Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 6

Date 15.03.

2023
Mines ROM (Paota-P) / Internal (A
Sr No. Time Frame Plant (OP)/Zarra Plant (
Veh. No. Time Weight Feed Veh. No.
1 10:00 7158 ### 20.40 Screen Plant
5635
7159 ### 20.24 Screen Plant 6018

7158 ### 22.04 Screen Plant 5635

7159 ### 20.32 Screen Plant

7158 ### 22.32 Screen Plant

7159 ### 21.93 Screen Plant

2 12:00 7158 ### 21.97 Screen Plant


6018
7159 ### 20.63 Screen Plant

7158 ### 22.44 Screen Plant

7159 ### 21.93 Old Plant stock

3 3:00 7159 ### 20.47 Screen Plant 5635

7158 ### 21.00 screen Plant

4 5:00

5 8:00

6 12:00 8578
5635

Total 12 255.69 7

Dispatch (Wash mater


Veh. No.

Diesel Issued 250 LTR.


Total 0

Date 15.03.2023
Data
Veh. No. Time Sum of Weight Count of Feed
25
7158 130.17 6
06:40:00 AM 20.4 1
07:58:00 AM 22.04 1 20
09:00:00 AM 22.32 1
10:01:00 AM 21.97 1 15
10:55:00 AM 22.44 1
12:13:00 PM 21 1
10
7159 125.52 6
06:41:00 AM 20.24 1
07:59:00 AM 20.32 1 5
09:02:00 AM 21.93 1
10:02:00 AM 20.63 1 0
10:56:00 AM 21.93 1 0 0 0 0 0
0 :0 8 :0 0 :0 1 :0 5 :0
4 5 0 0 5 :1
12:12:00 PM 20.47 1 0 6: 0 7: 0 9: 1 0: 1 0: 12
Total Result 255.69 12 58 58 58 58 58 58
71 71 71 71 71 71
ROM (Paota-P) / Internal (Antela- Old Press Breakdown/Stoppage Action Taken
Plant (OP)/Zarra Plant (ZP) )
Time Weight Remark Old 2nd Zarra
2 2 0
### 21.8
### 22.45

### 20.80

Power cut at 10.28 Power on 11:06


### 23.75

### 20.28
2 1 0

Power cut at 17:25

### 32.62 0 0 2
### 22.31

164.01 4 3 2

Dispatch (Wash material)


Time Weight Remark
0

Sum of Weight
Count of Feed

00 :0
0
:0
0
:0
0
:0
0
:0
0
:0
0
:0
0
:0
0
:0
0
:0
0
8: 0 0 0 1 5 5 1 3 4 1 5 9 0 2 0 2 5 6 1 2
0 9: 1 0: 1 0: 1 2: 0 6: 0 7: 0 9: 1 0: 1 0: 1 2:
5 8 5 8 5 8 5 8 5 9 5 9 5 9 5 9 5 9 5 9
71 71 71 71 71 71 71 71 71 71
15.03.2023
Clay Zarra
CDE Feed Filter Press Dispatch Dispatch Stopage / Breakdown Action being Taken
Time Frame (MT) (MT) (MT) (MT)

10:00 NIL NIL NIL NIL


CDE plant maintenance
running
(Jalli change)

12:00 NIL NIL 65.97 NIL CDE plant maintenance


running
(Jalli change)
pump no. 1 breakdown

CDE plant maintenance


03:00 NIL NIL 24.77 NIL running
(Jalli change)
pump no. 1 breakdown
05:30 NIL 12 NIL NIL
12:00 135 64 NIL NIL
Total 135 76 90.74 0

140

120

100

80

60

40

20

0
10:00 12:00 03:00 05:30
ROM from Finished Goods
Antela from Antela

20.53 NIL

20.54 NIL

NIL

20.06
NIL NIL
57.55 NIL
118.68 0

CDE Feed
(MT)
Filter Press
(MT)
China Clay
Dispatch (MT)
Zarra
Dispatch (MT)
ROM from
Antela
Finished Goods
from Antela

3:00 05:30 12:00

You might also like