1. I-44 bridge rehabilitation – St. Louis County. This project


rehabilitates the two bridges over the Meramec River west of Lewis
Road. Drivers can expect shifted lanes as well as a ramp closure from
Lewis Road to westbound I-44. Should be complete in spring 2024
2. I-44 bridge replacement – St. Louis City. Replaces the Broadway
bridge over I-44 and the exit ramp from the I-70 express lanes onto the
Broadway bridge. Broadway over the interstate and the express lanes are
closed. Work continues through fall of 2023.
3. I-55 bridge improvements – St. Louis City and St. Louis County. eight interchanges, builds additional driving lanes in both directions,
This project replaces or rehabilitates the driving surfaces on several improves accessibility for pedestrians and cyclists; constructs multi-
bridges along I-55 between I-44 and Lindbergh. Drivers will have two use paths on both sides of highway, updates and reconstructs outer road
northbound and two southbound lanes between Potomac and Pestalozzi systems, updates signals and improves bridge lighting and spacing.
and between Weber and Virginia. The project continues through 2025. 13. I-270 bridge construction – St. Louis County. Illinois Department
4. I-55 from Route M to U.S. 67, U.S. 67 from Route 61 to Route CC, of Transportation project. Constructs a new I-270 bridge across the
and Route A from Collins Drive to Route 61/67 – Jefferson County. Mississippi River north of city of St. Louis. Construction on the new
New bridges, new traffic signals, additional lanes, resurfacing and bridge has begun, although initial traffic impacts should be minimal.
guardrail updates. Construction begins fall 2023. Drivers can expect narrowed and shifted lanes within that section.
5. I-70 Wentzville Parkway to Route Z- St. Charles County. Interstate Includes replacing the Riverview interchange at I-270. This is anticipated
widening, curve improvements and railroad bridge replacement. Work to be completed by the end of 2026.
tentatively set to begin winter 2023 and ends fall 2025 14. Route 21 between Route 141 and Schenk Road – Jefferson
6. I-70 from Fairgrounds to Cave Springs- St. Charles County. County. Rehabilitates 17 bridges, makes pavement repairs and
Interchange and outer road improvements. Work began summer 2022 and resurfaces. Will require long-term lane closures during bridge
ends summer 2024. rehabilitation.
7. I-170 – St. Louis County. Bridge rehabilitation at I-270. 15. Route 30 over I-44—Franklin County. Replace bridge deck.
8. I-170 – St. Louis County. Rehab and paint Midland/Lackland Bridges Requires full closure of Route 30 over I-44 and closure of all ramps from
over I-170. Construction anticipated to be completed by the end of 2023. Route 30 to I-44.
9. I-255 bridge rehabilitation – St. Louis County. Rehabilitates the 16. Route 30 bridge rehabilitation – St. Louis and Jefferson counties.
I-255 bridge across the Mississippi River (the Jefferson Barracks Bridge) This project rehabilitates the bridge over the Meramec River. Should be
and rehabilitates the Koch Road bridge on the interstate. In April 2023, complete in late 2023.
the westbound I-255 bridge will be closed. One lane in each direction 17. Route 67 Elevation Project – St. Charles County. Elevation of
will be closed, and the remaining two lanes of westbound traffic will be the southbound Route 67 lanes from one mile south of the Clark bridge.
shifted to the eastbound lanes of the I-255 bridge over the Mississippi Construction began summer 2021 and ends fall 2023.
River. During this work, the ramp from westbound to Koch Road will be 18. Route 94, Route 364 and Muegge Road – St. Charles County.
closed. Should be complete in late 2023. Construct a Diverging Diamond Interchange (DDI), adding additional
10. I-270 bridge rehabilitation – St. Louis County. This project ramp connections. Resurfacing, and adding a lane on Route 94 in each
rehabilitates the ramp bridges at the I-270 and I-64 interchange. The direction from Route 364 to I-70. Construction began winter 2021 and
project starts in spring 2023 and should be complete by summer 2024. ends summer 2023.
11. I-270 – St. Louis County. Replace bridge approaches and 19. Route 141 – St. Louis County. Bridge replacements over Levee
upgrade guardrails at Route 180 (St. Charles Rock Road) and drainage District Lakes (between I-70 and Route 370). To be completed by the end
improvements at Route 370. Completion is summer of 2023
12. I-270 – St. Louis County. I-270 North design-build project. 20. Route HH over Calvey Creek – Jefferson County. Replace bridge
Roadway improvements from McDonnell to Bellefontaine. Reconstructs and resurfacing. Bridge is closed during construction.