on 40 sts. Join in the
round, being careful not to twist. Pm to show beg of rnd. Rnds 46-49: With C, *k2, p2; rep from * to end of rnd.
Bind off in pattern.
Rnds 1-4: *K2, p2; rep from * to end of rnd.
Thumb: Return held sts to smaller dpn. With Color C, pick up
Change to larger dpn and beg Char t A, repeating char ted sts and knit one st between back and palm of mitt. (20 sts)
10 times in each rnd.
Rnds 1-4: *K2, p2; rep from * to end of rnd.
Rnd 19: Complete Char t A, pm, work m1L for beg of Thumb Bind off in pattern.
Char t.
Rnd 20: Complete Char t A, slm, work Rnd 20 of Thumb Work second mitt the same.
Char t.
Continue on in this manner until Rnd 38 is complete FINISHING
(including Thumb Char t). Weave in ends; block if desired.
Next rnd, separate thumb gusset sts: Complete char t A,
remove marker and place all 19 sts of the thumb onto stitch
holder or waste yarn.
Continue working Char t A through Rnd 45.

45
44
43
42
41
40
39
38
37
36
35
34
33
32
31
30
29 M1L
28
27 M1R
26
25 m make 1
24
23
22
21
20
m 19
18
17
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
All efforts were made to make this pattern error-free. For questions or support, please email: info@fairmountfibers.com
7/10/19 © Fairmount Fibers Ltd. 2019 Not to be reproduced or re-knit for profit page 3 of 3

You might also like