Denver J. Añonuevo: Objective

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

Denver J.

Añonuevo
4200 Philippines
P. Genato. St. Batangas City
+63 09561679146 / +63928941562 |
denverjanonuevo073190@gmail.com / denverjanonuevo@gmail.com

OBJECTIVE
One of my goals today is to work in your company and be part of the progressive
organization in which I can contribute my knowledge and skills as well as gaining
experience for the advancement of my career and development of my potentials. I am
highly interested and I am unified with company that is driven to excellence and promote
professional development based on dedications, loyalty and work ethics.
EXPERIENCE
August Preventive Maintenance E&I Technician
2022 - NIKKERU PLANT MAINTENANCE SOLUTION INC. BRGY. TAGANITO SURIGAO DEL NORTE
Oct.2022 PHILIPPINES

Pullout and Replacement of smart transmitter/field instrument.


Rectification of all electrical and instrument substandard.
Pullout and re-instatement of valveaccessories
Tubingworks.
Calibrattion and re-ranging of smart transmitter/field instrument to meet the instrument
data sheet value and range.
Calibration and stroking of valve.
Trouble shooting of all faulty wirings.
Troubleshooting of abnormal reading of smart transmitter/field instrument.
Zero trimming of pressure transmitter before turn over to production.
Inspection and repairing of electrical power tools and equipments.
Overhauling and bearing replacement of motors such as agitator and pumpmotor.
Dec. E&I Electrical and Instrumentation Technician
2021 - NIKKERU PLANT MAINTENANCE SOLUTION INC. BRGY. TAGANITO SURIGAO DEL NORTE
Aug.2022 PHILIPPINES
SHELL MARKER INJECTOR SKID PROJECT
SICPA - AGIDENS 
Shell tabangao batangas project

From construction to commissioning:

Participate in daily Tool Box Talks and Conduct Job Safety Analysis to ensure full
understanding to work scope as per Permit requirements.
Participate in the planning and execution.
Fabrication and installation of supports for cable tray and stanchion.
Installation of cable tray fabrication/modification and installation of electrical and
instrument stanchion as per location drawing/field engineering required.
IRT test of power line and Instrument line cable before the cable laying.
Installation of tubing and airline.
Leak testing of tubing line.
Check the HP+ and LP- and trace if the impulse tube/pipe is corrected to the right point of
transmitter from the flow element.
Installation of tubing line with  respect  to P&ID and Hook-up diagram.
Check tapping orientation based on service and application of line.
Check the ferrules are correctly punched.
Installation of Lightings and junction boxes.
Installation of panel indoor transformer and junction box.
Cable glanding and termination to the JB Panel.
Installation of instrument equipment, electrical equipment.
Installation of fiber optic.
Calibration and testing of instrument prior to installation.
Visual inspection for complete and correct installation.
Resolve of all punchlist issues and conduct punch walk-thru with clients.
Assist to the vendor and client for pre-com and commissioning.

September E&I Electrical and Instrumentation Technician


19, 2020 NIKKERU PLANT MAINTENANCE SOLUTION INC. BRGY. TAGANITO SURIGAO DEL NORTE
- PHILIPPINES
November THPAL PLANT SHUTDOWN PROJECT
18, 2020 Preparation of PTW, JHA and other documents before execute the activity.
Double check the line and equipment, taggings to make sure thats is included to
shutdown list activity.
Proper communication to the production personel before execute the activity.
Disconnection of instrument equipment, electrical equipment with proper markings.
Cleaning all equipment and calibrate if needed.
Visual inspection for complete and correct installation. 
Communicate to DSC, for equipment testing.
Maintenance monitoring of motor, vibration test, temp.test, IRT&WRT.
Troubleshoot and perform root cause analysis for the electrical, instrumentation and
control systems.
Loop checking, Calibration, and Stroking of MOV.
Ensure that all work is executed and documented in accordance with client
policies for Health and Safety, Quality and Environmental protection.

August E&I Electrical and Instrumentation Technician


27, 2019 NIKKERU PLANT MAINTENANCE SOLUTION INC.
- October THPAL PLANT SHUTDOWN PROJECT
03, 2019 Preparation of PTW, JHA and other documents before execute the activity.
Double check the line and equipment, taggings to make sure thats is included to
shutdown list activity.
Proper communication to the production personel before execute the activity.
Disconnection of instrument equipment, electrical equipment with proper markings.
Cleaning all equipment and calibrate if needed.
Reinstatement of all instrument equipment.
Visual inspection for complete and correct terminals. 
Communicate to DSC, for equipment testing.
Maintenance monitoring of motor, vibration test, temp.test, IRT&WRT.
 Manage the function test of all instrumentation and controls in a safe condition.
Assist QA/QC during final inspection of skids, cranes or any other similar product that
encompasses Electrical and Instrumentation components.
 Strong understanding of Drawings.

January Instrumentation Technician


10,2019 - FPSO SUL, BLOCK 32 OIL FIELD KAOMBO SUL ANGOLA (SAIPEM)
May 07, HOOK-UP AND COMMISSIONING PROJECT
2019 Installation of all carry over works from onshore to offshore.
Assist to ATEX inspection
Troubleshoot and repair of all NON-ATEX equipment due to ATEX compliance.
Installation of tubing line with  respect  to P&ID and Hook-up diagram.
Check tapping orientation based on service and application of line.
Bending of airline and process line by using swagelock bender, rimmer and tube cutter in
any degree, slope with respect of hook-up diagram. 
Bending 3/4" , 1" inch by using electrical bender.
Check the ferrules are correctly punched.
Installation of fusible tubing line for deluge skid.
Check the HP+ and LP- and trace if the impulse tube/pipe is corrected to the right point of
transmitter from the flow element.
Installation of all transmitter and other e/i equipment.
Assist to the tools and materials coordinator.
 Strong understanding of Drawings.

April Instrumentation Technician


2018 - FPSO SUL, BLOCK 32 OIL FIELD KAOMBO NORTH ANGOLA (SAIPEM)
September HOOK-UP AND COMMISSIONING PROJECT
2018  
ATEX Inspection.
Troubleshoot and repair of all NON-ATEX equipment due to ATEX compliance.
Assist to the tools and materials coordinator.
Installation of tubing line with  respect  to P&ID and Hook-up diagram.
Check tapping orientation based on service and application of line.
Bending of airline and process line by using swagelock bender, rimmer and tube cutter in
any degree, slope with respect of hook-up diagram. 
Bending 3/4" , 1" inch by using electrical bender.
Check the ferrules are correctly punched.
Installation of fusible tubing line for deluge skid.
Check the HP+ and LP- and trace if the impulse tube/pipe is corrected to the right point of
transmitter from the flow element.
Installation of Lightings and junction boxes.
Installation of cable tray, cable pulling and fabrication of support.
Installation of panel indoor transformer and junction box.
Installation of conduit.
Cable glanding and termination to the JB Panel.
Cable Testing of power and signal cable.
Identify and troubleshoot the malfunction or defect.
Making a report for individual reference test sheet of each electrical and instrument.
Responsible to follow the superior instruction & implementation of the desired objective
for the completion of work in a targeted or possible earlier time following the safety
procedure.
Perform loop checking and testing of field instruments.
Loop checking, Calibration, and Stroking of MOV.
Ensure that all work is executed and documented in accordance with client
policies for Health and Safety, Quality and Environmental protection.
Participate in daily Tool Box Talks and Conduct Job Safety Analysis to ensure full
understanding to work scope as per Permit requirements.
Tools and materials coordinator.

August E&I Electrical and Instrumentation Technician


20, 2017 NIKKERU PLANT MAINTENANCE SOLUTION INC. BRGY. TAGANITO SURIGAO DEL NORTE
- October PHILIPPINES
04, 2017 THPAL PLANT SHUTDOWN PROJECT
Preparation of PTW, JHA and other documents before execute the activity.
Double check the line and equipment, taggings to make sure thats is included to
shutdown list activity.
Proper communication to the production personel before execute the activity.
Disconnection of instrument equipment, electrical equipment with proper markings.
Cleaning all equipment and calibrate if needed.
Reinstatement of all instrument equipment.
Visual inspection for complete and correct terminals. 
Communicate to DSC, for equipment testing.

May 03, E&I Electrical and Instrumentation Technician


2017 - NIKKERU PLANT MAINTENANCE SOLUTION INC. JG SUMMIT PETROCHEMICAL CORP.
May 17, SIMLONG BATANGAS
2017 JG SUMMIT SHUTDOWN PROJECT
Preparation of PTW, JHA and other documents before execute the activity.
Double check the line and equipment, taggings to make sure thats is included to
shutdown list activity.
Proper communication to the production personel before execute the activity.
Disconnection of instrument equipment, electrical equipment with proper markings.
Cleaning all equipment and calibrate if needed.
Reinstatement of all instrument equipment.
Visual inspection for complete and correct terminals. 
Communicate to DSC, for equipment testing.

February E&I Electrical and Instrumentation Technician


22, 2017 NIKKERU PLANT MAINTENANCE SOLUTION INC. BRGY. TAGANITO SURIGAO DEL NORTE
- March PHILIPPINES
28, 2017 THPAL PLANT SHUTDOWN PROJECT
Preparation of PTW, JHA and other documents before execute the activity.
Double check the line and equipment, taggings to make sure thats is included to
shutdown list activity.
Proper communication to the production personel before execute the activity.
Disconnection of instrument equipment, electrical equipment with proper markings.
Cleaning all equipment and calibrate if needed.
Reinstatement of all instrument equipment.
Visual inspection for complete and correct terminals. 
Communicate to DSC, for equipment testing.

May 26, E&I Electrical and Instrumentation Technician


2016 - (AGP / DSME)ANGOLA OFFSHORE MAFUMEIRA SUL PLATFORM CHEVRON PROJECT
November HOOK-UP AND COMMISSIONING PROJEC
30, 2016 Preparation of PTW, JHA and other documents before execute the activity.
Installation of tubing line with  respect  to P&ID and Hook-up diagram.
Check tapping orientation based on service and application of line.
Bending of airline and process line by using swagelock bender, rimmer and tube cutter in
any degree, slope with respect of hook-up diagram. 
Bending 3/4" , 1" inch by using electrical bender.
Check the ferrules are correctly punched.
Installation of fusible tubing line for deluge skid.
Check the HP+ and LP- and trace if the impulse tube/pipe is corrected to the right point of
transmitter from the flow element.
Assist to the tools and materials coordinator.
Installation of Lightings and junction boxes.
Installation of cable tray, cable pulling and fabrication of support.
Installation of conduit.
Cable glanding and termination to the JB Panel.
Cable Testing of power and signal cable.
Making a report for individual reference test sheet of each electrical and instrument.
Conducting RFI (request for inspection)before starting to another work.
Responsible to follow the superior instruction & implementation of the desired objective
for the completion of work in a targeted or possible earlier time following the safety
procedure.
Perform loop checking and testing of field instruments.
Loop checking, Calibration, and Stroking of MOV.
Ensure that all work is executed and documented in accordance with client
policies for Health and Safety, Quality and Environmental protection.
Participate in daily Tool Box Talks and Conduct Job Safety Analysis to ensure full
understanding to work scope as per Permit requirements.

April 12, E&I Electrical and Instrumentation Technician


2015 - (AGP) ATLANTIC GULF & PACIFIC COMPANY INC.
April 30, ICHTHYS PROJECT
2016 DOT printer operator for cable,core, cabinets & junction box taggings.
PTW and documents Coordinator 
Installation of instrument equipment
Installation of tubing line with  respect  to P&ID and Hook-up diagram.
Check tapping orientation based on service and application of line.
Bending of airline and process line by using swagelock bender, rimmer and tube cutter in
any degree, slope with respect of hook-up diagram. 
Bending 3/4" , 1" inch by using electrical bender.
Check the ferrules are correctly punched.
Installation of fusible tubing line for deluge skid.
Check the HP+ and LP- and trace if the impulse tube/pipe is corrected to the right point of
transmitter from the flow element.
Pre commissioning
Visual Inspection for complete and correct installation.

May 27, E&I Electrical and Instrumentation Technician


2013 - (AGP) ATLANTIC GULF & PACIFIC COMPANY INC.
April 05, BECHTEL PROJECT
2014 PTW and documents Coordinator 
Installation of instrument equipment
Installation of tubing line with  respect  to P&ID and Hook-up diagram.
Check tapping orientation based on service and application of line.
Bending of airline and process line by using swagelock bender, rimmer and tube cutter in
any degree, slope with respect of hook-up diagram. 
Bending 3/4" , 1" inch by using electrical bender.
Check the ferrules are correctly punched.
Installation of fusible tubing line for deluge skid.
Check the HP+ and LP- and trace if the impulse tube/pipe is corrected to the right point of
transmitter from the flow element.
Pre commissioning
Visual Inspection for complete and correct installation.
Installation of Lightings and junction boxes.
Installation of cable tray, cable pulling and fabrication of support.
Installation of panel indoor transformer and junction box.
Installation of conduit.
Cable glanding and termination to the JB Panel.
Cable Testing of power and signal cable.
Loop checking and Stroking of MOV.
Ensure that all work is executed and documented in accordance with client
policies for Health and Safety, Quality and Environmental protection.
Participate in daily Tool Box Talks and Conduct Job Safety Analysis to ensure full
understanding to work scope as per Permit requirements.

EDUCATION
2008- Bachelor of Instrumentation and Control Technology
2012 Batangas State University

PERSONAL DETAILS
Date of Birth : July 31, 1990
Marital Status : Single
Nationality : FILIPINO
Passport No. : EB6291901
SSS NO. : 04 - 2608936 - 2
PAG-IBIG NO. : 1210 - 9331 - 4999
PHILHEALTH NO. : 09 - 050375869 - 4
SEAFARERS BOOK NO. : 0923724 / C0847321

You might also like