Government Infrastructure Projects: Construction of Burgos-Lidlidda Road, Burgos, Ilocos Sur

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

GOVERNMENT INFRASTRUCTURE PROJECTS

CONSTRUCTION OF BURGOS-LIDLIDDA
1 ROAD, BURGOS, ILOCOS SUR

CONTRACTOR: MRK-SQUARE CONSTRUCTION AND SUPPLY


REGION: Region I - Ilocos Sur 2nd District Engineering Office
SOURCE OF FUND: GAA 2022 CSSP
COST: 19,597,446.12
NTP: April 4, 2022
CONTRACT EXPIRY DATE: August 14, 2022
STATUS: COMPLETED (100.00%)
DESCRIPTION: The project involved the concrete paving of a 388-
meter road and It involves the construction of a higher flat-slab
bridge with a width of 8.22-meters and 20-meter approach on both
sides.
PURPOSE AND BENEFITS: This project in Ilocos Sur is in support of
its program to improve connectivity across the country and provide
wider and safer access to motorists in Barangay Palali Norte. Also,it
improves Ilocos Sur’s road network leading to emerging tourist
destinations such as the Katayagan View Deck in Lilidda,
Simminublan Natural Water Park in Burgos, and alternate road to PRESENTED BY:
Payegpeg Falls in San Emilio, Ilocos Sur. ENGR. ARNOLD APOSTOL JR.
MEP - Civil Engineering
GOVERNMENT INFRASTRUCTURE PROJECTS
FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC
INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD
2 MITIGATION STRUCTURE ALONG VINTAR RIVER (BISLAK RIVER),
BRGY. CANAAM, SITIO CANADEM, VINTAR, ILOCOS NORTE

CONTRACTOR: ASIAN PEARL CONSTRUCTION & DEVT. CORP.


REGION: Region I - Ilocos Norte 1st District Engineering
Office
SOURCE OF FUND: GAA 2022 CSSP
COST: 48,360,631.63
NTP: April 4, 2022
CONTRACT EXPIRY DATE: October 21, 2022
STATUS: COMPLETED (100.00%)
DESCRIPTION: The project entails driving sheet piles, laying
rock embankment, and pouring concrete slope protection
PURPOSE: To reduce the detrimental effects of flood in the
low-lying residential areas
BENEFITS: The project is expected to spur economic growth
by protecting agricultural lands and local industries from
inundation.
PRESENTED BY:
ENGR. ARNOLD APOSTOL JR.
MEP - Civil Engineering
GOVERNMENT INFRASTRUCTURE PROJECTS
ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF
ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE -
3 ALAMINOS-BOLINAO RD - KO340+246 - KO340+500, KO341+278
- KO341+600 AT BRGY. TIEP, BANI, PANGASINAN

CONTRACTOR: RODEKOM GENERAL CONSTRUCTION AND


ENTERPRISE (38656) / ALCEL CONSTRUCTION
REGION: Region I - Pangasinan 1st District Engineering Office
SOURCE OF FUND: GAA 2022 OO-1
COST: 96,500,000
NTP: March 28, 2022
CONTRACT EXPIRY DATE: January 21, 2023
STATUS: COMPLETED (100.00%)
DESCRIPTION: The project involves the construction of stone
masonry and laying out of active wire mesh and erosion control
mat. Also covers the construction of a lined canal along the road
to ensure proper water flow during heavy rains.
PURPOSE AND BENEFITS: The slope protection project will
prevent landslides in Barangay Tiep, it is intended to make the
critical slope along Alaminos-Bolinao Road more stable as heavy
rains and natural calamities can trigger erosion and pose great PRESENTED BY:
risks to motorists.
ENGR. ARNOLD APOSTOL JR.
MEP - Civil Engineering
GOVERNMENT INFRASTRUCTURE PROJECTS

CONSTRUCTION OF MULTI-PURPOSE
4 5 BUILDING (MPB), BRGY. PUG-OS,
CABUGAO, ILOCOS SUR

PROJECT ID: 22AC0059


CONTRACTOR: FIT CONSTRUCTION
REGION: Region I - Ilocos Sur 1st District
Engineering Office
SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS
SOURCE OF FUND: GAA 2022 CSSP
(SIPAG) - CONSTRUCTION OF MULTI-PURPOSE BUILDING AT COST: 23,400,690.06
BARANGAY MACABITO, CALASIAO, PANGASINAN CALENDAR DAYS: 150
CONTRACTOR: MKM MARKETING
NTP: April 8, 2022
REGION: Region I - Pangasinan 4th District Engineering Office
SOURCE OF FUND: GAA 2022 CSSP CONTRACT EXPIRY DATE: October 4, 2022
COST: 4,717,043.96 STATUS: Terminated (00.00%)
NTP: March 28, 2022
CONTRACT EXPIRY DATE: January 21, 2023
STATUS: On-Going (93.02%) ENGR. ARNOLD APOSTOL JR.
MEP - Civil Engineering