2/3/2021

Baby Stores Paint Area


Putty (/sqft) Primer Emulsion (/sqft) Quantity sqm to Quantity
Sl No Description Rate Amount
Coat 1 Coat 2 (/sqft) Coat 1 Coat 2 (m2) sqft (sqft)
Outside
Generator
side wall
1 having 2.75 2.75 1.5 2 2 11 60.96 10.76 655.9296 7215.2256
window
openings
Generator
side wall
2 without 2.75 1.5 2 2 8.25 133.98 10.76 1441.625 11893.4046
window
openings
Generator
3 side wall to 2.75 1.5 2 2 8.25 168.82 10.76 1816.503 14986.1514
backside
Generator
side wall with
terrace stair
4 2.75 1.5 2 2 8.25 152.88 10.76 1644.989 13571.1576
head
room(back
side)
Generator
side parapet
5 2.75 1.5 2 6.25 63.7 10.76 685.412 4283.825
to the back
side (Inside)
Generator
side small
6 1.5 2 3.5 83.65 10.76 900.074 3150.259
building
(Outside)
Generator
side parapet
7 1.5 2 3.5 88.1 10.76 947.956 3317.846
to the back
side (Outside)
8 Back side 2.75 1.5 2 2 8.25 46.2 10.76 497.112 4101.174
Well side
9 2.75 1.5 2 2 8.25 290.47 10.76 3125.457 25785.0219
short side
Well side long
10 2.75 1.5 2 2 8.25 156.48 10.76 1683.725 13890.7296
side
Front side
11 2.75 2.75 1.5 2 2 11 120.24 10.76 1293.782 14231.6064
(Glass)
Front side
12 2.75 2.75 1.5 2 2 11 39.44 10.76 424.3744 4668.1184
(Plain)
Front side
13 2.75 2.75 1.5 2 2 11 48.38 10.76 520.5688 5726.2568
(Entrance)
Front side
14 2.75 2.75 1.5 2 2 11 40.37 10.76 434.3812 4778.1932
(Stair)
Ramp side
15 2.75 2.75 1.5 2 2 11 196.4 10.76 2113.264 23245.904
(Front)
Ramp side
16 2.75 1.5 2 2 8.25 70.905 10.76 762.9378 6294.23685
(Toilet)
Ramp side
17 2.75 1.5 2 2 8.25 53.9 10.76 579.964 4784.703
(Stair OHT)
Ramp side
18 2.75 1.5 2 2 8.25 79.3 10.76 853.268 7039.461
(Lift Room)
Terrace - OHT
level Front
19 and Back 1.5 2 3.5 94.13 10.76 1012.839 3544.9358
Parapet(0.9m
)(Inside)
Terrace - OHT
20 side wall 2.75 1.5 2 6.25 79.3 10.76 853.268 5332.925
(outside)
Terrace -
21 parapet 2.75 1.5 2 6.25 113.19 10.76 1217.924 7612.0275
(1.2m)
Terrace back
side stair
22 2.75 1.5 2 6.25 22.51 10.76 242.2076 1513.7975
room
(outside)
190966.96

Putty Emulsion Quantity sqm to Quantity


Sl No Description Primer Rate Amount
Coat 1 Coat 2 Coat 1 Coat 2 (m2) sqft (sqft)
Inside
I Basement Floor
Retaining wall
1 1.5 1.5 274.97 10.76 2958.677 4438.0158
(Inside)

Retaining wall
sidewall near
2 1.5 1.5 10.1 10.76 108.676 163.014
DSI Electrical
room

DSI Electrical
3 1.5 2 3.5 26.78 10.76 288.1528 1008.5348
room (Inside)

Electrical
4 1.5 1.5 49.57 10.76 533.3732 800.0598
room (Inside)

Outside wall
of DSI
Electrical
room,
5 2.75 1.5 2 6.25 64.55 10.76 694.558 4340.9875
electrical
room, wall
towards
pump room
Pump room
6 1.5 1.5 42.48 10.76 457.0848 685.6272
(Inside)
Pump room
7 2.75 1.5 2 6.25 33.24 10.76 357.6624 2235.39
outside wall
Walls near
lift, duct and
8 stair (till 2.75 2.75 1.5 2 2 11 108.93 10.76 1172.087 12892.9548
beam
bottom)
9 Duct Area 2.75 2.75 1.5 2 2 11 20.04 10.76 215.6304 2371.9344
Columns (till
10 beam 2.75 1.5 4.25 107.45 10.76 1156.162 4913.6885
bottom)
Underside
slab
11 1.5 2 3.5 990.65 10.76 10659.39 37307.879
Basement
carpark

Underside
12 2.75 2.75 1.5 2 2 11 86.3 10.76 928.588 10214.468
slab BF Lobby

Compound
13 1.5 2 3.5 86.3 10.76 928.588 3250.058
wall
84622.6118
II Ground Floor
Inside wall -
commercial
1 space (till 2.75 2.75 1.5 2 2 11 301.53 10.76 3244.463 35689.0908
beam
bottom)
Columns (till
2 beam 2.75 2.75 1.5 2 2 11 27 10.76 290.52 3195.72
bottom)
Lobby (till
3 beam 2.75 2.75 1.5 2 2 11 102.54 10.76 1103.33 12136.6344
bottom)
4 Duct Area 2.75 2.75 1.5 2 2 11 24.27 10.76 261.1452 2872.5972

Generator
side Outside
5 2.75 1.5 4.25 69 10.76 742.44 3155.37
building
(Inside)

Underside
6 1.5 2 3.5 111.6 10.76 1200.816 4202.856
slab GF Lobby

Underside
7 slab GF 1.5 2 3.5 689.74 10.76 7421.602 25975.6084
carpark
87227.8768
III First Floor
Inside wall -
commercial
1 space (till 2.75 2.75 1.5 2 2 11 288.9 10.76 3108.564 34194.204
beam
bottom)
Columns (till
2 beam 2.75 2.75 1.5 2 2 11 25.92 10.76 278.8992 3067.8912
bottom)
Lobby (till
3 beam 2.75 2.75 1.5 2 2 11 97.85 10.76 1052.866 11581.526
bottom)
4 Duct Area 2.75 2.75 1.5 2 2 11 23.28 10.76 250.4928 2755.4208
Safe room (till
5 beam 2.75 2.75 1.5 2 2 11 43.82 10.76 471.5032 5186.5352
bottom)
6 UPS Room 2.75 2.75 1.5 2 2 11 43.82 10.76 471.5032 5186.5352
Underside
7 1.5 2 3.5 992.13 10.76 10675.32 37363.6158
slab FF
99335.7282
IV Second Floor
Inside wall -
commercial
1 space (till 2.75 2.75 1.5 2 2 11 239.37 10.76 2575.621 28331.8332
beam
bottom)
Columns (till
2 beam 2.75 2.75 1.5 2 2 11 21.6 10.76 232.416 2556.576
bottom)
Lobby (till
3 beam 2.75 2.75 1.5 2 2 11 79.11 10.76 851.2236 9363.4596
bottom)
4 Duct Area 2.75 2.75 1.5 2 2 11 19.28 10.76 207.4528 2281.9808
Meeting
room (till
5 2.75 2.75 1.5 2 2 11 35.66 10.76 383.7016 4220.7176
beam
bottom)

Fixture room
6 (till beam 2.75 2.75 1.5 2 2 11 35.66 10.76 383.7016 4220.7176
bottom)

Underside
7 1.5 2 3.5 992.13 10.76 10675.32 37363.6158
slab SF
88338.9006
V Third Floor
Lobby (till
1 beam 2.75 2.75 1.5 2 2 11 31.05 10.76 334.098 3675.078
bottom)
2 Duct Area 2.75 2.75 1.5 2 2 11 14.29 10.76 153.7604 1691.3644
Underside
3 1.5 2 2 95.02 10.76 1022.415 2044.8304
slab TF
Hand Rails
4 Staircase 31.5/sqft (1coat primer + 2coat paint) 31.5 34.86 10.76 375.0936 11815.4484
Front side

Hand Rails
5 31.5/sqft (1coat primer + 2coat paint) 31.5 34.86 10.76 375.0936 11815.4484
Fire Staircase

Hand Rails
6 Steel fire 31.5/sqft (1coat primer + 2coat paint) 31.5 27.21 10.76 292.7796 9222.5574
staircase
Roof Truss
7 40 Nos 950 38000
painting
Crack filling
Labour for
8 16 950 15200
generator
side
93464.727
VI Common to all Floors
Staircase
inside wall
area from
1 2.75 2.75 1.5 2 2 11 199.92 10.76 2151.139 23662.5312
Basement to
top floor
(near toilet)
Staircase
inside wall
area from
2 2.75 2.75 1.5 2 2 11 190.55 10.76 2050.318 22553.498
Basement to
top floor
(front side)

Staircase wall
area (from
3 Ground floor 2.75 2.75 1.5 2 2 11 184.6 10.76 1986.296 21849.256
to Terrace
floor)

Staircase slab
underside
paint area
4 2.75 2.75 1.5 2 2 11 51.51 10.76 554.2476 6096.7236
(Fire
staircase) (All
floors)

Staircase slab
underside
paint area
5 2.75 2.75 1.5 2 2 11 48.26 10.76 519.2776 5712.0536
(Frontside
Staircase) (All
floors)
Column
6 8 Nos 950 7600
grinding

7 Lift Pit Inside 1.5 1.5 319.68 10.76 3439.757 5159.6352

Duct Area
8 1.5 1.5 63.11 10.76 679.0636 1018.5954
(Inside)
93652.293

Total
Outside paint
1 190,966.96
area
Basement
2 84,622.61
area
3 Ground floor 87,227.88
4 First floor 99,335.73
5 Second floor 88,338.90
Third floor
6 93,464.73
area

Area common
7 93,652.29
to all floors

737,609.10

Paid Amount 1,102,520.00


Advance 364,910.90
Putty (/sqft) Primer Emulsion (/sqft)
Coat 1 Coat 2 (/sqft) Coat 1 Coat 2
2.75 2.75 1.5 2 2
7