The plan was to also cross a length of 1043m nary challenge for pipe di-
beneath the river Sheksna with a 56" gas line ameters of 56" (1420mm);
within the bounds of the project „North-Euro- pipes of this size have only
pean Gas Pipeline“, section Grjasowez – Wy- ever been installed in shor-
borg. Although a 56" gas line has never be- ter lengths with the HDD me-
fore been installed at such diatances using the thod by two or three compa-
HDD method and the soil conditions were very nies worldwide. In order to
complicated indeed, the decision was made pull a 56" steel pipe (1420
to under-cross the river using the directional x 25.8mm) into a bore hole
horizontal drilling technique. The river, situa- established by means of
ted approximately 400 km away from Moscow, the horizontal drilling tech-
was to be undercrossed in northern direction nique, you need a bore hole
by the Russian company JV VIS-MOS/LLC. The diameter of at least 1.80m
contractor of the entire project is JSC „Yamal- (71"). The soil volume trans-
GazInvest“. ported out of the bore hole
amounts to approx. 2.5m³
Foreword per running metre, this
makes a total of roughly
Directional horizontal bores exceeding a length 2650m³ of soil on the com-
of 1000m are quite common these days, when plete stretch of 1043m. Sto-
even bores of 3000m in one go have been red on a plane surface, you
achieved already. But this is still an extraordi- could use this soil to build a Foundling, brought to the surface
by the ND 1600 reamer.
bi UmweltBau 1 | 08 Horizontalbohren 35
1800mm, lead to the greatest difficulties. Not above the rubble and foundlings. In the central sponsible engineers at rest. Unnoticed by the
only was the reamer severely worn by the rocks, part of the bore, it could be moved with neu- “HDD community“ and rather unspectacular,
some of the rods in front of and behind the rea- tral buoyancy. the employees of JV VISMOS/LLC ORION STROY
mer were also fractured. The strong torque (up Pipe pulling needed all of 12 hours, at times, a have successfully completed a horizontal dril-
to 120 kNm) and alternating bending stress traction force of 280 t was required. This was ling project which has entered new dimensions
when the reamer was wedged into the found- mainly caused by the passage through the in reference to the bore length and pipe diame-
lings were simply too much, even for the 6 5/8" banks of the river and the foundlings in the ter, in 5 months of building time. By the way,
drill rods. bore hole, hampering the course. But the suc- for VISMOS, this was already the 12th success-
In order to improve the safety of the drilling cessful calibration run and the comforting fact ful bore and installation of a 56" pipe.
operations, the 100t rig used for the pilot bore that a pulling force of 450t was available at any Details are available at the e-mail address:
was positioned on the target side. Its job was to time put the minds of the drillmaster and the re- info@phrikolat.de ❚
keep the bore string under stress while continu-
ing the reaming work and pulling it back under
control whenever it got jammed. The same me-
thod was also applied for the concluding pipe
pulling process. To do so, the 5" bore string
had to be connected to the ND 1400 pipe ends
in a traction-tight fitting fashion and elonga- The reamer after
ted in progress while pulling in. Whenever the demounting, filled
with rocks.
pulling-in reamer was wedged, the crew could
pull it away from the problematic zone at inter-
vals and restart the operation.
A further technological challenge was the exit
angle of 6°, which is rather steep for a size 1400
steel pipe. Because of the very large minimal
bending radius of the gas line, this demanded a
particularly elaborate upper-arch construction.
If you mean to pull in a pipe ND 1400 through
such a long hole and in complicated geologi-
cal conditions, the required ballasting has to be
as uplift-neutral as possible. In this case, filling
up was modified in such a way as to give the
pipe line buoyancy while passing through the
river bank regions, allowing it to find its path