SIEMENS Cond by FedéxTasag #7094069 1624
April 2, 2012 SD-L-SEI-TCH-0012
NSH: 0301
Termochilca S.A.C.
Ay. La Encalada 1388 Off. 601
Santiago de Surco
Lima 33, Péru
Re: Lump Sum, Tumkey, Engineering, Procurement and Construction Contract, dated as of March
24th, 2011 and any subsequent amendments (‘Contract’) between TERMOCHILCA S.A.C. (“Owner”),
Scotiabank Peru SAA. ("Bank") and Siemens Energy inc. (‘Contractor’) for Phase 1 of the Santo
Domingo de los Olleros Power Project
Subject: GSU Transformer No-Load Voltage
Dear Ms. Alegre:
Annex 11 of the Contract states thal the steady state volt of the grid is 500-KV +/-1% with a transient
voltage of 500-kV +/-4%, In our experience these are tight tolerances for a 500-Kv transmission system.
Based on the information provided in Annex 1 (copy attached), Contractor has established the following
winding ratio and main transformer characteristics:
138/184/230-MVA (preliminary)
No-load ratio: 505-kV / 16.5-kV.
Positive sequence impedance: 9.0% on 138-MVA, 505-KV base (approximate)
HY No-load Tap Changer Taps: #/- 2.5% x 2
No-load losses: 104-kW (preliminary)
Altached please a curve showing GSU Transformer High Voltage as Function of Generator Power Factor
based upon the preceding parameters.
Please review the attached information (with COES if necessary) and confirm that the stated transformer
characteristics are acceptable. Contractor is preparing to purchase the GSU Transformer and we need
to include this information in our specification.
Ifyou have any questions, please do not hesitate to contact me.
Sincerely,
SOA.
Richard G. Marron, PMP
General Project Manager
Attachment: (2 Pages)
Electronic Delivery
Carmen Tatiana Alegre Chaloo ‘malt: talewre@teemocilea.com
Eduardo Vieuna ‘allt: avicunag@sclea,com
Cesar Neston mall to: Gnorton@termochilca.com
José Antonio Zola malt: jzolla@termochilca.com
‘Jorge Mendoza Mujica ‘malt: mendoza@termochilca.com
Document Contra ‘mai to: ooumenteontrol@termechica.com
Siomens Energy, ne 4400 Altay Tat
Sein, #032026
sa140 | e6eq
zhozitie : 120
81%6'A¥-SOS”MO-EMOd”LOOLAd ‘ell
‘uy 'suewarg
(+49: aBe10n,
e68y0) Us 9 deL nso
403924 JeMoq Joye10U05
60
oor
ASO XEW 38 SORI0N PUD = em
[RUMION 32 88210) PUD —
TRUMWON 18 9520) PD age
(a2) e6ey10A PUD
oss
Jeuuoysuesd eyeulxoidde
uo peseq peyewijsy
4103984 Jemog JoJe1eUeN Jo UOHOUNY Se eBeyOA UBIH JouNlosued dn-dayg
oBujwog owes eo|!YoouNEL - LOOLAdSANTO DOMINGO POWER PLANT
CHILCA, PERU
‘TURNKEY DESIGN, ENGINEERING, PROCUREMENT AND CONSTRUCTION CONTRACT
AGREEMENT SCHEDULE
‘Agreement No: TCH-CSD-001
Rey.: 09
‘Type of installation preferred (Indoor | Outdoor
Outdoor)
Number of units to meet maximum load One
Black start Not required (initial start from Grid power)
Model of turbine Siemens SGT6-5000F(4)
Provision for expansion in future Space reserved for future 1x1x1 combined cycle
configuration
Provided for essential services and sale emergency
Emergency diesel generator Shutdown
Back up Fuel Not applicable
Power qualily Steady state supply S00KV + 1%
(Deviations > 10s defined as out of limits) 60Hz (59.0 to 61.2 Hz)
Transient supply BOOK + 4%
(Deviations < 10s defined as out of limits)
Underfrequency 56.5 Hz
Overfrequency 62.4 Hz
(Deviation < 108)
Underfrequency 55.8 Hz
(Deviation < 0.12 s)
Underfrequency Instantaneous
Trip 55.4 Hz
Overfrequency Instantaneous Trip
63.3Hz
NOx emission requirements 25 ppm vd @ 15% 2, Gas turbine to be equipped with Dry
Low NOx bumer
Further detail contained in
Noise 85 dBA from 1m distance Appendix E
Page 5 of 191
Siemens Energy, Inc.
Confidential