F140 Rise and Shine Hat Cowl

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

F140

Rise and Shine Hat + Cowl


by Sarah Chapman

All efforts were made to make this pattern error-free. For questions or support, please email: info@fairmountfibers.com
8/22/19 © Fairmount Fibers Ltd. 2019 Not to be reproduced or re-knit for profit page 1 of 3
F140

SIZE INSTRUCTIONS
Cowl: 24” circumference x 8” tall Hat
Hat: Adult Medium: 16” circumference (stretches to 24”), 8” Using US11 16” ndl and C2, CO 48 sts. Join, being careful
deep not to twist, and pm to show beg of rnd.

MATERIALS Rnds 1-5: *K1, p1; rep from * to end of rnd.


Manos del Uruguay FRANCA (100% superwash merino wool;
approx. 114 yds/150g), 1 skein each C1 and C2. Shown in Rnd 6: With C2, k.
F9027 Ribbon (C1) and F9050 Par ty (C2). Rnd 7: With C1, *k2, sl1 wyib, k1; rep from * to end of rnd.

US10 / 6mm ndl, 24” circular Repeat rnds 6 and 7 for 18 more rnds. Repeat Rnd 7 once
US11 / 8mm ndl, 24” and 16” circular and dpn, or size to more.
obtain gauge
Stitch marker Shape crown: Change to dpn when necessar y.
Tapestr y needle
Decrease rnd 1: With C2, *k1, CDD, k4; rep from * to end of
GAUGE rnd. 36 sts.
One rep of slipped stitch patt, including one slipped st = 1.5”
3 rnds in st st = 1” ver tical Next round: With C1, *k1, sl1 wyib, k2, sl1 wyib, k1; rep from
* to end of rnd..
ABBREVIATIONS
beg: beginning
CDD: Centered Double Decrease: slip 2 stitches together
knitwise to right ndl; knit next st on left ndl; on right ndl, sl
2 slipped sts over the knitted st and off the ndl (2 stitches
decreased)
CO: cast on
dpn: double-pointed needle(s)
k: knit
ndl: needle
p: purl
patt: pattern
pm: place marker
rep: repeat
rnd(s): round(s)
sl: slip
st(s): stitch(es)
wyib: with yarn in back

All efforts were made to make this pattern error-free. For questions or support, please email: info@fairmountfibers.com
8/22/19 © Fairmount Fibers Ltd. 2019 Not to be reproduced or re-knit for profit page 2 of 3
F140

Decrease rnd 2: With C2, *k3, CDD; rep from * to end of Cowl
rnd. 24 sts. Using US10 24” ndl and C1, CO 68 sts. Join, being careful not
to twist, and pm to show beg of rnd.
Next round: With C1, *k1, sl1 wyib; rep from * to end of rnd.
Rnds 1-4: *K1, p1; rep from * to end of rnd.
Decrease rnd 3: With C2, *CDD, k1; rep from * to end of
rnd. 12 sts. Change to US11 24” ndl.

FINISHING Rnd 1: With C1, knit.


Cut yarn; thread through remaining sts and pull tight. Rnd 2: With C2, *k2, sl1 wyib, k1; rep from * to end of rnd.

Make 4” pompom from both C1 and C2. Attach at top. Repeat rnds 1 and 2 for 19 rnds or until work measures
about 6” from CO edge, ending with Rnd 1.
Weave in ends. Cut C2 and change to US10.

Rnds 1-4: *K1, p1; rep from * to end of rnd.


Rnd 5: Knit.

FINISHING
Bind off with sewn bind-off method (we recommend seeing
Purl Soho’s tutorial), or bind off all sts knitwise.

All efforts were made to make this pattern error-free. For questions or support, please email: info@fairmountfibers.com
8/22/19 © Fairmount Fibers Ltd. 2019 Not to be reproduced or re-knit for profit page 3 of 3

You might also like